The Generic CO2 Geological Storage FEP Database, Version 1.1.0
Preamble
Abstract
This is the Generic CO2 Geological Storage Database of Features, Events and Processes (FEPs). It provides a tool to support the assessment of long-term safety and performance of geological carbon dioxide (CO2) storage.
Please note - this is Version 1.1.0 of the FEP database, which was superseded in December 2013 by The Generic CO2 Geological Storage FEP Database, Version 2.0.0. Version 2.0.0 is a substantial update that takes into account developments in understanding and evidence since this version.
Copyright
Copyright Quintessa Ltd. All rights reserved
Contact Information
Address: Quintessa Ltd, First Floor, West Wing, Videcom House, Newtown Road, Henley-on-Thames, OXON, RG9 1HG, U.K.
Telephone: +44 (0)1491 636246
Email: co2@quintessa.org
Website: www.quintessa.org
Sponsored by:
Features, Events and Processes
0 Assessment Basis
Category: (None)
Description
This category of FEPs determines the 'boundary conditions' for any assessment, specifying the spatial and temporal domain of the system. The Assessment Basis determines what is being assessed and why, so that those FEPs that need to be considered in the analysis can be defined, and those which can be 'screened out' as being outside the scope of the assessment can be identified.
0.1 Purpose of the assessment
Category: (None)
Description
The purpose of the assessment of geological CO2 storage.
Relevance to performance and safety:
The general purpose of an assessment of geological CO2 storage is to determine the performance of the storage system. In any specific case, however, the purpose of conducting an assessment may vary from simple calculations to test initial ideas for storage concepts, to support for an application for regulatory approval requiring detailed, site-specific performance assessment against relevant criteria. The level of complexity and comprehensiveness will vary according to the use to which it will be put. Additionally, the assessment endpoints of interest may not only vary in type, depending on the assessment purpose, but also in the level of rigour required for compliance demonstration.
References
- Bradshaw J, Bachu S, Bonijoly D, Burruss R, Holloway S, Christensen N and Mathiassen O (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Metz B, Davidson O, Bosch P, Dave R and Meyer L (eds.) (2007) IPCC 4th Assessment Report.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
0.2 Endpoints of interest
Category: (None)
Description
The assessment endpoints of interest.
Relevance to performance and safety:
The structure and composition of an assessment will tend to reflect the endpoints that are required to be assessed. These in turn, will reflect the criteria that are adopted to judge the overall performance of the storage system. Thus, for example, an assessment may be constrained to considering the degree of containment within a geological feature, alternatively, it may need to address potential near-surface impacts. Invariably, a combination of endpoints will be required.
References
0.3 Spatial domain of interest
Category: (None)
Description
The spatial domain of interest in the assessment.
Relevance to performance and safety:
The spatial domain of interest will be dependent on the site context, which may vary from generic assessments to site specific assessments, the storage concept and the endpoints of interest. The spatial domain will contribute to determining the information requirements and modelling capabilities that may be required.
0.4 Timescales of interest
Category: (None)
Description
Timescale of interest for the assessment.
Relevance to performance and safety:
Timescales over which the assessment will be performed will constrain processes which must be considered in the assessment. In general terms, there are two timescales of interest for geological storage of carbon dioxide. Firstly, there is that over which isolation of carbon dioxide from the atmosphere is necessary to mitigate climate change. This timescale is likely to be in the order of a few hundred years at most. The second timescale of interest is potentially much longer and is that pertaining to the assessment of potential hazard to humans and the environment. This timescale could be in the order of thousands to tens of thousands of years.
References
0.5 Storage assumptions
Category: (None)
Description
High level assumptions concerning the storage system(s) of relevance to the assessment. For example, the quantity of CO2 stored, the method of injection and information concerning the assumed performance of the storage system.

Relevance to performance and safety:
Provides a background to the storage technique adopted. Note that more detailed consideration of the CO2 storage system is provided in subsequent FEP categories.
References
- Bradshaw J, Bachu S, Bonijoly D, Burruss R, Holloway S, Christensen N and Mathiassen O (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
Links
0.6 Future human action assumptions
Category: (None)
Description
The assumptions made in the assessment concerning general boundary conditions for assessing future human action.
Relevance to performance and safety:
For example, it can be expected that human technology and society will develop over the timescales of relevance for the assessment of CO2 storage systems, however, this development is unpredictable. Therefore it may be necessary to make some assumptions in order to constrain the range of future human actions that are considered, such as assuming that only present-day technologies, or technologies practised in the past, will be considered.
References
0.7 Legal and regulatory framework
Category: (None)
Description
The legal and regulatory framework within which the assessment takes place.
Relevance to performance and safety:
In undertaking an assessment it is vital to consider the appropriate regulatory framework requirements. At one extreme these may be specific, prescriptive quantitative requirements, at the other they could be non-prescriptive or may not have been fully developed.
The legal and regulatory framework can shape various aspects of an assessment, such as the required assessment endpoints, timescales of interest and assumptions concerning future human actions.
References
- Brubaker R D and Christiansen A C (2001) The Fridtjof Nansen Institute.
- Lenstra W J and van Engelenburg B C W (2002) Intergovernmental Panel on Climate Change (IPCC) Workshop on Carbon Sequestration, November 18-22, 2002, Regina, Saskatchewan, Canada..
- Papanikolau N, Lau B, Hobbs W and Gale J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- West J, Pearce J, Bentham M, Rochelle C, Maul P and Lombardi S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Ide S, Friedmann S and Herzog H (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Lakemann B, Gunter W and Brown K (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Mace M, Hendriks C and Coenraads R (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Zakkour P and Haines M (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Figueiredo M, Reiner D, Herzog H and Oye K (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Sharma S, Cook P, Robinson S and Anderson C (2006) 8th International Conference on Greenhouse Gas Control Technologies.
0.8 Model and data issues
Category: (None)
Description
General methodological issues affecting the assessment modelling process and use of data
Relevance to performance and safety:
Examples of general model and data issues include the treatment of uncertainty; the method for handling site specific data; and the reduction/simplification of models and data.
References
- Bradshaw J, Bachu S, Bonijoly D, Burruss R, Holloway S, Christensen N and Mathiassen O (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Benbow S, Metcalfe R and Egan M (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Maul P, Metcalfe R, Pearce J, Savage D and West J (2007) International Journal of Greenhouse Gas Control.
1 External Factors
Category: (None)
Description
This category of FEPs describes natural or human factors that are outside the system domain. These FEPs are most important in determining scenarios for the future evolution of the system, and are often referred to as EFEPs (External FEPs). Three classes of FEPs are considered. Geological Factors and Climatic Factors are concerned with natural processes and events, whilst Future Human Actions is concerned with those human activities that can directly affect the storage system.
1.1 Geological factors
Category: (None)
Description
Natural geological processes and events in the environment outside the system domain that are relevant to the evolution of the storage system.
Relevance to performance and safety:
Changes in the geological environment outside the system domain may directly affect the transport of carbon dioxide within the system.
1.1.1 Neotectonics
Category: Event, Process
Description
Neotectonics is the study of crustal movements that both occurred in the Earth's recent past and are continuing at the present day. These movements, which are driven directly or indirectly by global plate motions (tectonics), result in the vertical and horizontal warping, folding or faulting of the Earth's surface.

Relevance to performance and safety:
Neotectonic events have the potential to cause sudden changes in the physical properties of rocks due to stress changes and induced hydrogeological changes.
1.1.2 Volcanic and magmatic activity
Category: Event, Process
Description
Magma is molten, mobile rock material, generated below and within the Earth's crust, which gives rise to igneous rocks when solidified. A volcano is a vent or fissure in the Earth's surface through which molten or part-molten materials (lava) may flow, and ash and hot gases be expelled.

Relevance to performance and safety:
The high temperatures associated with volcanic and magmatic activity may result in permanent changes in the surrounding rocks, either directly, or through circulating high temperature fluids. This FEP is relevant to CO2 storage in areas of potential magmatic activity, e.g. Japan.
References
- Metcalfe R, Ueda A, Kato K, Ohsumi T, Yajima T, Ito H, Kaieda H, Takase H, Savage D and Benbow S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Ueda A, Kato K, Ohsumi T, Yajima T, Ito H, Kaieda H, Metcalfe R and Takase H (2005) Geochemical Journal.
Links
1.1.3 Seismicity
Category: Event, Process
Description
Events and processes related to seismic events and also the potential for seismic events. A seismic event is caused by rapid relative movements within the Earth's crust usually along existing faults. The accompanying release of energy may result in rock movement and/or rupture, e.g. earthquakes.

Relevance to performance and safety:
Seismic events may result in changes in the physical properties of rocks due to stress changes and induced hydrogeological changes. Seismic events are most common in tectonically active or volcanically active regions at crustal plate margins.
References
- Li X, Koide H, Ohsumi T, Li Q and Wu Z (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
- Yamamoto K, Koide H, Tosha T, Aoyagi R, Nakanishi S, Todaka N, Benson S, Rutqvist J and Lewicki J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Yamamoto K and Koide H (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
1.1.4 Hydrothermal activity
Category: Process
Description
Processes associated with high temperature groundwaters, and hydrothermal alteration of minerals in the rocks through which the high temperature groundwater flows. Hydrothermal activity may be directly associated with volcanic and magmatic activity.
Hot springs, geysers and submarine hydrothermal vents provide evidence of hydrothermal activity (see pictures below).

Relevance to performance and safety:
Can result in the hydrothermal alteration of rocks or minerals by the reaction of hot water (and other fluids) with pre-existing rocks.
References
- Pichler T, Veizer J and Hall G E W (1999) Marine Chemistry.
- Humphries S E, Zierenberg R A, Mullineaux L S and Thompson R E (eds) (1999) American Geophysical Union.
- Metcalfe R, Ueda A, Kato K, Ohsumi T, Yajima T, Ito H, Kaieda H, Takase H, Savage D and Benbow S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
1.1.5 Hydrological and hydrogeological response to geological changes
Category: Process
Description
Processes arising from large-scale geological changes. These processes include changes in hydrodynamic boundary conditions, the effects of changes in the physical properties of geological units (e.g., porosity, permeability etc.), and variations in potential gradients driving water flow (e.g., topographical gradients). These changes are caused by rock stress accompanied by brittle and/or plastic deformation of the rock units.
Relevance to performance and safety:
Flow of groundwater within and surrounding a CO2 storage reservoir will influence the extent to which the CO2 remains in one location. If the CO2 does migrate, then groundwater flow will influence the routes taken and the extent to which the CO2 is dissolved and diluted. Physical changes to the rock units caused by geological changes may also create or destroy potential pathways for CO2 migration. In and below low-permeability geological formations, hydrogeological conditions may evolve very slowly and often reflect past geological conditions, i.e. be in a state of disequilibrium.
References
- Lowry T S, James S C, Jensen R M, Lee M Y, Lapping A R, Arnold B W, Gettemy G L, and Meier D K (2006) Sandia National Laboratories Report SAND2006-3570.
- Metcalfe R, Hooker P J, Darling W G and Milodowski A EParnell, J. (ed.) 1998. Dating and Duration of Fluid Flow and Fluid-Rock Interaction.
- Montgomery D R and Manga M (2003) Science.
- Moore G F et al. (2001) Geochemistry, Geophysics, Geosystems.
- Ruddiman, W.F.(ed) (1997) Springer-Verlag, Berlin.
- Tokunaga (1999) Journal of Hydrology.
- Vomvoris S, Scholtis A, Waber H N, Pearson F J, Voborny O, Schindler M and Vinard P (1999) Use of hydrogeochemical information in testing groundwater flow models - technical summary and proceedings of a workshop organized by the NEA Coordinating Group on Site Evaluation and Design of Experiments for Radioactive Waste Disposal (SEDE), Sweden.
Links
1.1.6 Large scale erosion
Category: Process
Description
Processes related to the large scale (geological) removal of rocks and sediments, with associated changes in topography and geological/hydrogeological conditions of the system.

Relevance to performance and safety:
Potential to modify the geological and hydrogeological environment.
Links
1.1.7 Bolide impact
Category: Event
Description
An extraterrestrial body in the 1-10-km size range, which impacts the earth at high velocity, explodes upon impact, and creates a large crater.

Relevance to performance and safety:
A low probability, high consequence event that has the potential to substantially disrupt the CO2 storage system. Often screened out on the basis that the impact of the bolide will greatly exceed that of the disruption caused to the storage system.
References
- Alvarez W (1998) Princeton.
- Smelror M, Kelly S R A, Dypvik H, Mork A and Nagy J (2001) Newsletter on Stratigraphy, 46(2/3).
Links
1.2 Climatic factors
Category: (None)
Description
Natural processes and events in the atmospheric environment that are relevant to the evolution of the storage system.
Relevance to performance and safety:
Changes in climate may directly affect the nature of any impacts that are incurred if carbon dioxide returns to the near-surface environment.
1.2.1 Global climate change
Category: Process
Description
The process of global climate change due to natural and/or anthropogenic causes. The last two million years of the Quaternary have been characterised by glacial/interglacial cycling. According to the Milankovitch Theory, the Quaternary glacial/interglacial cycles are caused by long-term changes in seasonal and latitudinal distribution of incoming solar radiation which are due to the periodic variations of the Earth's orbit about the Sun (Milankovitch cycles).
Evidence suggests that the Earth is presently in a period of global warming (see the figure below). The anthropogenic release of gases into the atmosphere may be increasing the rate of global warming by enhancing the natural 'greenhouse effect', a process by which longwave radiation emitted from the Earth is trapped in the atmosphere by 'greenhouse gases' such as CO2.

Relevance to performance and safety:
Changes in the global climate are likely to impact the CO2 storage system in a number of ways. For example, through it's affect on sea levels and the local and regional climate.
References
- Parry M, Canziani O, Palutikof J, van der Linden P and Hanson C (eds.) (2007) Fourth Assessment Report of the Intergovernmental Panel on Climate Change.
- Solomon S, Qin D, Manning M, Chen Z, Marquis M, Averyt K B, Tignor M and Miller H L (eds.) (2007) Fourth Assessment Report of the Intergovernmental Panel on Climate Change.
Links
1.2.2 Regional and local climate change
Category: Process
Description
Processes related to the possible future changes, and evidence for past changes, of climate at a storage site. This is likely to occur in response to global climate change, but the changes will be specific to a particular situation, and may include short term fluctuations.
Climate is characterised by a range of factors including temperature, precipitation and pressure as well as other components of the climate system such as oceans, ice and snow, biota and the land surface. The Earth's climate varies by location and for convenience broad climate types can be distinguished, e.g. tropical, savannah, Mediterranean, temperate, boreal and tundra. Climatic changes lasting only a few decades may be referred to as climatic fluctuations. These are unpredictable at the current state of knowledge although historical evidence indicates the degree of past fluctuations.
The response of regional and local scale climate to global climate change have been considered for its implication for the geological disposal of radioactive waste in the EC's BIOCLIM programme (see link below).

Relevance to performance and safety:
Changes in the regional and local climate could affect the CO2 storage system in a number of ways. For example, changes in groundwater recharge could affect regional hydrogeology and hence the transport of CO2 dissolved in groundwater. It may also alter the near-surface environment to which some of the stored CO2 may migrate. For a marine context, the near-surface environment includes both the seabed and also the overlying water column.
References
Links
1.2.3 Sea level change
Category: Process
Description
Processes related to changes in sea level which may occur as a result of global change, i.e. eustatic, and/or regional geological change, e.g. isostatic movements.
The component of sea-level change involving the interchange of water between land ice and the sea is referred to as "eustatic" change. As ice sheets melt so the ocean volume increases and sea levels rise. Sea level also changes with increased temperature due to thermal expansion and salinity changes, referred to as "steric" change. Sea level at a given location will also be affected by vertical movement of the land mass, e.g. depression and rebound due to glacial loading and unloading, referred to as "isostatic" change.

Relevance to performance and safety:
Sea level change may affect the storage system through its impact on the near surface environment and the regional or local hydrogeological regime. Potentially, sea level change could alter the disposition of on-shore and off-shore storage sites. For example, in some parts of the world, on-shore storage sites could become offshore storage sites as a result of sea level rise.
References
- Douglas B C (1995) Reviews of Geophysics.
- Parry M, Canziani O, Palutikof J, van der Linden P and Hanson C (eds.) (2007) Fourth Assessment Report of the Intergovernmental Panel on Climate Change.
- Solomon S, Qin D, Manning M, Chen Z, Marquis M, Averyt K B, Tignor M and Miller H L (eds.) (2007) Fourth Assessment Report of the Intergovernmental Panel on Climate Change.
- Lambeck K, Esat T M and Potter E K (2002) Nature.
- Siddall M, Rohling E J, Almogi-Labin A, Hemleben Ch, Meischner D, Schmelzer I and Smeed D A (2003) Nature.
Links
1.2.4 Periglacial effects
Category: Process
Description
Related to the physical processes and associated landforms in cold but ice-sheet-free environments.
Relevance to performance and safety:
An important characteristic of periglacial environments is the seasonal change from winter freezing to summer thaw with large water movements and potential for erosion. Frozen sub-soils are referred to as permafrost. Meltwater from seasonal thaw is unable to percolate downwards due to permafrost and saturates the surface materials. Permafrost layers may isolate the deep hydrogeological regime from surface hydrology, or flow may be focused at "taliks" (localised unfrozen zones, e.g. under lakes, large rivers or at regions of groundwater discharge).
Links
1.2.5 Glacial and ice sheet effects
Category: Process
Description
Processes related to the effects of glaciers and ice sheets within the region of a storage site. This is distinct from the effects of large ice masses on global and regional climate.
The ice sheet itself and the accompanying frozen ground (permafrost) beneath the majority of the ice sheet (the cold-based portion) may constitute a barrier to groundwater flow and to heat loss. If the basal transmissivity of the till and bedrock below the ice is low, water pressures may rise to levels equalling the ice pressure inducing the formation of major conduits in the subglacial material. The central parts of the ice sheet are likely to be warm-based and could permit groundwater recharge to take place, possible to great depths if high groundwater heads are generated at the base of the ice sheet. Discharge of groundwater is likely to take place close to and beyond the frontal parts of the ice sheet. Its location being determined, in part, by the presence, or otherwise, of permafrost and its thickness. Excessive recharge at the margin of the ice sheet could provide direct recharge of oxidising water to considerable depths in conductive fracture zones. If the permeability at and beyond the rim of the ice is low, e.g. due to permafrost, the water pressures may again build up resulting in hydrofracturing of the ice or the rock mass. As the ice sheet advances, these induced fractures may increase their aperture and depth due to freezing of subglacial meltwater.
Relevance to performance and safety:
Erosional processes (abrasion, overdeepening) associated with glacial action, especially advancing glaciers and ice sheets, and with glacial meltwaters beneath the ice mass and at the margins, can lead to morphological changes in the environment, e.g. U-shaped valleys, hanging valleys, fjords and drumlins. Depositional features associated with glaciers and ice sheets include moraines and eskers. The pressure of the ice mass on the landscape may result in significant hydrogeological effects and even depression of the regional crustal plate.
References
- Jansson P, Naslund J-O and Rodhe L (2007) SKB Technical Report TR-06-34.
- Degnan P, A Bath, A Cortes, J Delgado, S Haszeldine, A Milodowski, I Puigdomenech, F Recreo, J Silar, T Torres and E-L Tullborg (2005) PADAMOT Project Technical Report.
Links
1.2.6 Warm climate effects
Category: Process
Description
Processes related to warm tropical and warm desert climates, including seasonal effects, and meteorological and geomorphological effects special to these climates.

Relevance to performance and safety:
Regions with a tropical climate may experience extreme weather patterns (monsoons, hurricanes) that could result in flooding, storm surges, high winds etc. with implications for erosion and hydrogeology. The high temperatures and humidity associated with tropical climates result in rapid biological degradation and soils are generally thin. In arid climates, total rainfall, erosion and recharge may be dominated by infrequent storm events.
Run-off and erosion provide an input to the sediment supply to the terrestrial aquatic and marine environments. The sediment supply influences the sediment balance and helps to determine the flora and fauna present.
In warmer climates, both the terrestrial and marine flora and fauna are likely to be different from those found in colder climates.
References
- Parry M, Canziani O, Palutikof J, van der Linden P and Hanson C (eds.) (2007) Fourth Assessment Report of the Intergovernmental Panel on Climate Change.
- Smith Jr K L, Baldwin R J, Ruhl H A, Kahru M, Mitchell B G and Kaufmann R S (2006) Limnology and Oceanography.
Links
1.2.7 Hydrological and hydrogeological response to climate change
Category: Process
Description
Processes related to changes in hydrology and hydrogeology, e.g. recharge, sediment load and seasonality, in response to climate change in a region.
Relevance to performance and safety:
The hydrology and hydrogeology of a region is closely coupled to climate. Climate controls the amount of precipitation and evaporation, seasonal ice cover, and thus the soil water balance, extent of soil saturation, surface runoff and groundwater recharge. Vegetation and human actions may modify these responses.
References
1.2.8 Responses to climate change
Category: Process
Description
Processes relating to changes in ecology and human behaviour in response to climate change.
Climate affects the abundance and availability of natural resources such as water, as well as ecology, including the types of crops that can be grown by humans. Human responses, such as changes in habits, diet and the size of communities, are closely linked to climate and ecology. The more extreme a climate, the greater the extent of human control over these resources necessary to maintain agricultural productivity.

Relevance to performance and safety:
Changes in ecology and human behaviour in response to climate change will influence the relevant FEPs to be considered in the surface environment as an assessment extends into the future.
References
1.3 Future human actions
Category: (None)
Description
Human activities that are relevant to the evolution of the storage system.
Relevance to performance and safety:
Human activities may directly interfere with the stored fluid resulting in immediate or delayed impacts.
1.3.1 Human influences on climate
Category: Process
Description
Processes related to human activities that could affect the change of climate either globally or in a region.

Relevance to performance and safety:
Anthropogenic emissions of 'greenhouse' gases such as CO2 and CH4 have been implicated as factors in global warming. One of the primary aims of CO2 storage is to reduce the quantity of CO2 that is discharged to the atmosphere.
Regionally, climate can be modified by human activities such as de-forestation.
References
- Houghton J T, Ding Y, Griggs D J, Noguer M, van der Linden P J and Xiaosu D (Eds.) (2001) Cambridge University Press.
- Solomon S, Qin D, Manning M, Chen Z, Marquis M, Averyt K B, Tignor M and Miller H L (eds.) (2007) Fourth Assessment Report of the Intergovernmental Panel on Climate Change.
Links
1.3.2 Motivation and knowledge issues
Category: Event, Process
Description
Events and processes related to the degree of knowledge of the existence, location and/or nature of the storage site. Also, reasons for deliberate interference with, or intrusion into, a CO2 storage site after closure with complete or incomplete knowledge.
Knowledge of the storage site may be regained through post-closure airborne, geophysical or other surface-based non-intrusive investigation of a storage site. Such investigations might occur after information of the location of the storage system has been lost and therefore excludes monitoring of the storage system, but includes activities such as prospecting for geological resources. The evidence of the storage, such as injection boreholes, may itself prompt investigation.
Relevance to performance and safety:
Some future human actions could directly impact upon performance of the storage system. The following could be distinguished:
- inadvertent actions, which are actions taken without knowledge or awareness of the storage site, and
- deliberate actions, which are actions that are taken with knowledge of the storage system's existence and location, e.g. deliberate attempts to retrieve any hydrocarbons associated with the CO2, malicious intrusion and sabotage.
Intermediate cases, of intrusion with incomplete knowledge, could also occur.
1.3.3 Social and institutional developments
Category: Event, Process
Description
Events and processes related to changes in social patterns and degree of local government, planning and regulation.
Potentially significant social and institutional developments include:
- changes in planning controls and environmental legislation;
- demographic change and urban development;
- changes in land use;
- loss of archives/records, loss/degradation of societal memory.
Relevance to performance and safety:
Social and institutional developments have the potential to affect motivation and knowledge issues, human use of the surface and sub-surface environments and the type of impacts that may be considered.
References
1.3.4 Technological developments
Category: Event, Process
Description
Events and processes related to future developments in human technology and changes in the capacity and motivation to implement technologies. This may include retrograde developments, e.g. loss of capacity to implement a technology.
Relevance to performance and safety:
Of interest are those technologies that might change the capacity of humans to intrude deliberately or otherwise into a storage site, to cause changes that would affect the movement of CO2 and associated contaminants, or that may otherwise affect the performance and safety of the storage system. Technological developments are likely but may not be predictable especially at longer times into the future.
1.3.5 Drilling activities
Category: Event
Description
Events related to any type of drilling activity in the vicinity of the CO2 storage system. These may be taken with or without knowledge of the storage and may include activities such as:
- exploratory and/or exploitation drilling for natural resources;
- attempted recovery of residual hydrocarbon resources;
- drilling for water resources;
- drilling for site characterisation or research;
- drilling for further storage; and
- drilling for hydrothermal resources.
Relevance to performance and safety:
Has the potential to disrupt geological features that provide a barrier to CO2 migration and provide a relatively quick migration pathway to the near-surface.
Links
1.3.6 Mining and other underground activities
Category: Event
Description
Events related to any type of mining or excavation activity carried out in the vicinity of the storage site. These may be taken with or without knowledge of the site.
Mining and other excavation activities include:
- resource mining;
- excavation for industry;
- excavation for storage or disposal;
- excavation for military purposes;
- geothermal energy production;
- injection of liquid wastes and other fluids;
- scientific or archaeological investigation;
- shaft construction, underground construction and tunnelling;
- underground nuclear testing;
- malicious intrusion, sabotage or war;
- recovery of materials associated with CO2 injection (e.g. hydrocarbons).
Relevance to performance and safety:
Mining and other underground activities have the potential to disrupt the geosphere (storage reservoir, surrounding and overlying rock) and near-surface environment. They therefore have the potential to significantly affect the migration and distribution of stored CO2.
Links
1.3.7 Human activities in the surface environment
Category: Event, Process
Description
Events and processes related to any type of human activities that may be carried out in the surface environment that can potentially affect the performance of the storage system, or leakage pathways, excepting those FEPs related to water management which are described elsewhere.
Examples include:
- quarrying, trenching (e.g. for pipelines);
- boreholes;
- excavation for construction;
- residential, industrial, transport and road construction;
- pollution of surface environment and groundwater;
- land reclamation projects (e.g. offshore island construction, etc.);
- dredging of the seabed.

Relevance to performance and safety:
Human activities in the surface environment have the potential to affect CO2 release processes, should leakage occur. They may also determine the types of impact to be considered.
References
1.3.8 Water management
Category: Event, Process
Description
Events and processes related to groundwater and surface water management including water extraction, reservoirs, dams, and river management.
Water is a valuable resource and water extraction and management schemes provide increased control over its distribution and availability through construction of dams, barrages, canals, pumping stations and pipelines. Groundwater and surface water may be extracted for human domestic use (e.g. drinking water, washing), agricultural uses (e.g. irrigation, animal consumption) and industrial uses.

Relevance to performance and safety:
Extraction and management of water may affect the movement of CO2 or associated contaminants to and in the surface environment.
References
Links
1.3.9 CO2 presence influencing future operations
Category: Event
Description
The presence of injected CO2 may hinder future extractive operations by obscuring seismic traces or by making the drilling process more difficult. Conversely, the presence of CO2 locally, might allow for more economic future enhanced oil recovery operations. This FEP assumes that future technical advances might identify useable resources in the vicinity of previous CO2 injection.
Relevance to performance and safety:
Drilling through a formation filled with supercritical CO2 might cause 'blowouts' or loss of CO2 along the wellbore. A CO2 'bubble' will change the velocity of seismic waves, distorting the 'image' of the underlying formations, and reducing confidence in the understanding of this structure.
1.3.10 Explosions and crashes
Category: Event
Description
Events related to deliberate or accidental explosions and crashes such as might have some impact on a closed storage site, e.g. underground nuclear testing, an aircraft crash on the site, acts of war, marine collisions or trawler damage to exposed sea-bed structures.

Relevance to performance and safety:
Explosions and crashes are likely to be low probability events that could have a significant impact on the performance of the storage system by disrupting the expected evolution of the system.
2 CO2 Storage
Category: (None)
Description
This category of FEPs specifies details of the storage concept under consideration. It is split into two classes for the pre- and post-closure periods.
2.1 Pre-closure
Category: (None)
Description
Details of the storage concept, the fluids injected, and factors for the design, construction, operation and decommissioning phases.
Relevance to performance and safety:
The details of the storage concept are fundamental to determining which FEPs in other categories need to be considered in a given assessment. Some details of storage operations may affect the post-closure performance.
2.1.1 Storage concept
Category: Feature
Description
Features related to the concept of storage, such as whether a closure exists (storage in an abandoned oil or gas field) or whether isolation of CO2 is dependent upon slow diffusion rates through an areally extensive open structure (saline aquifer storage).

Relevance to performance and safety:
Different processes will be relevant to different storage concepts. For example, the rate of CO2 migration in an open aquifer will be relevant to safety assessment of saline aquifer storage, but less relevant to storage in a closed geological structure.
References
- Moburg R, Stewart D B and Stachniak D (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Torp T A and Gale J (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- van Bergen F, Pagnier H J M, van der Meer L G H, van den Belt F J G, Winthaegen P L A and Westerhoff R S (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- van der Meer L, Kreft E, Geel C, Hoore D and Hartmann J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- May F, Henke C, Berg C, Pusch G, Reinicke K, Meyn R, Rebscher D, Oldenburg C (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Little K, Payenberg T and Lang S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Hooper B, Koppe B and Murray L (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Monea M and Preston C (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Georgescu S, Lindeberg E and Holt T (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Polak S, Zweigel J, Pannetier-Lescoffit S, Lindeberg E, Zweigel P, Kunaver D, Krooss B, Alles S, Schulz H, Faber E, Teschner M, Poggenburg J and May F (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
2.1.2 CO2 quantities, injection rate
Category: Feature
Description
Features related to the amounts of CO2 injected and their rate of injection into the storage aquifer/reservoir.

Relevance to performance and safety:
High rates of CO2 injection could have adverse affects, such as hydrofracturing.
For fast injection rates, displacement of oil/water will not be efficient during enhanced oil recovery; instead one will recover CO2; premature break through is undesirable from an economic perspective.
References
- Fokker P A and van der Meer L G H (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Georgescu S, Lindeberg E and Holt T (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
2.1.3 CO2 composition
Category: Feature
Description
The composition and physical state (liquid, supercritical fluid etc.) of injected CO2, with contents of impurities etc. Temperature and pressure of injected fluid are also relevant.
During CO2 storage operations, the principal injected gas is CO2 captured and concentrated from human activity sources. However, the gas that is injected into a reservoir may not be 100% CO2, especially if there is some recycling of gas (in the case of enhanced oil recovery). Impurities can include: H2S, CH4, N2, NOx, SO2 and mercaptans. These may be present either intentionally or because it could be particularly difficult or superfluous to separate them from CO2.
Relevance to performance and safety:
The presence of even small amounts of other gases has a strong effect on the phase behaviour of CO2-dominated gases. High-pressure equations of state for CO2-dominated gas mixtures are required to take into account changes in critical pressures and temperatures caused by the presence of other gases. Impurities will reduce the critical temperature which, in turn, has effects on interfacial tension.
Amongst the possible companion gases, NOx and SO2 are particularly relevant because:
- NOx and SO2 are polluting gases that are generated by the same power plants that generate large amounts of CO2 and attract emission taxes in certain countries (e.g. Italy). Their injection, in smaller amounts, with CO2 could therefore help the economics of storage.
Impurities may affect pore water chemistry (pH and redox conditions, for example) depending on the impurities involved. Special care is needed when considering corrosive gases, such as H2S.
References
- Islam R, Malik Q, Huang S and Dong M (1999) Saskatchewan Research Council Publication Number P-110-468-C-99.
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
- Giorgis T, Carpita M, Battistelli A and Marzorati D (2006) 8th International Conference on Greenhouse Gas Control Technologies.
2.1.4 Microbiological contamination
Category: Feature
Description
Microbiological contamination of injected fluid. Contamination of supercritical CO2 is considered unlikely due to its being a very good solvent. However, other fluids may be injected into the storage site that may be contaminated with microbes.
Relevance to performance and safety:
The introduction of microbes into the storage system may affect both the performance of the storage system and the endpoints considered.
2.1.5 Schedule and planning
Category: Feature
Description
Features related to the sequence of events and activities occurring during storage system design, CO2 injection and sealing. This could include enhanced oil recovery processes.

Relevance to performance and safety:
Relevant events may include phased drilling of wells and emplacement of CO2, sealing of boreholes, and monitoring activities to provide data on the transient behaviour of the system or to provide input to the final assessment. The sequence of events and time between events may have implications for long term performance, e.g. chemical and hydraulic changes during a prolonged injection phase.
References
2.1.6 Pre-closure administrative control
Category: Feature
Description
Features related to measures to control events at or around the storage site during the design, construction, operation and decommissioning phases. The type of administrative control may vary depending on the stage in the storage system lifetime.
Relevance to performance and safety:
The pre-closure administrative control will influence the quantity and quality of information about the storage project that is available post-closure, therefore helping to determine societal memory. The better the amount and quality of information available, the lower the possibility of inadvertent intrusion.
2.1.7 Pre-closure monitoring of storage
Category: Feature
Description
Processes related to any monitoring undertaken during the operational and closure phase. The extent and requirement for such monitoring activities may be determined by issues such as storage concept, geological setting, regulations, or public pressure.
A number of monitoring techniques exist including seismic data, electrical resistance, soil gas and isotopic characteristics.
Relevance to performance and safety:
Monitoring during the operational phase contributes towards the amount and quality of information initially available after closure concerning the behaviour and distribution of stored CO2.
References
- Benson S M and Myer L (2002) Intergovernmental Panel on Climate Change (IPCC) Workshop on Carbon Sequestration, November 18-22, 2002, Regina, Saskatchewan, Canada..
- Arts R, Eiken O, Chadwick A, Zweigel P, van der Meer L and Zinszner B (2002) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Newmark R L, Ramirez A L and Daily W D (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Xue Z, Ohsumi T and Koide H (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Emberley S, Hutcheon I, Shevalier M, Durocher K, Gunter W D and Perkons E H (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Hoversten G M, Gritto R, Daley T M, Majer E L and Myer L R (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Myer L R, Hoversten G M and Gasperikova E (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Strutt M H, Beaubien S E, Beaubron J C, Brach M, Cardellini C, Granieri R, Jones D G, Lombardi S, Penner L, Quattrocchi F and Voltatorni N (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Zweigel P, Arts R, Bidstrup T, Chadwick A, Eiken O, Gregersen U, Homborg M, Johanessen P, Kirby G, Kristensen L and Lindberg E (2001) Extended abstract from the Annual Meeting of the American Association of Petroleum Geologists (AAPG), June 2001, Denver, Colorado.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Hovorka S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Pearce J, Chadwick A, Kirby G, Holloway S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Sakai A (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Chadwick A, Noy D, Lindeberg E, Arts R, Eiken O and Williams G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Daley T, Myer L, Hoversten G, Peterson J and Korneev V (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Dodds K, Sherlock D, Urosevic M, Etheridge D, de Vries D and Sharma S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Ebrom D, Buddery D, Watts G, Taylor B (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
2.1.8 Quality control
Category: Feature
Description
Features related to quality control procedures and tests during the design, and operation of the storage system.
It could be expected that a range of quality control measures would be applied during operation of the storage system and supply of CO2 to be stored. There may be specific regulations governing quality control procedures, objectives and criteria.
Relevance to performance and safety:
The degree of quality control during the design, construction, operation and decommissioning of a storage system can affect the post-closure performance by influencing the integrity of the engineered parts of the system (borehole seals, for example) and by influencing the quantity, quality and accuracy of records.
2.1.9 Accidents and unplanned events
Category: Event
Description
Events related to accidents and unplanned events during site investigation, CO2 emplacement and closure which might have an impact on long-term performance or safety.
Accidents are events that are outside the range of normal operations although the possibility that certain types of accident may occur should be anticipated in operational planning. Unplanned events include accidents but could also include deliberate deviations from operational plans, e.g. in response to an accident, unexpected geological events or unexpected aspects of CO2 quality and injection arising during operations.
Relevance to performance and safety:
Accidents and unplanned events may affect the post-closure performance of the storage system. One example may be the incomplete sealing of an injection borehole that may subsequently provide a pathway for CO2 migration.
2.1.10 Overpressuring
Category: Event, Process
Description
The CO2 injection process is greatly influenced by the target reservoir formation pressure (pore pressure).
The formation pressure is considered overpressure if it is above the normal hydrostatic pressure for the given depth, i.e. above the pressure at the bottom of a water column equal to the reservoir depth below surface. Overpressuring may occur at any depth, naturally or artificially. Man-made overpressure could be accidental or deliberate.
An example of deliberate overpressure is injecting gaseous CO2 in a shallow aquifer at a faster rate than water can drain from the reservoir zone. As more and more CO2 is injected, the CO2 gas column below the seal at the top of the reservoir increases and so the formation pressure at the top of the gas column. In such a case an artificial overpressure is created intentionally. The maximum tolerable overpressure is calculated as a function of the desired storage volume and of a chosen safety factor below the critical fracturing gradient of the top seal rock.
An example of accidental overpressure is given by the unforeseen depressurisation (water production, CO2 leakage) of a storage reservoir where the CO2 is in liquid form, below but near the critical phase change pressure. The change of phase to gas creates a gas column that could exercise an unforeseen overpressure at the top of the gas column.
Relevance to performance and safety:
Deliberate or accidental overpressuring during the operational phase will affect the initial geosphere conditions for a post-closure assessment. It has the potential to cause fractures in the sealing formation and hence provide migration pathways for the stored CO2.
2.2 Post-closure
Category: (None)
Description
Details of post-closure activities associated with storage.
Relevance to performance and safety:
Human activities post-closure may affect the likelihood of specific impacts being incurred.
2.2.1 Post-closure administrative control
Category: Process
Description
Administrative control of the storage site after closure of the project.
The administrative control of the post-closure site may differ from that of the pre-closure site with subsequent implications for the resources available for administrative control, the degree of access and availability of information etc.
Relevance to performance and safety:
There may be potential for loss of information in any transfer of administrative control. A lack of awareness about the details of a CO2 storage project could result in inadvertent disruption in the future.
2.2.2 Post-closure monitoring of storage
Category: Feature, Event, Process
Description
FEPs related to any monitoring undertaken during the post-closure phase. This includes monitoring of parameters related to the long-term safety and performance. The extent and requirement for such monitoring activities may be determined by issues such as storage concept, geological setting, regulations, or public pressure.
A number of monitoring techniques exist including seismic data, electrical resistance, soil gas and isotopic characteristics.

Relevance to performance and safety:
Post-closure monitoring will provide information regarding the performance of the storage project and may trigger post-closure remedial actions, if necessary.
References
- Arts R, Eiken O, Chadwick A, Zweigel P, van der Meer L and Zinszner B (2002) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Newmark R L, Ramirez A L and Daily W D (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Xue Z, Ohsumi T and Koide H (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Emberley S, Hutcheon I, Shevalier M, Durocher K, Gunter W D and Perkons E H (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Hoversten G M, Gritto R, Daley T M, Majer E L and Myer L R (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Myer L R, Hoversten G M and Gasperikova E (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Strutt M H, Beaubien S E, Beaubron J C, Brach M, Cardellini C, Granieri R, Jones D G, Lombardi S, Penner L, Quattrocchi F and Voltatorni N (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Blencoe J G, Cole D R, Horita J and Moline G R (2001) Online paper presented at the First National Conference on Carbon Sequestration.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Raistrick M, Shevalier M, Mayer B, Durocher K, Perez R, Hutcheon I, Perkins E and Gunter B (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Hovorka S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Pearce J, Chadwick A, Kirby G, Holloway S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Sakai A (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Chadwick A, Noy D, Lindeberg E, Arts R, Eiken O and Williams G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Daley T, Myer L, Hoversten G, Peterson J and Korneev V (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Dodds K, Sherlock D, Urosevic M, Etheridge D, de Vries D and Sharma S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
2.2.3 Records and markers
Category: Feature
Description
Features related to the retention of records of the content and nature of a CO2 storage site after closure and also the placing of permanent markers at or near the site.

Relevance to performance and safety:
It is expected that records will be kept to allow future generations to recall the existence and nature of the storage reservoir/aquifer following closure.
2.2.4 Reversibility
Category: Feature, Event, Process
Description
The degree to which the stored CO2 could be deliberately removed, if required. Either as an extreme remedial action, because the CO2 is required as a resource, or because its presence is impeding access to other geological resources.
Relevance to performance and safety:
The degree to which reversibility is considered in the design of a storage system may influence its long-term performance, by leaving viable boreholes in-situ after closure, for example.
2.2.5 Remedial actions
Category: Event, Process
Description
Events and processes related to actions that might be taken following closure of a storage site to remedy problems that, either, are associated with its not performing to the standards required, result from disruption by some natural event or process, or result from inadvertent or deliberate damage by human actions.

Relevance to performance and safety:
The aim of possible future remedial actions will be to modify the performance and safety of the CO2 storage system.
References
- Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) (2005) IPCC Special Report.
- Pearce J, Chadwick A, Kirby G, Holloway S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Barlet-Gouédard V, Rimmelé G and Goffé B (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Ito T, Kawamura Y, Sekine K and Hayashi K (2006) 8th International Conference on Greenhouse Gas Control Technologies.
3 CO2 Properties, Interactions & Transport
Category: (None)
Description
This category of FEPs is concerned with those Features, Events and Processes that are relevant to the fate of the stored fluid. Carbon dioxide's properties can vary greatly between conditions at depth and near surface, and a wide range of physical and chemical reactions can be important. The category is divided into three classes for the properties, interactions and transport of carbon dioxide.
3.1 CO2 properties
Category: (None)
Description
The fundamental physical and chemical properties of carbon dioxide, taking into account impurities.

Relevance to performance and safety:
Carbon dioxide's properties can vary greatly with pressure, temperature and impurities, and an understanding of these properties is essential before the fate of stored fluid can be assessed.
3.1.1 Physical properties of CO2
Category: Feature
Description
Physical properties of CO2 including density, viscosity, interfacial tension and thermal conductivity and their dependence on pressure and temperature.

Relevance to performance and safety:
The physical properties of CO2 determine the way in which it will behave in the environment once injected.
References
- Pruess K, Xu T, Apps J and Garcia J (2001) Paper SPE-66537, presented at SPE/EPA/DOE Exploration and Production Environmental Conference, San Antonio, Texas.
- Wittemann Co.Wittemann Co..
- Vesovic V Wakeham W A, Olchowy G A, Sengers J V, Watson J T R and Millat J (1990) Journal of Physical Chemistry.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Pironon J, Jacquemet N, Perfetti E, Lhomme T, Debessy J and Teinturier S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
3.1.2 CO2 phase behaviour
Category: Process
Description
FEPs related to the phase behaviour (gas, liquid, supercritical fluid) of CO2. The presence of contaminants in the injected CO2 (e.g. N2) and gas and hydrocarbons in the reservoir will affect the phase behaviour and partition of CO2 between different physical states.

Relevance to performance and safety:
CO2 phase behaviour is a primary consideration for modelling CO2 migration.
References
- Belonoshko A and Saxena S K (1991) Geochimica et Cosmochimica Acta.
- Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) (2005) IPCC Special Report.
- Pironon J, Jacquemet N, Perfetti E, Lhomme T, Debessy J and Teinturier S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
3.1.3 CO2 solubility and aqueous speciation
Category: Feature
Description
CO2 solubility is the amount of CO2 that can dissolve for given conditions in water. It can vary as a function of temperature, pressure and precise composition of the fluid (e.g. salinity, dissolved species/complexes, presence of hydrocarbons). Changing temperature and pressure accompanying migration of CO2 can therefore influence CO2 solubility, potentially leading to gas exsolution.
CO2 is present in the aqueous phase as: aqueous CO2; carbonic acid (H2CO3); bicarbonate (HCO3-); and carbonate (CO3--). Note that other dissolved ions (Na+, Mg++, Ca++, etc.) are also involved and provide an array of linked, reversible reactions.
Relevance to performance and safety:
CO2 solubility has an impact on the chemical composition of formation fluids, pressure distribution, 'sorption' processes, mineral-fluid reactions and the overall storage capacity of CO2. Dissolved CO2 may migrate in a different manner to 'free' supercritical CO2. CO2 solubility in water and its partition between aqueous, gaseous, and organic phases controls the efficiency of diffusive transport and successive mineral reactions.
The aqueous speciation of dissolved CO2 will impact upon the mobility of stored CO2 and associated contaminants.
References
- Ennis-King J and Paterson L (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Johnson J W and Nitao J J (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Rochelle C A, Czernichowski-Lauriol I and Milodowski A E (2004) Geological Society, London, Special Publications.
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
- Enick R M and Klara S M (1990) Chem. Eng. Comm..
- Bachu S and Adams J J (2003) Energy and Conversion Management.
- Toews K L, Schroll R M and Wai C M (1995) Analytical Chemistry.
- Suekane T, Mizumoto A, Nobuso T, Yamazaki M, Tsushima S and Hirai S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- van der Meer L, van Wes J and Nepveu M (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Georgescu S, Lindeberg E and Holt T (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
3.2 CO2 interactions
Category: (None)
Description
Potential interactions of carbon dioxide with solid, liquid or gaseous media.
Relevance to performance and safety:
A wide range of physical and chemical reactions can be important, and an understanding of these interactions is essential for the assessment of potential impacts.
3.2.1 Effects of pressurisation of reservoir on cap rock
Category: Process
Description
A storage reservoir will experience enhanced pressure due to injection of CO2. This may exceed original 'natural' pressurisation due to hydrocarbon emplacement, or clay mineral transformations during diagenesis.
Relevance to performance and safety:
'Overpressuring' of the reservoir may involve leakage of CO2 through the cap rock due to fracturing or enhanced interactions with CO2.
References
3.2.2 Effects of pressurisation on reservoir fluids
Category: Process
Description
Increased pressurisation caused by the injection of supercritcal CO2 will affect the behaviour of other fluids within the reservoir.

Relevance to performance and safety:
The potential importance of increased pressurisation to enhanced oil and gas recovery indicates that it can modify the mobility of other fluids in the receiving reservoir.
References
- Oldenburg C M and Benson S MEarth Sciences Division, Lawrence Berkley National Laboratory, USA.
- Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) (2005) IPCC Special Report.
- van der Meer L, Kreft E, Geel C, Hoore D and Hartmann J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Ebrom D, Buddery D, Watts G, Taylor B (2006) 8th International Conference on Greenhouse Gas Control Technologies.
3.2.3 Interaction with hydrocarbons
Category: Process
Description
Hydrocarbons could be mobilised by CO2, by miscible displacement for example, and transported to the near-surface. This is of particular relevance if enhanced oil recovery is an additional aim of the storage concept. Kolak and Burruss (2003) demonstrate that polyaromatic hydrocarbons (PAHs) can be mobilised by storage in deep coal beds.
Stored CO2 can also precipitate asphaltenes from crude oil under certain conditions of composition, temperature and pressure. Such precipitation in the vicinity of injection wells can lead to loss of injectivity and even plugging of the wells.
Relevance to performance and safety:
Mobilised hydrocarbons may migrate to the near-surface environment.
Precipitated asphaltenes can clog pores, reducing permeability and affecting fluid flow paths.
References
3.2.4 Displacement of saline formation fluids
Category: Process
Description
Injection of CO2 into a geologic formation may result in displacement of saline formation fluids into potable water supplies. Limitations on the pressure in a formation (for seal integrity) will mean that existing fluids are displaced/replaced. Displaced fluids are highly likely to be saline. Because the pressure wave created by injection travels much further than the physical CO2 front, displacement of saline formation fluids can occur at locations outside the CO2 storage area. Inter-connection of aquifer systems may enable saline fluids to enter potable water formations.
Relevance to performance and safety:
Displaced saline formation fluids may contaminate near-surface aquifers with subsequent impacts, such as contamination of potable water supplies.
References
3.2.5 Mechanical processes and conditions
Category: Feature, Process
Description
Features and processes related to the mechanical processes and conditions resulting from the injection of CO2 that affect the rock, boreholes and other engineered features, and the overall mechanical evolution with time. This includes the effects of hydraulic, mechanical and thermal loads imposed on the rock by the injected CO2. Injection of CO2 into a reservoir can cause (directly or indirectly) changes of the geomechanical properties of the reservoir rock. Direct changes can be due to change of reservoir pressure and temperature (PVT system). Indirect changes (of rock properties) might result from geochemical and mineralogical changes after storage of CO2.
Relevance to performance and safety:
Mechanical changes of the reservoir resulting from CO2 injection (such as generation of fractures, reactivation of fractures/faults, changes of bulk elastic properties and effective reservoir) could lead to subsidence/uplift (at surface), induced seismicity, changes in migration pathways, even burst/leakage of the seal. Examples of other relevant processes are: borehole lining collapse; rock volume changes, leading to cracking
References
3.2.6 Induced seismicity
Category: Event, Process
Description
Injection of CO2 may cause and trigger seismic events and earthquake hazards through processes such as reducing friction at existing faults. This may occur both in seismically active areas and in areas characterised by a low background seismicity (reactivation of ancient fault planes, changes in the orientation, fluid-pockets occurrence). This FEP includes microseismicity.

Relevance to performance and safety:
Seismicity can introduce sudden physical changes to the storage system and may expose any local population to earthquake hazards.
References
- Sminchak J, Gupta N, Byrer C and Bergman P (2002) Journal of Energy and Environmental Research.
- Li X, Koide H, Ohsumi T, Li Q and Wu Z (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
- Chiaramonte L, Zoback M, Friedmann J and Vicki Stamp (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Deflandre J, Andonof L, Fabriol H and White D (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Yamamoto K and Koide H (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Yamamoto K, Koide H, Tosha T, Aoyagi R, Nakanishi S, Todaka N, Benson S, Rutqvist J and Lewicki J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
3.2.7 Subsidence or uplift
Category: Process
Description
Injecting the CO2 may cause acidification of formation water, leading to mineral dissolution and subsidence. This is of particular relevance to shallow storage sites.
Injection of large quantities of CO2 into a confined aquifer may increase pore pressure and 'lift' the overlying rocks upwards.
Relevance to performance and safety:
Deformation may affect geological processes and may result in impacts of concern at the surface.
References
3.2.8 Thermal effects on the injection point
Category: Feature, Process
Description
Temperature of the injected fluid could result in geological modification of the region around the point of injection due to thermal gradients.
Relevance to performance and safety:
These thermal effects could influence the mobility of the injected CO2 and impurities.
References
Links
3.2.9 Water chemistry
Category: Feature, Process
Description
Water phase geochemistry of stored CO2. This includes the solubility trapping of CO2 in water (H2O) to form carbonic acid (H2CO3). Subsequent ionic trapping of carbonic acid with hydroxide ions (OH-) forms bicarbonate ions (HCO3-), which can react in turn with further hydroxide ions to form carbonate (CO3).

Relevance to performance and safety:
Modification of the water phase geochemistry can disturb the equilibria between the water and solid phase of the reservoir and result in further geochemical (for example, solid phase geochemistry) and physical changes with resulting implications for the long-term performance of the storage system.
References
- Gunter W D (2001) Online presentation from the 2001 Workshop on Carbon Sequestration Science.
- Dall'Aglio, M., Quattrocchi, F., Tersigni, S. (1995) Annali di Geofisica.
- Johnson J W and Nitao J J (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Rochelle C A, Czernichowski-Lauriol I and Milodowski A E (2004) Geological Society, London, Special Publications.
- Haszeldine S, Lu J, Wilkinson M and Macleod G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Raistrick M, Shevalier M, Mayer B, Durocher K, Perez R, Hutcheon I, Perkins E and Gunter B (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Assayag N, Matter J, Ader M and Agrinier P (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Sass B, Gupta N, Jagucki P, Meggyesy D, Massey-Norton J and Spane F (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- O'Connor W, Rush G and Gerdemann S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
3.2.10 Interaction of CO2 with chemical barriers
Category: Process
Description
Chemical barriers (pH, Eh-pH, ion exchange) may exist in aquifers to retard the migration of CO2 from depth. The precipitation of CO2 bearing solids may result from such interactions.

Relevance to performance and safety:
Such barriers will affect the rate of migration of CO2 from depth.
References
3.2.11 Sorption and desorption of CO2
Category: Process
Description
The sorption and desorption of CO2 on geological materials. Sorption onto coal and the displacement of methane (CH4) is the primary mechanism behind the enhanced coalbed methane recovery (ECBM) method for geological CO2 storage.

Relevance to performance and safety:
The rate of sorption and desorption of CO2 on geological materials affects its mobility and therefore the performance of the storage system.
References
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
- Ohga K, Sasaki K, Deguchi G and Fujioka M (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Shi J Q and Durucan S (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Reeves S R and Schoeling L (2001) Greenhouse Gas Control Technologies: Proceedings of the 5th International Conference on Greenhouse Gas Control Technologies.
- Jaffe P R and Wang S (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) (2005) IPCC Special Report.
- Faiz M, Saghafi A, Barclay S, Stalker L, Sherwood N and Whitford D (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- van Bergen F, Pagnier H, Krzystolik P (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Connell L, Day S, Pan Z, Duffy G, Sakurovs R, Saghafi A and Wright J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
3.2.12 Heavy metal release
Category: Process
Description
Heavy metal ions may be dissolved in formation fluids or sorbed on rock/mineral surfaces. Complexation may occur between CO2 and heavy metals dissolved in formation fluids. The influence of dissolved CO2 on pore water chemistry can also reduce the pH and change the equilibrium between sorption/desorption of metals, thereby resulting in significant release of these metals.
Relevance to performance and safety:
This process has the potential to release heavy metals, which may then migrate to the near-surface environment with resulting impacts of interest. These heavy metals will also change pore water chemistry, which could impact on carbonate complexation.
References
3.2.13 Mineral phase
Category: Feature, Process
Description
Geochemistry of the mineral phase relevant to stored CO2, including ion exchange and mineral dissolution.
Relevance to performance and safety:
Geochemical reactions between stored CO2 and the mineral phase of the storage system will affect the evolution of the system and the sorption (and therefore mobility) of the CO2.
References
3.2.13.1 Mineral dissolution and precipitation
Category: Process
Description
The dissolution of minerals due to the addition of CO2 (an 'acid gas') to the geochemistry and precipitation. For example, the dissolution of albite and precipitation of calcite modelled for the Sleipner site by Gaus et al. (2003).
Relevance to performance and safety:
CO2 reaction with the host rock will modify: the porosity and permeability of the reservoir; fluid flow (direction or velocity); mechanical properties (e.g. strength); and CO2 storage capacity.
References
- Bruant R G, Giammar D E, Myneni S C B and Peters C A (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Rochelle C A, Czernichowski-Lauriol I and Milodowski A E (2004) Geological Society, London, Special Publications.
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
- Johnson J W and Nitao J J (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Gaus I, Azaroual M and Czernichowski-Lauiol I (2003) Proceedings of the 2nd Annual Conference on Carbon Sequestration, 5-8 May 2003, Alexandria, VA, US.
- Gunter W D, Perkins E H and Hutcheon I (2000) Applied Geochemistry.
- Law D H S and Bachu S (1996) Energy Conversion and Management.
- Watson M and Kirste D (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Giorgis T, Carpita M, Battistelli A and Marzorati D (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Dafaud F, Martinez I, Shilobreeva S, Goffe B and Fiquet G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Carey J, Duan R, Kaszuba J and Chipera S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Assayag N, Matter J, Ader M and Agrinier P (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Rochelle C, Bateman K, Pearce J, Turner G, Upton S and Wallis H (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Bateman K, Turner G, Pearce J, Birchall D and Rochelle C (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Bekri S, Egermann P and Vizika O (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- O'Connor W, Rush G and Gerdemann S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
3.2.13.2 Ion exchange
Category: Process
Description
The process of exchanging one ion in the liquid phase for another ion on a charged, solid substrate.
Injected CO2 may perturb ion exchange equilibria between relevant minerals (such as sheet silicates) and the pore fluid. Some cations may be released to the pore fluid and others fixed as a consequence.
Relevance to performance and safety:
Disturbance of the rock-pore fluid equilibria may affect the capacity of the rock to store CO2.
References
Links
3.2.13.3 Desiccation of clay
Category: Process
Description
CO2 is likely to be dried to prevent corrosion during transport. Injection of dry CO2 will cause it to take up water from the pores of the host formation and overlying rocks. It has the potential to 'suck' water out of an overlying clay.
Relevance to performance and safety:
If clay dehydrates, it will shrink and crack. This might aid CO2 migration upwards.
References
- Rochelle C A, Czernichowski-Lauriol I and Milodowski A E (2004) Geological Society, London, Special Publications.
- Okamoto L, Li X and Ohsumi T (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Aylmore L A G, Sills I D and Quirk J P (1970) Clays and Clay Minerals.
3.2.14 Gas chemistry
Category: Feature, Process
Description
Gases such as CO2, methane and H2S, will occur naturally in the geosphere, either sorbed onto minerals, dissolved in formation fluids or as a free gas phase. Gas solubility will depend upon pressure, temperature and the salinity of the formation fluid.
Relevance to performance and safety:
Gases naturally present in the geosphere could affect the behaviour of CO2 injected into a storage reservoir and could accompany CO2 along potential migration paths.
References
- Reeves S (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Faiz M, Saghafi A, Barclay S, Stalker L, Sherwood N and Whitford D (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
3.2.15 Gas stripping
Category: Process
Description
CO2 migration through the reservoir and into the overlying barrier sequence could result in the CO2 stripping other gases entrained within the sediments. These gases could include radon, methane (CH4) and hydrogen sulphide (H2S).
Relevance to performance and safety:
The presence of other gases in a leaking CO2 gas stream is important in deciding the level of CO2 leakage that can be tolerated and may constitute an important hazard.
References
- Reeves S R and Schoeling L (2001) Greenhouse Gas Control Technologies: Proceedings of the 5th International Conference on Greenhouse Gas Control Technologies.
- Faiz M, Saghafi A, Barclay S, Stalker L, Sherwood N and Whitford D (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
3.2.16 Gas hydrates
Category: Process
Description
Gas hydrates are 'ice-like' solids that form at low temperatures and high pressures. They are formed of 'cages' of water molecules surrounding a gas molecule.
Relevance to performance and safety:
Cooling of the reservoir (e.g. by injecting cold CO2 or through adiabatic expansion) well below normal in-situ temperatures might stabilize gas hydrates. Their growth might seal fluid flow pathways (at least temporarily).
If CO2 is injected below deep water or permafrost then rising CO2 might hit the hydrate stability zone before escaping to the ocean or air, so hydrates could act as a secondary chemical barrier. Similarly, storage could be focused on actively forming CO2 hydrate as a stable, immobile phase to lock up the CO2 (Koide et al., 1997).
References
- Koide H, Takahashi M, Shindo Y, Tazaki Y, Iijima M, Ito K, Kimura N and Omata K (1997) Energy.
- Dendy Sloan E, Jr (1998) Marcel Dekker, Inc.
- Buanew T and Kvamme B (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Camps A, Rochelle C, Mildowski T, Long D, Lovell M, Bateman K, Gunn D, Jackson P and Rees J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
3.2.17 Biogeochemistry
Category: Feature, Process
Description
Features and processes related to the biological/biochemical processes that affect the CO2, borehole seals and rock/pore fluid, and the overall biological/biochemical evolution with time. This includes the effects of biological/biochemical influences on the CO2 and engineered components by the surrounding geology. Microbes exist in the subsurface and are used in hydrocarbon operations to improve hydrocarbon recovery. Microbes can also catalyse geochemical reactions, including methanogenesis, but the latter reaction is thermodynamically unfavourable and is unlikely.

Relevance to performance and safety:
Examples of relevant processes are:
- microbial growth;
- microbially/biologically mediated processes; and
- microbial/biological effects of evolution of redox (Eh) and acidity/alkalinity (pH) , etc.
This FEP has probably low relevance to the safety/fate of CO2. However, CO2 releases may affect/impact microbe populations being used in independent hydrocarbon-recovery enhancement projects.
References
3.2.18 Microbial processes
Category: Process
Description
Microbes can metabolise CO2, for example, methanogenic microbes use H2 to reduce CO2 to methane (CH4), a process called methanogenesis. These microbes need anaerobic conditions.
Relevance to performance and safety:
Methanogenesis, if it occurs, could affect the pressure distribution of CO2. The fate and impact of the CH4 produced may be an endpoint of interest in itself.
References
- West J M and Chilton P J (1997) Quarterly Journal of Engineering Geology and Hydrogeology.
- Koide H, Nishimura S, Satsumi S, Xue Z and Li X (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Ehrlich H L (1996) Marcel Dekker, Inc., New York.
3.2.19 Biomass uptake of CO2
Category: Process
Description
If stored CO2 migrates to the biosphere, it can be taken up by microbes, plants and algae (including phytoplankton).
Relevance to performance and safety:
This mechanism may provide a sink for CO2 that has migrated from the storage system.
References
- Casareto B, Suzuki Y, Niraula M, Magi M and Yamada K (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Casareto B, Magi M, Kurosawa K, Niraula M, Takagi N and Suzuki Y (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Kishi Y, Watanabe Y, Ishida H and Nakata K (2006) 8th International Conference on Greenhouse Gas Control Technologies.
3.3 CO2 transport
Category: (None)
Description
Transport processes that may affect stored carbon dioxide and associated impurities.
Relevance to performance and safety:
An understanding of those processes that could transport carbon dioxide, and associated impurities, within the geosphere, near-surface and surface environments is fundamental to the assessment of long-term performance and safety.
3.3.1 Advection of free CO2
Category: Feature, Process
Description
Advection of free CO2 occurs in response to differences in pressure. The pressure difference may be due to differences in the pressure of injected CO2 and formation pressures.
The rate and direction of advection is affected by the physical properties of the rock, such as porosity and permeability.
Advection may also occur though fractures. Fracture flow will be episodic with high transport efficiencies. Resealing of fractures (for example by cementation) will reduce and ultimately block fluid flow.
Relevance to performance and safety:
Advective flow is a key transport process for migrating CO2, and associated contaminants, in the geosphere (reservoir, surrounding and overlying rock), near-surface and surface environments.
References
3.3.1.1 Fault valving
Category: Event, Process
Description
Fault valving is a process resulting from gradual build up of pore pressure due to fluid generation, causing the subsequent opening of a fault along with fluid escape towards surface. This mechanism has been recognised as causing earthquakes in many parts of the world, as a result of hydrocarbon generation or infiltration of other fluids.

Relevance to performance and safety:
Large releases of pore fluids may occur during fault valving episodes.
References
- Quattrocchi, F (1999) Annali di Geofisica.
- Sibson R H (1981) In: Simpson, D.W. & Richards, P.G. (eds.), Earthquake Prediction: An International Review.
- Sibson R H (1992) Tectonophysics.
- Bodmer H P (1994) Bull. Swiss. Assoc. of Petroleum - Geol. and Eng.
- Chiaramonte L, Zoback M, Friedmann J and Vicki Stamp (2006) 8th International Conference on Greenhouse Gas Control Technologies.
3.3.2 Buoyancy-driven flow
Category: Process
Description
Different relative densities of fluids in a geological system will result in buoyancy-driven flows as less dense fluids will have a tendency to flow upwards. The density of fluids will depend on its temperature and pressure.

Relevance to performance and safety:
Carbon dioxide can be less dense than water, which may cause injected CO2 to flow upwards and accumulate above the water phase below the cap rock of a reservoir. Water with dissolved CO2 is more dense than water, which can result in stratification of water bodies into which CO2 may leak, if conditions are suitable.
References
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
- Bromhal G S (2001) NETL online paper.
- Knox P R, Doughty C A and Hovorka S D (2003) AAPG Annual Convention, Salt Lake City, Utah, May 11-14, 2003.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Bryant S, Lakshminarasimhan S and Pope G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Georgescu S, Lindeberg E and Holt T (2006) 8th International Conference on Greenhouse Gas Control Technologies.
3.3.3 Displacement of formation fluids
Category: Process
Description
This depends on interfacial tension and capillary pressure.
Capillary pressure is the pressure difference existing across the interface separating two immiscible fluids due to interfacial tension. The interfacial tension itself is caused by the imbalance in the molecular forces of attraction experienced by the molecules at the surface and is a function of temperature and pressure.
At a given pressure, increased interfacial tension values between water and CO2 will make larger pores accessible to CO2 (this is only valid for water-wet systems). The change from a water-wet system to a CO2-wet system has an effect on capillary forces (i.e. displacement of water by enhanced pressure versus CO2 injection with less capillary pressure) and the displacement capacity (i.e. as a non-wetting fluid, CO2 will have less displacement capacity). If the injection velocity is high, effects of capillary forces are small.
Relevance to performance and safety:
Interfacial tension and capillary pressure determine the location of CO2 within the pore spaces of the reservoir and the displacement capacity of the reservoir.
References
3.3.4 Dissolution in formation fluids
Category: Process
Description
The process of dissolution of CO2 in formation fluids. The rate of dissolution depends on factors such as the interfacial area between the CO2 and the formation fluids and temperature.

Relevance to performance and safety:
Dissolution in formation fluids can be an important process in determining the period that free CO2 remains in the reservoir.
References
3.3.5 Water mediated transport
Category: Process
Description
Processes related to the transport of CO2, and associated contaminants, in groundwater and surface water, including advection, dispersion and molecular diffusion.
Advection is the process by which CO2, and associated contaminants, are transported by the bulk movement of the water in which they are dissolved. Advective groundwater flow can occur along connected porous regions, such as fractures and faults. Processes that affect the movement of groundwater, such as fault valving, will also affect the migration of dissolved CO2, and associated contaminants.
Dispersion is the collective name for the consequences of a number of processes that cause 'spreading-out' of CO2, and associated contaminants, dissolved in water in all directions, superimposed on the bulk movement predicted by a simple advection model. It results in a spatially distributed contaminant plume. Spreading of the solute plume can occur in the direction of advection, in which case it is known as longitudinal dispersion, or it can occur perpendicular to the direction of advection, in which case it is known as transverse dispersion.
Diffusion is the process whereby chemical species move under the influence of a chemical potential gradient (usually a concentration gradient). In the storage domain, diffusion of CO2 might be significant in the cap rock and low permeability sedimentary host rock environments where advective transport does not occur or is limited, and diffusion of other chemical species may give rise to chemical regimes in parts of the system that inhibit or enhance the transport of CO2.
Relevance to performance and safety:
The transport of CO2, and associated contaminants, within groundwater is likely to be a key migration process and therefore an important consideration in determining performance and safety. At a secondary level, dispersion within surface water environments (both freshwater and marine) will influence environmental concentrations and consequently the potential for any associated impacts.
References
- Bachu S and Adams J J (2003) Energy and Conversion Management.
- Spitz K and Moreno J (1996) John Wiley and Sons Ltd.
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
- Blackford J, Jones N, Proctor R, Holt J, Widdicombe S, Lowe D and Rees A (2009) Proceedings of the Institution of Mechanical Engineers, Part A: Journal of Power and Energy.
- Shitashima K, Meada Y, Koike Y and Oshumi T (2008) International Journal of Greenhouse Gas Control.
3.3.6 CO2 release processes
Category: Process
Description
Processes by which CO2 is lost from the storage system. Once in the near-surface, changes in pressure and temperature result in the potential for phase changes and degassing, with resulting changes in the transport properties of stored CO2. Examples of CO2 release processes include:
- surface and undersea blowouts;
- CO2 geysers (such as Crystal Geyser in Utah, see picture below);
- submarine gas release (see picture below).
Natural gas seepages from hydrothermal vents provide an example of seepages in the marine environment (see picture below). Seepage of CO2 into the marine environment will reduce pH as dissolved CO2 will form bicarbonate and carbonate ions.
Relevance to performance and safety:
The potential for CO2 to be lost from a storage system will determine the performance of that system.
References
- Waltham T (2001) Geology Today.
- Baer J L and Rigby J K (1978) Utah Geology.
- Pichler T, Veizer J and Hall G E W (1999) Marine Chemistry.
- Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) (2005) IPCC Special Report.
- Shitashima K, Maeda Y, Koike Y and Ohsumi T (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Birkholzer J, Pruess K, Lewicki J, Rutqvist J, Tsang C and Karimjee A (2006) 8th International Conference on Greenhouse Gas Control Technologies.
3.3.6.1 Limnic eruption
Category: Event
Description
The rapid turnover and degassing of CO2 from a surface water body.
Due to the high solubility of CO2 in water, a lake can dissolve a volume of CO2 that, in gaseous form, is more than five times its volume. CO2 rich water is denser that pure water which can result in an unstable stratification. A drop in temperature will reduce the solubility of CO2 in water. If the water reaches its solubility limit as a result, bubbles will nucleate. As the bubbles rise and grow, a chain reaction occurs where a sudden ex-solution of CO2 can result in a rapid degassing of the water body with an eruption of rising, expanding bubbles.
Limnic eruptions can be triggered by events such as landslides that disturb the unstable stratification.
Relevance to performance and safety:
Limnic eruption provides a release mechanism for CO2, migrating from a storage system to the atmosphere.
Natural limnic eruption events can be catastrophic. On the 29th of August 1986, a massive limnic eruption from Lake Nyos in Cameroon resulted in 1800 deaths as the CO2 smothered local villages. The CO2, which is volcanic in origin, seeps through the lake bed sediments and builds up in the lower strata of the water column.

Links
3.3.7 Co-migration of other gases
Category: (None)
Description
Surface seepages of CO2 may contain significant amounts of other gases due to co-migration, such as hydrogen sulphide (H2S). This is especially the case where the CO2 reservoir is a reducing chemical environment. H2S is derived from the hydration of sulphide minerals (e.g. FeS) or from the chemical reduction of aqueous sulphate species. H2S is highly toxic and therefore potentially harmful to the biosphere. Even in low concentrations it is deleterious to long-term health (human/animal), in addition to being extremely unpleasant.
Relevance to performance and safety:
The co-migration of other gases to the surface environment may cause areas of leakage to become uninhabitable - at least temporarily.
The detection of H2S provides a quick (non-analytical/aesthetic) test for CO2 escape and thus can be used as a 'marker' gas.
4 Geosphere
Category: (None)
Description
This category of FEPs is concerned with the geology, hydrogeology and geochemistry of the geosphere. The category covers the reservoir, overburden and surrounding rock up to the near-surface which is considered in a separate FEP category.
Taken together, the FEPs in this category describe what is known about the natural system prior to storage operations commencing. The category is divided into three classes: Geology, Fluids, and Geochemistry.
4.1 Geology
Category: (None)
Description
Geological features of the geosphere, which comprises of the reservoir, overburden and surrounding rock prior to injection of CO2.
Relevance to performance and safety:
An understanding of the natural system into which the carbon dioxide is injected is essential for the assessment of long-term performance and safety.
4.1.1 Geographical location
Category: Feature
Description
The geographic location of a CO2 storage reservoir will influence the type of impacts to consider, e.g. continental or sub-marine, in the vicinity of a volcano, or tectonic activity, etc. In addition, proximity to human populations will increase importance of any release to the surface.

Relevance to performance and safety:
Proximity to natural hazards will increase their importance in being considered in the assessment. Proximity to human populations places more emphasis on the significance of near-surface releases.
References
4.1.2 Natural resources
Category: Feature
Description
Natural resources within the geosphere including solid mineralogical resources, such as coal or minerals, fluid and gaseous resources, such as hydrocarbons or water, and other resources such as geothermal or microbial resources.
Relevance to performance and safety:
The presence of natural resources may mean that future human exploitation of the system cannot be ignored in assessing long-term performance since they may increase the possibility of future human intrusion.
4.1.3 Reservoir type
Category: Feature
Description
The generic type of reservoir being considered for storage of CO2. For example:
- oil reservoir (such as the Weyburn project);
- gas reservoir (such as the Coal-Seq project);
- aquifer (such as at Sleipner); and
- coal beds (such as the Coal-Seq and RECOPOL projects).

Relevance to performance and safety:
The generic reservoir type will provide a high-level indication of the geological characteristics of the storage location. It will also contribute towards the extent and type of historical exploitation of any geological resources.
References
- Whittaker S G and Rostron B (2001) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Torp T A and Gale J (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Reeves S (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- van Bergen F, Pagnier H J M, van der Meer L G H, van den Belt F J G, Winthaegen P L A and Westerhoff R S (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Kuuskraa V and Koperna G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Mignot V, Le Gallo Y, Lecomte J, Euzen T, Vallaure T and Mallo J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Faiz M, Saghafi A, Barclay S, Stalker L, Sherwood N and Whitford D (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
4.1.4 Reservoir geometry
Category: Feature
Description
Geometry of the CO2 storage reservoir including the spatial distribution, depth and the topography of the top.

Relevance to performance and safety:
The geometry of the storage reservoir helps to determine the capacity of the geosphere.
The geometry of the top is particularly important because supercritical CO2 is buoyant and will therefore migrate to the top of a reservoir. Once at the top of the reservoir, it will migrate according to the precise topography of the top. Local 'highs' could produce small-scale traps within the overall aquifer; bigger structures would produce bigger traps.
Spill points are determined by the lowest point that can retain the stored CO2.
References
- Arts R J, Zweigel P and Lothe A E (2000) 62nd EAGE Meeting, Glasgow, Paper B-20..
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Gibson-Poole C, Svensden L, Underschultz J, Watson M, Ennis-King J, van Ruth P, Nelson E, Daniel R and Cinar Y (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Little K, Payenberg T and Lang S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
4.1.5 Reservoir exploitation
Category: Feature
Description
Degree to which geological resources (such as oil and gas) have been exploited prior to the injection of CO2.

Relevance to performance and safety:
The extent of previous exploitation will help to determine the initial state of a storage reservoir. For example:
- the existence and nature of boreholes; and
- the presence of geological resources, such as oil and gas.
Previous exploitation of the storage reservoir area will improve the amount of historical information available concerning the reservoir characteristics.
References
- Knox P, Paine J and Hovorka S (2003) Bureau of Economic Geology, The University of Texas at Austin.
- van der Meer L, Kreft E, Geel C, Hoore D and Hartmann J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Mignot V, Le Gallo Y, Lecomte J, Euzen T, Vallaure T and Mallo J (2006) 8th International Conference on Greenhouse Gas Control Technologies.
4.1.6 Cap rock or sealing formation
Category: Feature
Description
The nature of the relatively impermeable layer of rock overlying the storage reservoir that forms a barrier to the upward migration of buoyant fluids, such as stored CO2.

Relevance to performance and safety:
The cap rock or sealing formation plays a key roll in preventing the stored CO2 from migrating to the surface environment.
References
- Nakayama K and Sato D (2002) Hydrocarbon Seal Quantification, Koestler and Hunsdale (eds).
- Lewis H, Oldsen P and Couples G D (2002) Hydrocarbon Seal Quantification, Koestler and Hunsdale (eds).
- Friedmann S J and Nummedal D (2003) National Energy Technology Laboratory, US Department of Energy.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Springer N, Lindgren H (2006) 8th International Conference on Greenhouse Gas Control Technologies.
4.1.7 Additional seals
Category: Feature
Description
This concerns the concept of successive lithological, hydraulic and/or chemical barriers acting successively to prevent fluid escape to surface environments. From a geological point of view the permeability barrier is probably the most important, in comparison with other types of traps. However, it may be necessary to consider a sequence of traps in CO2 migration models in addition to the conventional low permeability barriers.
For example, within the Weyburn storage project, the primary cap rock is the Watrous formation, however, low permeability formations at higher stratigraphical layers provide potential additional seals, preventing upward migration of stored CO2.
Relevance to performance and safety:
Features with the potential to retard or prevent CO2 migration in the geosphere are important considerations when determining the performance of a storage project.
References
4.1.8 Lithology
Category: Feature
Description
The systematic description of rocks in terms of their mineral assemblage and texture.
The lithology of the geosphere (including both the reservoir and the caprock) determines the reservoir physical and transport properties (including porosity and permeability). It concerns the mineralogical composition, texture (grain size, sorting) and fabric (sedimentary structures, vertical and horizontal heterogeneities). Potential reservoir lithologies include sandstones and limestones.
Relevance to performance and safety:
The physical and chemical and mineralogical properties of the reservoir rocks affect: the capacity to store CO2; fluid flow and CO2 migration; determine which water-rock reactions can take place; and influence the rock strength and elastic properties (such as compressibility, shear strength, Poisson's ratio etc).
References
4.1.8.1 Lithification/diagenesis
Category: Feature
Description
The slow physical, chemical and/or biological processes by which unconsolidated sediments become sedimentary rock. These processes can result in changes to the original mineralogy.
Relevance to performance and safety:
The state of lithification/diagenesis contributes to determining the physical and chemical characteristics of sedimentary rock. For example, porosity usually decreases during diagenesis, except in rare cases such as dissolution of minerals and dolomitisation.
Links
4.1.8.2 Pore architecture
Category: Feature
Description
Structure and density of discrete voids within the rock (pores).

Relevance to performance and safety:
The pore architecture determines the porosity and permeability of the rock, which are key features when considering the mobility of fluids and gases within the rock.
References
4.1.9 Unconformities
Category: Feature
Description
Geological surfaces separating older from younger rocks and representing a gap in the geologic record. Such a surface might result from a hiatus in deposition of sediments, possibly in combination with erosion, or deformation such as faulting. An angular unconformity separates younger strata from eroded, dipping older strata. A disconformity represents a time of nondeposition, possibly combined with erosion, and can be difficult to distinguish within a series of parallel strata. A nonconformity separates overlying strata from eroded, older igneous or metamorphic rocks.
Relevance to performance and safety:
Unconformities can act both as potential seals or lateral migration pathways for fluids. For example, the impermeable barrier resulting from the widespread development of diagenic anhydritised carbonate associated with the unconformity between the Mississipian beds and overlying Triassic Watrous Formation in the vicinity of the Weyburn pool.
References
Links
4.1.10 Heterogeneities
Category: Feature
Description
Heterogeneities are variations in the rock properties of a geological formation.
Relevance to performance and safety:
Heterogeneities can result in directional variations in permeability, which affects the mobility of fluids and gases in the rock. For example, experience from the Saline Aquifer CO2 Storage project (SACS) has shown that both stratigraphical and structural local permeability heterogeneities have the potential to profoundly affect CO2 distribution and migration (Chadwick et al., 2003).
The image below shows seismic sections through the Sleipner injection site from Zweigel et al. (2001). The strong amplitudes are taken to be CO2 accumulations.
References
- Chadwick R A, Zweigel P, Gregersen U, Kirby G A, Holloway S and Johannessen P N (2002) Presentation from the 6th Greenhouse Gas Control Technologies Conference, Kyoto.
- Zweigel P, Arts R, Bidstrup T, Chadwick A, Eiken O, Gregersen U, Homborg M, Johanessen P, Kirby G, Kristensen L and Lindberg E (2001) Extended abstract from the Annual Meeting of the American Association of Petroleum Geologists (AAPG), June 2001, Denver, Colorado.
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
- Gibson-Poole C, SvendsenL, Ennis-King J, Watson M, Daniel R and Rigg A (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
Links
4.1.11 Fractures and faults
Category: Feature
Description
Fractures are cracks or breaks in rock. Fractures along which displacement has occurred are called faults. Fractures and faults can occur over a wide range of scales.
Relevance to performance and safety:
Fractures can enhance conductivity, for example, by a conductive fracture connecting permeable regions together. They can also act as seals, by bringing a relatively permeable region into contact with low conductivity rock, for example.
References
- Friedmann S J and Nummedal D (2003) National Energy Technology Laboratory, US Department of Energy.
- Sperrevik S, Gillespie P A, Fisher Q J, Halvorsen T and Knipe R J (2002) Hydrocarbon Seal Quantification, Koestler and Hunsdale (eds).
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Little K, Payenberg T and Lang S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
4.1.12 Undetected features
Category: Feature
Description
Natural or man-made features within the geological environment that may not be detected during site investigations.
Examples of possible undetected features are fracture/fault zones, the presence of brines or old mine workings. Some physical features of the storage environment may remain undetected during site surveys and even during preliminary borehole drilling. The nature of the geological environment will indicate the likelihood that certain types of undetected features may be present and the site investigation may be able to place bounds on the maximum size or minimum proximity to such features.
Relevance to performance and safety:
Undetected features could significantly affect the performance of a storage system. For example, local permeability hererogeneities with the potential to profoundly affect the distribution and migration of CO2 at Sleipner (within the Saline Aquifer CO2 Storage project, SACS) were only discovered after effectively being 'illuminated' by the stored CO2 (Chadwick et al., 2003).
References
Links
4.1.13 Vertical geothermal gradient
Category: Feature
Description
Temperature profile in the geosphere prior to the injection of CO2.
The critical temperature for CO2 is 31.1 degrees centigrade. The average geothermal gradient is approximately 2.4 degrees centigrade per kilometre. If the surface temperature is 10 degrees centigrade, the critical temperature will be reached at a depth of 840 metres. However, a considerable variation in geothermal gradients and sub-surface temperatures can be expected at a depth of 1000 metres. For example, in Europe temperatures at 1000 m range from 20 to 75 degrees centigrade, with local temperatures of more than 200 degrees centigrade in volcanic areas.
Relevance to performance and safety:
Relevant to temperature dependent physical/chemical/biological/hydraulic processes, such as CO2 phase behaviour.
References
4.1.14 Formation pressure
Category: Feature
Description
The pressure of fluids within the pores of a formation, normally hydrostatic pressure, or the pressure exerted by a column of water from the formations depth to the sea level prior to the injection of CO2.
The critical pressure of CO2 is 7.38 mega-Pascals. The average underground hydrostatic pressure increases with depth by approximately 10.5 mega-Pascals per kilometre for aquifers that are in open communication with surface water. Applying this average gradient, the critical pressure of CO2 will be reached at a depth of around 690 metres. However, aquifers or hydrocarbon reservoirs that are sealed off from the rest of the sub-surface may be under- or overpressured.
Relevance to performance and safety:
Contributes towards determining the mobility of stored CO2.
References
Links
4.1.15 Stress and mechanical properties
Category: Feature
Description
The stress condition and mechanical properties of the geosphere prior to injection of CO2.
Relevance to performance and safety:
The initial stress state and mechanical properties are a baseline from which the potential effect of injecting CO2 can be assessed.
References
- Nordgard Bolis H M and Ilermanrud I (2002) Hydrocarbon Seal Quantification, Koestler and Hunsdale (eds).
- Streit J E and Hillis R R (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Lucier A, Zoback M, Gupta N and Ramakrishnan T (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Hawkes C and Bachu S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
4.1.16 Petrophysical properties
Category: Feature
Description
Petrophysical properties of the geosphere prior to the injection of CO2. This includes features such as permeability, porosity, residual saturation, capillary pressure and wettability.
Relevance to performance and safety:
Petrophysical properties influence how injected CO2 will migrate in the geosphere. For example, permeability influences the direction and rate of CO2 movement, and porosity and residual saturation influence the dimensions of the CO2 plume.
References
Links
4.2 Fluids
Category: (None)
Description
Details of fluids in the geosphere, which comprises of the reservoir, overburden and surrounding rock prior to the injection of CO2. Water will generally be present, but other fluids, particularly hydrocarbons, may be important, dependent on the storage concept.
Relevance to performance and safety:
Water and other fluids in the storage system will affect the transport and interactions of injected carbon dioxide.
4.2.1 Fluid properties
Category: Feature
Description
Properties of the geosphere fluids prior to injection of CO2, including composition and geochemistry.
Relevance to performance and safety:
The fluid properties and geochemistry of the geosphere will contribute towards determining how injected CO2 will behave in the geosphere.
4.2.2 Hydrogeology
Category: Feature
Description
Natural formation water flow pathways (directions, velocities) in the geosphere will be important in determining the long-term migration paths for CO2. This depends on factors including: hydraulic heads, permeability and porosity distribution, the existence of fracture networks, connection between aquifers, position of the recharge and discharge areas.

Relevance to performance and safety:
This will affect the migration of dissolved CO2 in the reservoir and the geosphere (direction, timing), the position of the interface between supercritical CO2 and aquifer water (inclined interface). There may also be a possible effect on overlying aquifers used for drinking water.
References
4.2.3 Hydrocarbons
Category: Feature
Description
The presence and distribution of hydrocarbons, such as oil and/or gas, within the storage system.

Relevance to performance and safety:
Hydrocarbons have potentially important implications for a storage system, by both influencing the likelihood of previous geological exploitation of the area, and by being an important component of the system with which stored CO2 can interact.
5 Boreholes
Category: (None)
Description
This category of FEPs is concerned with the way that activity by humans alters the natural system. Both boreholes used in the storage operations and those drilled for other purposes are relevant to the long-term performance of the system. The category is divided into two classes for the drilling process, and sealing and abandonment.
5.1 Drilling and completion
Category: (None)
Description
FEPs relevant to the operation of boreholes drilled within the system domain.
Relevance to performance and safety:
Boreholes can potentially provide 'short circuits' for carbon dioxide transport.
5.1.1 Formation damage
Category: Feature
Description
Alteration of the far-field or virgin characteristics of a formation, usually by exposure to drilling fluids. Fracturing associated with formation damage can increase porosity, whereas the water or solid particles in the drilling fluids, or both, can decrease the pore volume and effective permeability of the formation in the near-wellbore region.
A number of mechanisms can result in a decrease in porosity, including:
- solid particles from the drilling fluid physically plug or bridge across flowpaths in the porous formation;
- when water contacts certain clay minerals in the formation, the clay typically swells, increasing in volume and decreasing the pore volume; and
- chemical reactions between the drilling fluid and the formation rock and fluids can precipitate solids or semisolids that plug pore spaces.
Relevance to performance and safety:
Formation damage has a number of potential implications for assessing CO2 storage:
- it can make information from affected boreholes non-representative of the true characteristics of the damaged formations; and
- damaged regions themselves may provide flowpaths for CO2 migration, particularly if damage results in fracturing.
Links
5.1.2 Well lining and completion
Category: Feature, Process
Description
At the time of drilling, boreholes are lined with a metal casing. Cement is pumped downhole inside the casing string, and it is pushed upward under and outside the casing lower end, between the casing and the rock wall. In multi-stage cement jobs, cement is squeezed between the casing and the rock wall though purpose made perforations. The cement could be pushed behind casing from the bottom hole to the surface, or to a predetermined depth. In such a case, the height of cement outside the casing is checked with the Cement Bound Log (CBL).
Curing of cement is the process of maintaining the proper temperature and moisture conditions to promote optimum cement hydration immediately after placement. Proper moisture conditions are critical because water is necessary for the hydration of cementitious materials. As cement hydrates, strength increases and permeability decreases. When hydration stops, strength gain ceases. Therefore, proper hydration of the cement is important in the fabrication of strong, durable concrete. The degree of curing of cement used in boreholes determines their properties, including strength, permeability and durability.
Alteration of borehole linings (metal and cement/concrete) will occur with time, depending on the natural fluid composition of the deep reservoir and the input of high concentrations of CO2 carrying natural H2S, which may accelerate corrosion.
Relevance to performance and safety:
Borehole lining and completion will contribute to determining the performance of a borehole both during its operational and post-closure phases. This is important from the perspective of CO2 storage, since boreholes may provide preferential short circuits to the surface with potential release of CO2 and contamination of upper aquifers.
References
- Whiting N M and Snyder M B (2003) Transportation Research Record: Journal of the Transportation Research Board.
- Stevens S H, Fox C, White T, Melzer S, and Byrer C (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Chalaturnyk R, Zambrano G, Soderberg H, Lang P, Lawton D and Wichert G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Barlet-Gouédard V, Rimmelé G and Goffé B (2006) 8th International Conference on Greenhouse Gas Control Technologies.
5.1.3 Workover
Category: Feature
Description
The process of performing major maintenance or remedial treatments on a borehole often associated with the re-use of existing boreholes. Workover techniques include flushing of the formation and the removal and replacement of the borehole lining.
Relevance to performance and safety:
Workover will result in modified borehole properties that may need consideration within an assessment.
References
Links
5.1.4 Monitoring wells
Category: Feature
Description
Often, monitoring wells are needed to monitor the physical conditions (pressure, temperature, etc.) of the storage reservoir, both inside and/or outside the area immediately affected by the storage operations, or above the storage reservoir.
Monitoring wells could be 'adopted', by using existing wells to host the appropriate instrumentation (piezometers, pressure gauges, thermometers, etc.), or they could be purpose drilled anew.

Relevance to performance and safety:
Observation or monitoring wells may provide an accidental leakage route for the stored CO2, particularly wells drilled inside the area of storage.
References
- Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P (2006) EC.
- Pearce J, Chadwick A, Kirby G, Holloway S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Bachu S and Watson T (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Chalaturnyk R, Zambrano G, Soderberg H, Lang P, Lawton D and Wichert G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
5.1.5 Well records
Category: Feature
Description
The drilling of boreholes (wells) for site investigation, resource exploitation and/or CO2 injection will result in many documents being generated in paper or digital form. Typical well records include location co-ordinates, depth, electric logs, mud logs, drilling parameter logs, composite log, testing reports (if applicable), coring report (if applicable), and a final report. Physical records from cutting samples, cores and fluid samples will also be documented.
The principal tool to gain knowledge about the sequence of drilled rock formations is Borehole Logging. This is achieved by lowering an electro-mechanical tool to the bottom of the hole at the end of a steel rope (with connecting electrical cables) and by measuring petrophysical parameters on the way up. Common measures include hole diameter, natural gamma ray response, spontaneous electrical potential, rock resistivity, velocity of acoustic waves through rock, neutron susceptibility, etc. Borehole logging can be extended to include focussed fluid testing over short intervals or at specific points along the borehole.
The documents originating at the time of drilling are often the most accurate records of the succession of events associated with the drilling of the well and represent (particularly after years and decades) a precious source of information. The curation of such unique records is an invaluable tool to pass knowledge to future generations.
Relevance to performance and safety:
Well records provide a key source of baseline information regarding the storage site. They provide information concerning the nature of the rocks drilled by the well and their petrophysical characteristics in terms of sealing potential and reservoir potential. Additionally, records from wells drilled over a period of time can give a picture of how the system is evolving either naturally, or as a result of the exploitation of geological resources. This baseline information is an important input both into the initial conditions relevant to the system to be assessed, as well as providing an indication of the likely importance of other FEPs.
Incomplete well records equate to a potential gap in understanding of the storage system and may result in potentially important features being overlooked in the assessment process.
References
5.2 Borehole seals and abandonment
Category: (None)
Description
FEPs relevant to the closure of boreholes drilled within the system domain.
Relevance to performance and safety:
The way that boreholes are closed and sealed is directly relevant to the likelihood that they could act as 'short circuits' for carbon dioxide transport.
5.2.1 Closure and sealing of boreholes
Category: Feature
Description
Features related to the cessation of CO2 injection operations at a site and the sealing of injection and monitoring wells.
When a borehole is drilled to the potential storage reservoir, it creates communication with possible overlying reservoirs and with the surface. Cementing and abandonment procedures are designed to permanently plug such communication channel. At the time of well abandonment, cement plugs tens to hundreds of metres thick are placed at intervals inside the well casing.
The cement plugs are commonly located across potential problem spots (e.g. perforations, casing shoes, top of liner, etc.), to minimise leaking risks. Particular attention should be paid to the quality of the original cement job behind the casing string. If uncemented space is detected, known or suspected behind casing, depending on the lithology across such interval, it may be important to squeeze extra cement between the rock face and the casing to complement the final abandonment plugs inside the casing.
Individual boreholes may be closed in sequence, but closure refers to final closure of the whole system, and may include removal of surface installations. The schedule and procedure for sealing and closure may need to be considered in the assessment.

Relevance to performance and safety:
The intention of borehole sealing is to prevent human access to the stored CO2 and to prevent the borehole from providing a migration pathway for the CO2. Correct cementing and abandonment operations are essential to achieve restoration of pristine sealing above the designed storage reservoir formation.
References
- Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) (2005) IPCC Special Report.
- Ide S, Friedmann S and Herzog H (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Barlet-Gouédard V, Rimmelé G and Goffé B (2006) 8th International Conference on Greenhouse Gas Control Technologies.
5.2.2 Seal failure
Category: Process
Description
Degradation of borehole linings (metal and cement) will occur with time, depending on the natural fluid composition of the deep reservoir and the input of high concentrations of CO2. Any H2S present may accelerate corrosion of metal linings. Cement will be attacked by high partial pressures of CO2, low pH and appreciable concentrations of sulphate, chloride, and magnesium ions in the formation fluids. Seal failure will occur once liners have degraded and corroded.

Relevance to performance and safety:
Seal failure may provide preferential short circuits to the surface with potential release of CO2 and associated contaminants to the surface or near-surface environment. The failure may provide a preferential pathway either through the borehole annulus or around the outside of the casing.
References
- Rochelle C A, Czernichowski-Lauriol I and Milodowski A E (2004) Geological Society, London, Special Publications.
- Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) (2005) IPCC Special Report.
- Barlet-Gouédard V, Rimmelé G and Goffé B (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Bachu S and Watson T (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Carey J, Wigand M, Chipera S, WoldeGabrial G, Pawar R, Lichtner P, Wehner S, Raines M, Guthrie G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Duguid A, Radonjic M and Scherer G (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Jacquemet N, Pironon J, Lagneau V, Fraboulet B and Brossolet P (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Ide S, Friedmann S and Herzog H (2006) 8th International Conference on Greenhouse Gas Control Technologies.
5.2.3 Blowouts
Category: Process
Description
Uncontrolled flow from depth leading to gas and/or fluid erupting from a well or borehole to either the terrestrial or marine environments.
Relevance to performance and safety:
A surface or undersea blowout would provide a rapid pathway for CO2 to reach the surface.
References
Links
5.2.4 Orphan wells
Category: Feature
Description
CO2 storage projects may be part of an Enhanced Oil Recovery (EOR) project or stand-alone deep saline aquifer projects. Either way, it is likely that the target geological structure has been the object of past exploration efforts, possibly involving drilling wells.
The existence of old wells could be obvious if the wells are still active, but could be overlooked if the old (orphan) wells have been long cemented and abandoned. Technical details of such abandoned vintage wells may in fact not be readily available, or altogether lost. In such a case, the old cementing (sealing) job could be substandard.

Relevance to performance and safety:
Old substandard plugged well could provide a potential CO2 leakage route to the surface or to possible reservoirs above the designed CO2 storage reservoir.
There is little chance of detecting a substandard well abandonment before the beginning of CO2 injection to the designed reservoir, particularly if the existence of an old well has been overlooked. If old abandoned wells are known in the area of the CO2 injection operations, the risk is minimised by carefully check any potential CO2 leak to the surface at the old well head location.
If old wells are unknown and not suspected, it is good practice to run a baseline soil gas survey (if applicable) and successive soil gas surveys at intervals after the beginning of CO2 injection.
References
5.2.5 Soil creep around boreholes
Category: Process
Description
The slow downward gravitational movement of soil around boreholes.
Relevance to performance and safety:
This process results in changing properties of the soil around borehole casings after abandonment. It may either increase or decrease the degree of sealing and therefore the potential for the region immediately around the borehole to act as a migration pathway for CO2 and/or associated contaminants.
6 Near-Surface Environment
Category: (None)
Description
This category of FEPs is concerned with factors that can be important if stored carbon dioxide returns to the accessible environment. The environment could be terrestrial or marine, and human behaviour in that environment needs to be described. The category is divided into three classes: Terrestrial Environment; Marine Environment; and Human Behaviour.
6.1 Terrestrial environment
Category: (None)
Description
This class of FEPs is concerned with factors that can be important if stored carbon dioxide returns to the accessible terrestrial environment.
Relevance to performance and safety:
The near-surface environment is where most potential impacts would be incurred. The FEPs in this class are relevant if that environment is terrestrial.
6.1.1 Topography and morphology
Category: Feature
Description
Features related to the relief and shape of the surface environment and its evolution.
Relevance to performance and safety:
This FEP refers to local land form and land form changes with implications for the surface environment, e.g. plains, hills, valleys, and effects of river and glacial erosion thereon. In the long term, such changes may occur as a response to other geological changes.
6.1.2 Soils and sediments
Category: Feature
Description
Features related to the characteristics of the soils and sediments and their evolution.
Different soil and sediment types, e.g. characterised by mineralogy, particle-size distribution and organic content, will have different properties with respect to erosion/deposition, sorption etc.

Relevance to performance and safety:
Soil and sediment characteristics will influence the type of vegetation and land use. They will also determine relevant processes to consider should CO2 and/or associated contaminants migrate to the terrestrial surface environment.
Links
6.1.3 Erosion and deposition
Category: Process
Description
FEPs related to all the erosional and depositional processes that operate in the surface environment, and their evolution with time. Relevant processes may include fluvial and glacial erosion and deposition, denudation, aeolian erosion and deposition. These processes will be controlled by factors such as the climate, vegetation, topography and geomorphology.
The picture below illustrates the relationship between fluvial stream flow velocity and particle erosion, transport, and deposition.

Relevance to performance and safety:
Erosional and depositional processes will influence the way in which the surface environment has evolved and will evolve over the time-scale of interest.
Links
6.1.4 Atmosphere and meteorology
Category: Feature, Event, Process
Description
FEPs related to the characteristics of the atmosphere, weather and climate, and their evolution with time. In case of CO2 leakage to the surface, the weather is a relevant factor determining the dispersion or the displacement of the gas: currents, evolution of the concentration of the gas, gas accumulations.
Atmospheric characteristics include physical transport of gas, aerosols and dust in the atmosphere and chemical and photochemical reactions.
Meteorology is characterised by atmospheric precipitation, temperature, pressure, wind speed and direction. The variability in meteorology should be included so that extremes such as drought, flooding, storms and snow melt are identified.

Relevance to performance and safety:
This information will determine the behaviour of CO2 should it reach the atmosphere and is therefore an important factor when considering exposure of the local population and of the local environment.
Meteorological characteristics also influence the near-surface hydrological regime with its subsequent consequences for CO2 migration.
6.1.5 Hydrological regime and water balance
Category: Process
Description
Processes related to near-surface hydrology at a catchment scale and also soil water balance, and their evolution with time.
The hydrological regime is a description of the movement of water through the surface and near-surface environment. It includes the movement of materials associated with the water such as gas or particulates and extremes such as drought, flooding, storms and snow melt.

Relevance to performance and safety:
The hydrological regime and water balance will influence the way in which CO2 migrates should it reach the near-surface environment.
References
6.1.6 Near-surface aquifers and surface water bodies
Category: Feature
Description
Features related to the characteristics of aquifers and water-bearing features and their evolution.

Relevance to performance and safety:
Shallow Aquifers
Aquifers may yield significant amounts of water to wells or surface springs and may thus be a flowpath for CO2 to the surface environment. The presence of aquifers and other water-bearing features will be determined by the geological, hydrological and climatic factors.
Shallow aquifers will be able to dissolve CO2, reducing further upward migration. The amount of CO2 that can dissolve will depend on factors such as the location of the water table, the chemical composition of pore waters, CO2 flux rates, and hydrogeology. The water table location is important in determining the water-body thickness available to interact with any CO2 rising from depth. The lowering of shallow aquifer piezometric levels reduces the thickness of shallow CO2-buffering water-bodies. The consequence is a reduced capacity to buffer CO2 migrating from depth.
Surface Water Bodies
Streams, rivers and lakes often act as boundaries of hydrogeological systems. They may represent a significant source of dilution for CO2 and contaminants entering these systems, or act as reservoirs. In hot dry environments, where evaporation dominates, concentration or exsolution of gas is possible. Water with dissolved CO2 is denser than pure water, which can result in stratification and the potential for limnic eruption.
References
6.1.7 Terrestrial flora and fauna
Category: Feature, Process
Description
Features and processes related to the characteristics of terrestrial and freshwater flora and fauna, and their evolution. Includes plants, animals, fungi, algae and microbes.

Relevance to performance and safety:
Flora and fauna may be affected by concentrations of CO2 in the near-surface environment and may be indicators of CO2 leakage.
6.1.8 Terrestrial ecological systems
Category: Feature, Process
Description
Features and processes related to interactions between terrestrial and freshwater populations of animals, plants, algae, fungi, microbes and their evolution.
Characteristics of the ecological system include the vegetation regime, and natural cycles such as forest fires or flash floods that influence the development of the ecology. The plant, animal, algal, fungal and microbial populations occupying the surface environment are an intrinsic component of its ecology. Their behaviour and population dynamics are regulated by the wide range of processes that define the ecological system. Human activities have significantly altered the natural ecology of most environments.
Relevance to performance and safety:
The ecology of the terrestrial near-surface environment determines the types of organisms present and their inter-dependencies. These can influence the types of impact of interest and can provide a mechanism for monitoring CO2 leakage.
References
6.2 Marine environment
Category: (None)
Description
This class of FEPs is concerned with factors that can be important if stored carbon dioxide returns to the accessible marine environment.
Relevance to performance and safety:
The near-surface environment is where most potential impacts would be incurred. The FEPs in this class are relevant if that environment is marine.
6.2.1 Coastal features
Category: Feature, Process
Description
Features and processes related to the characteristics of coasts and the near shore, and their evolution. Coastal features include headlands, bays, beaches, spits, cliffs and estuaries.

Relevance to performance and safety:
The processes operating on these features, e.g. active erosion, deposition, longshore transport, may affect mechanisms for the migration of CO2, and associated contaminants, entering the surface environment.
Links
6.2.2 Local oceanography
Category: Feature, Process
Description
Features and processes related to the characteristics of seas and oceans and their evolution. This includes the topography and morphology of the seabed; thermal stratification and salinity gradients; and marine currents. Ocean biogeochemistry (the interactions of biology, chemistry and geology in the ocean), in particular the cycling of materials and nutrients through the different parts of the system, is also included.
Relevance to performance and safety:
The local oceanographic features and processes determine the potential for dilution or accumulation of CO2, or associated contaminants in the marine environment.
Any influx of CO2 to the marine environment, whether from the sea bed or sea surface, has the potential to modify the ocean carbon and other nutrient cycles. Increased concentrations of CO2 in the deeper marine environment may lead to similar effects on biogeochemistry as have been observed as a result of sea surface acidification.
References
- Hovland M and Judd A G (1988) Graham and Trotman, London.
- Manabe S and Stouffer R J (1993) Nature.
- Tomczak M and Godfrey J S (1994) Daya Publishing House, Dehli.
- Royal Society (2005) Royal Society Publishing.
Links
6.2.3 Marine sediments
Category: Feature, Process
Description
Features and processes associated with sediments in the present marine environment. This includes both the physical and chemical characteristics of the sediments, along with sedimentation and resuspension processes.
Relevance to performance and safety:
Marine bed sediment characteristics will influence the ecology of the marine environment. They will also influence relevant processes to consider should CO2 and/or associated contaminants migrate to the marine environment.
References
6.2.4 Marine flora and fauna
Category: Feature, Process
Description
Features and processes related to the characteristics of marine flora and fauna, and their evolution. Includes plants, animals, fungi, algae and microbes.

Relevance to performance and safety:
Flora and fauna may be affected by concentrations of CO2 in the marine environment and may be indicators of CO2 leakage. Description of the marine flora and fauna therefore provides a baseline against which assessments can be made.
References
- Kita J and Watanabe Y (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Munday P L, Dixson D L, Donelson J M, Jones G P, Pratchett M S, Devitsina G V and Døving K B (2009) PNAS.
- Ishida H, Watanabe Y, Fukuhara T, Kaneko S, Furusawa K, and Shirayama Y (2005) Journal of Oceanography.
6.2.5 Marine ecological systems
Category: Feature, Process
Description
Features and processes related to interactions between populations of algae, animals, microbes and their evolution.
The algal, animal and microbial populations occupying the marine environment are an intrinsic component of its ecology. Their behaviour and population dynamics are regulated by the wide range of processes that define the ecological system.

Relevance to performance and safety:
The ecology of the marine environment determines the types of organisms present and their inter-dependencies. These can influence the types of impact of interest (e.g. nutrient fertilisation) and can provide a mechanism for monitoring CO2 leakage.
References
- Casareto B, Suzuki Y, Niraula M, Magi M and Yamada K (2006) 8th International Conference on Greenhouse Gas Control Technologies.
- Ishida H, Watanabe Y, Fukuhara T, Kaneko S, Furusawa K, and Shirayama Y (2005) Journal of Oceanography.
- Casareto B, Magi M, Kurosawa K, Niraula M, Takagi N and Suzuki Y (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
6.3 Human behaviour
Category: (None)
Description
Details of the human behaviour in the near-surface environment where impacts may be incurred.
Relevance to performance and safety:
Human behaviour will affect the nature and magnitude of potential impacts to human beings.
6.3.1 Human characteristics
Category: Feature, Process
Description
Features and processes related to characteristics, e.g. physiology, metabolism, of individual humans. This includes considerations of variability, in individual humans, of physiology and metabolism due to age and other variations.
Physiology refers to body and organ form and function. Metabolism refers to the chemical and biochemical reactions which occur within an organism, or part of an organism, in connection with the production and use of energy.
Children and infants, although similar to adults, often have characteristic differences, e.g. metabolism and respiratory rates, which may lead to different characteristics of exposure to CO2 or contaminants.
Relevance to performance and safety:
Human physiology and metabolism determine the affect of exposure to CO2 and associated contaminants.
6.3.2 Diet and food processing
Category: Feature, Process
Description
Features related to intake of food and water by individual humans and the compositions and origin of intake. This includes considerations of how diets, of individual humans, may vary with age and other variations (ingestion of soil by infants, for example).
This FEP also includes processes related to the treatment of foodstuffs and water between origin and consumption. For example, once a crop is harvested it may be subject to a variety of storage, processing and preparational activities prior to human or livestock consumption. Water sources may be treated prior to human or livestock consumption, e.g. chemical treatment and/or filtration.
Relevance to performance and safety:
The human diet provides a potentially important exposure pathway to contaminants released into the foodchain as a result of the CO2 storage system.
Food preparation processes may change the distribution and content of CO2 and/or associated contaminants in the product.
6.3.3 Lifestyles
Category: Feature
Description
Features related to non-diet related behaviour of individual humans, including time spent in various environments, pursuit of activities and uses of materials. This includes consideration of variability of the habits of individuals due to age and other factors.
The human habits refer to the time spent in different environments in pursuit of different activities and other uses of materials. The diet and habits will be influenced by agricultural practices and human factors such as culture, religion, economics and technology.
Relevance to performance and safety:
Human habits will determine the exposure pathways of interest in an assessment. Smoking, ploughing, fishing, and swimming are examples of behaviour that might give rise to particular modes of exposure to CO2 and/or contaminants mobilised as a result of the CO2 storage system.
6.3.4 Land and water use
Category: Feature, Event, Process
Description
FEPs related to land and water use by humans in the near-surface environment and the resulting implications for CO2 leakage and contaminant transport and exposure pathways. This includes consideration of:
- the use of natural or semi-natural tracts of land and water such as forest, brush, rivers, lakes and the sea;
- rural and agricultural land and water use (including freshwater and marine fisheries);
- urban and industrial land and water use related to developments, including transport, and their effects on hydrology; and
- leisure and other uses of environment.
Relevance to performance and safety:
These FEPs can influence the potential transport and exposure pathways for CO2 and its associated contaminants as well as the potential evolution of the system during the timescales of interest. Particular considerations are relevant for each type of land use addressed, for example:
- special foodstuffs and resources may be gathered from natural land and water which may lead to significant modes of exposure to CO2 or contaminants;
- an important set of processes are those related to agricultural practices, their effects on land form, hydrology and natural ecology, and also their impact in determining contaminant uptake through food chains and other exposure paths;
- human populations are concentrated in urban areas in modern societies. Significant areas of land may be devoted to industrial activities. Water resources may be diverted over considerable distances to serve urban and/or industrial requirements;
- significant areas of land, water, and coastal areas may be devoted to leisure activities. e.g. water bodies for recreational uses, mountains/wilderness areas for hiking and camping activities.
6.3.5 Community characteristics
Category: Feature
Description
Features related to characteristics, behaviour and lifestyle of groups of humans that might be considered as target groups in an assessment.
Relevant characteristics might be the size of a group and degree of self-sufficiency in food stuffs/diet. Associated with this is a consideration of the amount of resources required to meet the needs of the community.
Relevance to performance and safety:
This FEP involves a consideration of aggregated human behaviour in order to consider their dependency on and interactions with their environment. It therefore provides input to a consideration of potential human interference with the CO2 storage system as well as input to considering potential exposure pathways.
6.3.6 Buildings
Category: Feature
Description
Features related to houses, or other structures or shelters, in which humans spend time.
Relevance to performance and safety:
The structure or materials used in building construction be significant factors for determining potential exposure pathways to CO2 or contaminants. For example, given that CO2 is denser than air, it may accumulate in the basements/cellars of dwellings.
Links
7 Impacts
Category: (None)
Description
This category of FEPs is concerned with any endpoint that could be of interest in an assessment of performance and safety. The classes of impact considered are: Impacts to Humans; Impacts to Flora and Fauna; and Impacts to the Physical Environment. Note that:
- financial impacts are assumed to be implicitly considered within each of the impact FEPs; and
- unless stated, the FEPs refer to both CO2 and mobilised contaminants (minerals, heavy metals, hydrocarbons, gases).
7.1 System performance
Category: (None)
Description
Performance of the storage system from the perspective of its success at preventing stored CO2 from reaching the atmosphere.
Relevance to performance and safety:
The fate of stored CO2 is a fundamental endpoint for an assessment.
7.1.1 Loss of containment
Category: Process
Description
Loss of stored CO2 from the intended storage reservoir. Loss includes both consideration of loss to other parts of the geosphere and to the near-surface and surface environments, such as loss to marine water and surface water bodies, where CO2 may result in stratification or pooling.
Relevance to performance and safety:
Loss of containment may be an endpoint of interest to the assessment. For example, the assessment context may dictate that near-surface or surface processes are outside the scope of the assessment.
7.2 Impacts on the physical environment
Category: (None)
Description
FEPs relevant to adverse impacts on the physical environment. Note that these may be endpoints of interest in themselves, but may also cause other impacts of interest.
Relevance to performance and safety:
Adverse impacts on the environment can be postulated as a result of storage operations, even if there are no associated impacts to humans or on flora and fauna.
7.2.1 Contamination of groundwater
Category: Process
Description
The existence of water aquifers may be important if they are subject to CO2-induced chemical changes or CO2-induced saline intrusion. The migration of CO2 into an aquifer will result in the acidification of the water. Depending on the mineralogical composition of the aquifer and the chemical composition of the water, chemical reactions may occur which release heavy metals from the solid phase. The mechanisms which may cause this release include dissolution of metal oxides or oxyhydroxides, the reaction/diagenesis of clay minerals, and the desorption of metals that are adsorbed on clay surfaces or organic complexes.
Relevance to performance and safety:
Contamination of groundwater resources may result in impacts on flora, fauna and/or humans if the water is abstracted or flows to the surface environment. These potential impacts are considered in the subsequent FEP classes, however, contamination of groundwater may be an endpoint of interest in itself.
References
7.2.2 Impacts on soils and sediments
Category: Process
Description
Soils and sediments may have elevated concentrations of CO2, should it leak from the storage system, and/or other contaminants, such as heavy metals, hydrocarbons or even increased salinity resulting from CO2 storage.
For example, natural CO2 leaking from a trapped reservoir near Mammoth Mountain, in California, has resulted in soil gas concentrations of 20 to 90%.
Relevance to performance and safety:
Increased CO2 concentrations and/or contamination of soils and sediments with associated substances may be sufficient to modify the ecology and/or use of the impacted area by humans.
References
Links
7.2.3 Release to the atmosphere
Category: Process
Description
Release of CO2 to the atmosphere from the storage system or other contaminants, such as radon or methane, mobilised as a result of the storage.
Relevance to performance and safety:
Release of stored CO2 or mobilised methane to the atmosphere will reduce the effectiveness of the storage system at preventing greenhouse gases from being emitted to the atmosphere.
Atmospheric contamination could also lead to health impacts on humans and wildlife.
References
Links
7.2.4 Impacts on exploitation of natural resources
Category: Process
Description
The impact of CO2 storage on the exploitation of natural resources such as oil and gas.
Enhanced oil recovery (EOR) and enhanced coal bed methane (ECBM) recovery projects involving the injection of CO2 are based on improved recovery of oil and methane respectively resulting from CO2 storage. However, CO2 storage may result in the contamination of geological resources (such as hydrocarbons and minerals) or inhibit their recovery or future exploitation.
Note that the potential impact on groundwater resources is considered in 'Impacts on groundwater'.
Relevance to performance and safety:
Impacts on the exploitation of natural resources can be positive (such EOR and ECBM) and/or negative (such as inhibited recovery). These may result in other (for example, financial) impacts, or may be endpoints of interest in themselves.
References
7.2.5 Modified hydrology and hydrogeology
Category: Process
Description
The injection of CO2 may result in modifications to both the deep hydrogeology and near-surface hydrology.
Relevance to performance and safety:
Changes in the deep hydrogeology or near-surface hydrology may affect aquifer abstraction or even surface hydrology for groundwater driven features. These impacts may be either positive or negative.
7.2.6 Modified geochemistry
Category: Process
Description
The injection of CO2 will modify the geochemistry of the storage system. This may be confined to the immediate vicinity of the storage location, or, through leakage from the reservoir, may affect other locations.
Relevance to performance and safety:
The extent of geochemical modifications may be an endpoint of interest, due to resulting changes to geological processes. For example, the acidification of the geochemical regime may cause minerals to be dissolved, with potential implications for the porosity and stability of the geological formations.
References
7.2.7 Modified seismicity
Category: Event, Process
Description
Injection of CO2 into a geological formation may induce seismic events and processes.
Relevance to performance and safety:
Induced seismicity may be an endpoint of interest in itself, or it can result in other impacts, such as physical disruption of the surface environment.
References
- Sminchak J, Gupta N, Byrer C and Bergman P (2002) Journal of Energy and Environmental Research.
- Li X, Koide H, Ohsumi T, Li Q and Wu Z (2003) Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies.
- Holloway et al. (1996) Final Report of the EC JOULE II Programme.
7.2.8 Modified surface topography
Category: Event, Process
Description
The gradual or sudden sinking (subsidence) or elevation (uplift) of the topography of the terrestrial surface or marine sea-bed.
Relevance to performance and safety:
Deformation of the terrestrial surface or sea-bed may be an endpoint of interest in itself, or may result in other impacts, such as damage to property.
References
7.2.8.1 Sinkhole formation
Category: Feature, Event, Process
Description
Addition of CO2 in a limestone or carbonate-rich aquifer could result in dissolution of the rock matrix and the enlargement of voids. If this process takes place at relatively shallow depth collapse may result in subsidence at the surface and sinkhole formation.
For example, CO2 leakage around a borehole drilled to extract natural CO2 from a reservoir in Florina, Greece, resulted in subsidence around the borehole that filled up with water (see image below).

Relevance to performance and safety:
Large scale collapse structures may cause significant change to surface topography and possible CO2 migration paths. Sinkholes can provide locations where leaking CO2 can accumulate.
7.2.9 Impacts on oceans
Category: Process
Description
The surface waters of the oceans are slightly alkaline, with a pH range of 7.8-8.5. The variation is due to local, regional and seasonal effects. At present, a portion of the higher levels of atmospheric CO2 is already being taken up by the oceans. The effects of the dissolution of some of the additional atmospheric carbon dioxide into the surface ocean have been an increase in the concentrations of dissolved carbon dioxide and bicarbonate (smaller relative, but greater absolute, effect on bicarbonate than on dissolved carbon dioxide), and a decrease in the carbonate concentration and pH.

Relevance to performance and safety:
The potential for ocean acidification may be an assessment endpoint in itself. It also has the potential to impact on marine flora and fauna.
References
- Doney S C , Fabry V J, Feely R A and Kleypas J A (2009) Annual Review of Marine Science.
- Hofman M and Schnellhuber H-J (2009) PNAS.
- Shitashima K, Meada Y, Koike Y and Oshumi T (2008) International Journal of Greenhouse Gas Control.
Links
7.3 Impacts on flora and fauna
Category: (None)
Description
FEPs relevant to impacts on flora and fauna.
Relevance to performance and safety:
Impacts on flora and fauna can be postulated as a result of storage operations, even if there are no associated impacts to humans.
7.3.1 Effect of CO2 on animals.
Category: Process
Description
Oxygen is an essential requirement for respiration in animals and is therefore needed to sustain life. High concentrations of CO2 in air or water will lead to suffocation of terrestrial and aquatic animals due to a lack of oxygen reaching the blood stream.
If meteorological conditions do not disperse CO2 released to the atmosphere, it can gather close to the surface and remain in depressions, such as natural hollows. This property allows CO2 to reach high concentrations if released in sufficient quantities under particular atmospheric conditions.
In a similar way to gaseous CO2 being denser than air, water containing high concentrations of dissolved CO2 is denser than pure water, a factor that contributes to the limnic eruption phenomenon observed at Lake Nyos. In addition to the possibility of dissolved CO2 causing asphyxiation in aquatic organisms, if gaseous CO2 forms a layer at the surface of water bodies, it can prevent the oxygenation of the water and lead to a reduction of the O2 concentration thereby contributing to asphyxiation of aquatic organisms.
Benthic and deep sea organisms might be adversely affected by increased levels of CO2 and changes in pH. There is some evidence for the modification of fish behaviour and changes in mortality as a result of sudden increases in pH. Ongoing research is investigating whether changes in pH lead to the dissolution of calciferous structures, affecting crustaceans, molluscs, coral and some species of plankton, or whether calcification might actually increase.

Relevance to performance and safety:
Asphyxiation and/or other impacts on fauna could be endpoints relevant to performance and safety. In the marine environment, this includes potential effects on calcification of marine fauna, including corals.
References
- Tamburri M N, Peltzer E T, Friederich G E, Aya I, Yamane and Brewer P (2000) Marine Chemistry.
- Watanabe Y, Yamaguchi A, Ishida H, Harimoto T, Suzuki S, Sekido Y, Ikeda T, Shirayama Y, Mac Takahashi M, Ohsumi T and Ishizaka J (2006) Journal of Oceanography.
- Widdicombe S and Spicer J I (2008) Journal of Experimental Marine Biology and Ecology.
- Wood H L, Spicer J I and Widdicombe S (2008) Proceeding of the Royal Society B: Biological Sciences.
- Kling G W, Clark M A and Compton H R (1987) Science.
- Beaubien  S E, Citoli G and Lombardi S (2003) Journal of Volcanology and Geothermal Research.
Links
7.3.2 Effect of CO2 on plants and algae
Category: Process
Description
Plants and algae (in both terrestrial and marine environments) use energy in sunlight to photosynthesize carbohydrates from CO2 and water (H2O). Increasing concentrations of CO2 around the photosynthetic tissues increases the rate of photosynthesis and therefore growth and productivity in terrestrial and aquatic plants and algae.
However, the roots of most terrestrial plants need oxygen to breakdown carbohydrates to provide energy for root growth and healthy metabolism, a process called aerobic respiration. High concentrations of CO2 in the soil reduces the availability of O2 and can cause roots and therefore plants to die.
At Mammoth Mountain, in California, CO2 has accounted for up to 95% of the gas concentration in soil at the edge of Horseshoe Lake due to release from natural geological CO2 reservoirs caused by volcanic activity. These high soil concentrations have resulted in areas of forest being killed (see picture below).
In the marine environment, some phytoplankton are calciferous, i.e. bearing, producing or containing polymorphs of calcium carbonate. The carbonate ion can be at supersaturated concentrations in sea water. As the pH in the ocean drops, so the concentration of the carbonate ion drops until it becomes undersaturated. In this situation, calcium carbonate structures may become more vulnerable to dissolution resulting in reduced calcification of phytoplankton.

Relevance to performance and safety:
Elevated levels of CO2 in the soil, atmosphere and/or water may impact on the growth and/or calcification of plants and algae.
References
- Raschi A, Miglietta F, Tognetti R and van Gardingen P R (eds) (1997) Cambridge University Press, UK.
- Jones M H and Curtis P S (eds) (2000) Oak Ridge National Laboratory and the Carbon Dioxide Information Analysis Centre.
- Beaubien S E, Ciotoli G, Coombs P, Dictor M C, Krüger M, Lombardi S, Pearce J M and West J M (2008) International Journal of Greenhouse Gas Control.
- Riebesell U, Zondervan I, Rost B, Tortell P D, Zeebe R E and Morel F M M (2000) Nature.
- Iglesias -Rodriguez M D, Halloran P R, Rickaby R E M, Hall I R, Colmenero-Hidalgo E, Gittins J R, Green D R H, Tyrrell T, Gibbs S J, von Dassow P, Rehm E, Armbrust E V and Boessenkool K P (2008) Science.
- West J M, Pearce J M, Coombs P, Ford J R, Scheib C, Colls J J, Smith K L and Steven M D (2009) Energy Procedia.
Links
7.3.3 Ecotoxicology of contaminants
Category: Process
Description
Contaminants other than CO2 may be introduced to the biosphere as a result of geological CO2 storage due to:
- impurities associated with the storage fluid, such as hydrogen sulphide (H2S), methane (CH4), nitrogen oxides (NOx) and mercaptans;
- the mobilisation of substances in the geological environment due to the storage of CO2, such as hydrocarbons, brine, CH4 and heavy metals;
- the mobilisation of heavy metals in near-surface sediments.
Relevance to performance and safety:
Should they migrate to the biosphere, contaminants associated with and/or mobilised by CO2 storage may have a toxic effect on organisms.
References
- Sunda W and Guillar R R L (1976) Journal of Marine Research.
- Teske A (2009) Encyclopedia of Microbiology (Third Edition).
Links
7.3.4 Ecological effects
Category: Process
Description
Geological storage of CO2 may have an impact on the biosphere at a community, population and/or ecological level, with subsequent implications for biodiversity. The potential impact of releases of CO2 and associated or mobilised contaminants into the biosphere may disrupt biological interactions sufficiently to modify the terrestrial or marine ecosystems affected.
For example, the sudden release of natural CO2 due to the limnic eruption at Lake Nyos, Cameroon, resulted in the sudden death of wildlife, but was unlikely to affect the ecology in the longer term. However, the continued gradual release of natural CO2 into soil near Mammoth Mountain, California, has been sufficient to kill trees and damage the local ecosystem since 1996 until the present day.
Release of carbon dioxide to marine or fresh water environments would increase pCO2 concentrations and decrease pH. Such perturbations have the potential to impact upon marine and freshwater ecology.
Relevance to performance and safety:
The degree of potential ecological disruption resulting from geological CO2 storage may be an endpoint of interest, especially if the ecosystem affected is considered valuable and/or sensitive to perturbations.
References
- Turley C, Blackford J C, Widdicombe S, Lowe D, Nightingale P D and Rees A P (2005) Avoiding Dangerous Climate Change.
- Hall-Spencer J M, Rodolfo-Metalpa R, Martin S, Ransome E, Fine M, Tuner S M, Rowley S J, Tedesco D and Buia M-C (2008) Nature.
- West J M, Pearce J M, Coombs P, Ford J R, Scheib C, Colls J J, Smith K L and Steven M D (2009) Energy Procedia.
- Brownman H I et al. (2008) Marine Ecology Progress Series.
Links
7.3.5 Modification of microbiological systems
Category: Process
Description
Microbes will be present at depth as well as in the near-surface and surface environments. CO2 storage may disrupt microbial aerobic respiration but may enhance anaerobic respiration, with subsequent implications for the processes in which the microbes are involved.
Microbes play an important role in all terrestrial and marine ecosystems, including those associated with extreme environments, such as deep sea hydrothermal vents.
Primary producers of biomass (also known as autotrophs) are the organisms at the base of the food web, from which the other organisms obtain their energy. Whereas in terrestrial ecosystems plants are the primary producers of the system, in the marine environment it is microbes (phytoplankton and cyanobacteria) which are the primary producers. It is possible that microbes in the deep ocean will not be as adaptable to changes in pH and CO2 concentrations.
Relevance to performance and safety:
The potential impact of CO2 storage on aerobic and anaerobic microbial respiration in the geosphere, terrestrial and marine biosphere may be an endpoint of interest. A low-pH, high CO2 environment may favour some species and harm others.
References
- Ehrlich H L (1996) Marcel Dekker, Inc., New York.
- Ishida H, Watanabe Y, Fukuhara T, Kaneko S, Furusawa K, and Shirayama Y (2005) Journal of Oceanography.
- West J M and Chilton P J (1997) Quarterly Journal of Engineering Geology and Hydrogeology.
- Mitchell A C, Phillips A J, Hamilton M A, Gerlach R, Hollis W K, Kaszuba J P and Cunningham A B (2008) The Journal of Supercritical Fluids.
- Mitchell A C, Phillips A J, Hiebert R, Gerlach R, Spangler L H and Cunningham A B (2009) International Journal of Greenhouse Gas Control.
- Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) (2005) IPCC Special Report.
Links
7.4 Impacts on humans
Category: (None)
Description
FEPs relevant to adverse impacts on people.
Relevance to performance and safety:
A range of possible impacts to human beings can be postulated as a result of storage operations.
7.4.1 Health effects of CO2
Category: Process
Description
Elevated atmospheric concentrations of CO2 can result in both acute and chronic health effects in humans. If meteorological conditions do not disperse CO2 released to the atmosphere, it can gather close to the surface and remain in depressions, such as the basement of buildings or at the surface of lakes. This property allows CO2 to reach high concentrations if released in sufficient quantities under particular atmospheric conditions.
The primary health effect of concern is asphyxiation. Oxygen is an essential requirement for respiration in humans and is therefore needed to sustain life. High concentrations of CO2 in air will lead to suffocation of humans due to a lack of oxygen reaching the blood stream. Asphyxiation can occur once atmospheric concentrations reach approximately 10% CO2.
Other health effects include those directly associated with elevated concentrations of CO2 in the blood stream, such as acidosis (acidification), and physiological responses to the elevated blood CO2, such as stimulation of the sympathetic nervous system and the release of catecholamines (such as adrenaline).
The 1986 Lake Nyos disaster in Cameroon provides a graphic example of the potential effects of high atmospheric concentrations of CO2. A large limnic eruption resulted in the death of approximately 1800 people in the surrounding area and up to 27 km away.

Relevance to performance and safety:
The potential for CO2 to be released to the atmosphere in sufficient quantities to cause health effects in humans will be an endpoint of interest in assessing the geological storage of CO2.
References
- Baxter P J and Kapila M (1989) Journal of Volcanology and Geothermal Research.
- Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) (2005) IPCC Special Report.
- West J, Pearce J, Bentham M, Rochelle C, Maul P and Lombardi S (2006) 8th International Conference on Greenhouse Gas Control Technologies.
Links
7.4.2 Toxicity of contaminants
Category: Process
Description
Contaminants other than CO2 may be introduced to the biosphere as a result of geological CO2 storage due to:
- impurities associated with the storage fluid, such as hydrogen sulphide (H2S), methane (CH4), nitrogen oxides (NOx) and mercaptans;
- the mobilisation of substances in the geological environment due to the storage of CO2, such as hydrocarbons, CH4 and heavy metals.
Such contaminants may be toxic to humans and could cause harm if exposure pathways exist.
The toxicity will depend on: the form of exposure, e.g. ingestion or inhalation, leading to internal exposure or proximity to concentrations of contaminants leading to external exposure; the metabolism of the contaminant and physico-chemical form if inhaled or ingested, which will determine the extent to which the element/species may be taken up and retained in body tissues.
Relevance to performance and safety:
The potential for contaminants associated with an/or mobilised by CO2 storage to cause harm to humans is an endpoint of interest when assessing the geological storage of CO2.
Links
7.4.3 Impacts from physical disruption
Category: Process
Description
Impacts on humans due to physical disruption of the environment caused by geological CO2 storage. For example, damage to buildings due to induced seismicity, damage to farmland due to subsidence or uplift.
Relevance to performance and safety:
Physical disruption of the environment caused by CO2 storage may have a detrimental impact on humans.
7.4.4 Impacts from ecological modification
Category: Process
Description
Impacts on humans due to ecological modification. These may be negative (for example, reduced timber yields due to damage caused to trees by CO2 in the soil) or positive (for example, increased crop yields due to higher atmospheric CO2).
Relevance to performance and safety:
Ecological modification caused by CO2 storage may have a positive or negative impact on humans.
References
Author | NEA |
---|---|
Title | Features, Events and Processes (FEPs) for Geologic Disposal of Radioactive Waste |
Date | 2000-08-01 |
Publisher | OECD |
Description | Safety assessments of disposal sites for radioactive waste involve analyses of potential releases of radionuclides from the disposed waste and subsequent transport to the human environment. An important stage of assessment is the identification and documentation of all the features, events and processes (FEPs) that may be relevant to long-term safety. This report provides an international compilation of FEPs as well as a basis for selecting the FEPs that should be included in safety analyses. |
Author | Holloway et al. |
---|---|
Title | The Underground Disposal of Carbon Dioxide |
Publication | Final Report of the EC JOULE II Programme |
Date | 1996-02 |
Publisher | British Geological Survey |
Description | ISBN 0 85272 280 X |
Author | Dall'Aglio, M., Quattrocchi, F., Tersigni, S. |
---|---|
Title | Geochemical evolution of groundwater of the Iblean Foreland (south-eastern Sicily) after the December 13, 1990 earthquake (M = 5.4) |
Publication | Annali di Geofisica |
Date | 1995 |
Volume number | 38 |
Pages | 309--329 |
Author | Quattrocchi, F |
---|---|
Title | In search of evidence of deep fluid discharges and pore pressure evolution in the crust to explain the seismicity style of the Umbria-Marche 1997-1998 seismic sequence (Central Italy) |
Publication | Annali di Geofisica |
Date | 1999 |
Volume number | 42 |
Pages | 1--29 |
Author | Ingebritsen and Sandford |
---|---|
Title | Groundwater in Geologic Processes |
Date | 1998 |
Publisher | Cambridge University Press |
Author | Heggland, R. |
---|---|
Title | Detection of gas migration from a deep source by the use of exploration 3D seismic data |
Publication | Marine Geology |
Date | 1997 |
Volume number | 137 |
Pages | 41--47 |
Author | Crank J |
---|---|
Title | The mathematics of diffusion (2nd edition) |
Date | 1975 |
Publisher | Oxford University Press |
URL | http://www.amazon.co.uk/exec/obidos/ASIN/0198534116/ref=sr_aps_books_1_1/026-8786825-5333228 |
Author | Spitz K and Moreno J |
---|---|
Title | A practical guide to groundwater and solute transport modelling |
Date | 1996 |
Publisher | John Wiley and Sons Ltd |
Author | Miller B, Savage D, McEwen T and White M |
---|---|
Title | Encyclopaedia of Features, Events and Processes (FEPs) for the Swedish SFR and Spent Fuel Repositories |
Publication | SKI Report 02:35 |
Date | 2002-08 |
Publisher | Swedish Nuclear Power Inspectorate, Stockholm, Sweden |
Author | McCarthy J, Canziani O F, Leary N A, Dokken D J and White K S (Eds) |
---|---|
Title | Climate Change 2001: Working Group II: Impacts, Adaptation and Vulnerability |
Date | 2001 |
Publisher | Cambridge University Press |
Description | Working Group II: Impacts, Adaptation and Vulnerability |
URL | http://www.grida.no/climate/ipcc_tar/wg2/index.htm |
Author | Brubaker R D and Christiansen A C |
---|---|
Title | Legal Aspects of Underground CO2 Storage: Summary of Developments under the London Convention and North Sea Conference |
Date | 2001-12-14 |
Publisher | The Fridtjof Nansen Institute |
Description | A report by The Fridtjof Nansen Institute on behalf of Statoil evaluating the position of CO2 storage in light of the institutional framework of the London and OSPAR Conventions. |
URL | http://www.fni.no/doc&pdf/DB_ACC_underground_co2_storage.pdf |
Author | Lenstra W J and van Engelenburg B C W |
---|---|
Title | Legal and policy aspects: impact on the development of CO2 storage |
Date | 2002-07 |
Publisher | Intergovernmental Panel on Climate Change (IPCC) Workshop on Carbon Sequestration, November 18-22, 2002, Regina, Saskatchewan, Canada. |
Description | Reviews the legal framework for CO2 capture and storage |
URL | ftp://ftp.ecn.nl/pub/www/library/conf/ipcc02/ccs02-08.pdf |
Author | Lindeberg E |
---|---|
Title | The Quality of a CO2 Repository: What is the Sufficient Retention Time of CO2 Stored Underground |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 255--260 |
Description | Paper presented at the 6th International Conference on Greenhouse Gas Control Technologies (GHGT6), 1 - 4 October 2002, Kyoto Japan |
Author | Li X, Koide H, Ohsumi T, Li Q and Wu Z |
---|---|
Title | Mechanical Stability of the Potential CO2 Sequestration Sites in Japan |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 501--506 |
Description | Paper presented at the 6th International Conference on Greenhouse Gas Control Technologies (GHGT6), 1 - 4 October 2002, Kyoto Japan |
Author | Douglas B C |
---|---|
Title | Global sea level change: Determination and interpretation |
Publication | Reviews of Geophysics |
Date | 1995 |
Publisher | American Geophysical Union |
Volume number | 33 |
Pages | 1425--1432 |
Description | Paper by Bruce Douglas of the US National Oceanographic Data Center |
Author | Watson R T, Zinyowera M C, Moss R H (Eds) |
---|---|
Title | IPCC Special Report on The Regional Impacts of Climate Change |
Date | 1997 |
Publisher | Cambridge University Press |
Description | Part of the Third Assessment Report (TAR) produced by Working Group II of the Intergovernmental Panel on Climate Change |
URL | http://www.grida.no/climate/ipcc/regional/index.htm |
Author | Pidwirny M J |
---|---|
Title | Fundamentals of Physical Geography |
Publication | Online textbook |
Date | 2003 |
Description | Section 10(ag) concerns periglacial processes and landforms. |
URL | http://www.physicalgeography.net/fundamentals/10ag.html |
Author | Houghton J T, Ding Y, Griggs D J, Noguer M, van der Linden P J and Xiaosu D (Eds.) |
---|---|
Title | Climate Change 2001: The Scientific Basis |
Date | 2001 |
Publisher | Cambridge University Press |
Description | Part of the Third Assessment Report (TAR), has been produced by Working Group I of the Intergovernmental Panel on Climate Change and focuses on the science of climate change. It covers the physical climate system, the factors that drive climate change, analyses of past climate and projections of future climate change, and detection and attribution of human influences on recent climate. |
URL | http://www.grida.no/climate/ipcc_tar/wg1/index.htm |
Author | Moburg R, Stewart D B and Stachniak D |
---|---|
Title | The IEA Weyburn CO2 Monitoring and Storage Project |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 219--224 |
Description | Describes the background, organisation and management of the Weyburn project and presents early monitoring results. |
Author | Parry M, Canziani O, Palutikof J, van der Linden P and Hanson C (eds.) |
---|---|
Title | Climate Change 2007: Impacts, Adaptation and Vulnerability |
Publication | Fourth Assessment Report of the Intergovernmental Panel on Climate Change |
Date | 2007 |
Publisher | Cambridge University Press |
Description | Published for the Intergovernmental Panel on Climate Change |
URL | http://www.ipcc.ch/publications_and_data/ar4/wg2/en/contents.html |
Author | Torp T A and Gale J |
---|---|
Title | Demonstrating Storage of CO2 in Geological Reservoirs: The Sleipner and SACS Projects |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 311--316 |
Description | Describes the background and concepts to the Sleipner and SACS projects concerning CO2 sequestration in saline aquifers. |
Author | Knox P, Paine J and Hovorka S |
---|---|
Title | Optimal Geological Environments for Carbon Dioxide Disposal in Brine Formations (Saline Aquifers) in the United States - Pilot Experiment in the Frio Formation, Houston Area |
Date | 2003-04 |
Publisher | Bureau of Economic Geology, The University of Texas at Austin |
Description | for U.S. Department of Energy, National Energy Technology Laboratory |
Author | van Bergen F, Pagnier H J M, van der Meer L G H, van den Belt F J G, Winthaegen P L A and Westerhoff R S |
---|---|
Title | Development of a Field Experiment of CO2 Storage in Coal Seams in the Upper Silesian Basin of Poland (RECOPOL) |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 569--574 |
Description | Describes the concept behind the RECOPOL pilot project for CO2 sequestration in subsurface coal seams in Poland. |
Author | Arts R, Eiken O, Chadwick A, Zweigel P, van der Meer L and Zinszner B |
---|---|
Title | Monitoring of CO2 Injected at Sleipner using Time Lapse Seismic Data |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2002 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 347--352 |
Description | Describes the results of two time-lapse seismic surveys of CO2 injected into a saline aquifer at Sleipner, within the SACS project. |
URL | http://cired.no/project/IK23430000%20SACS/Publications/Arts_etal_GHGT6_seismic_monitoring.pdf |
Author | Newmark R L, Ramirez A L and Daily W D |
---|---|
Title | Monitoring Carbon Dioxide Sequestration using Electrical Resistance Tomography (ERT): A Minimally Invasive Method |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 353--538 |
Description | A paper describing numerical simulations and laboratory experiments to determine the potential of ERT methods to detect and monitor CO2 in the subsurface. |
Author | Waller R M |
---|---|
Title | Ground Water and the Rural Homeowner |
Publisher | USGS |
Description | U.S. Department of the Interior / U.S. Geological Survey |
URL | http://pubs.usgs.gov/gip/gw_ruralhomeowner/gw_ruralhomeowner_new.html |
Author | Xue Z, Ohsumi T and Koide H |
---|---|
Title | Laboratory Measurements of Seismic Wave Velocity by CO2 Injection in Two Porous Sandstones |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 359--364 |
Description | Laboratory experiments to measure the compressional wave velocities under hydrostatic pressure in sandstone. |
Author | Chadwick A, Arts R, Bernstone C, May F, Thibeau S and Zweigel P |
---|---|
Title | Best Practice for the Storage of CO2 in Saline Aquifers |
Date | 2006 |
Publisher | EC |
Description | Observations and guidelines from the SACS and CO2STORE projects. |
Author | Emberley S, Hutcheon I, Shevalier M, Durocher K, Gunter W D and Perkons E H |
---|---|
Title | Geochemical Monitoring of Flui-Rock Interaction and CO2 Storage at the Weyburn CO2-Injection Enhanced Oil Recovery Site, Saskatchewan, Canada |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 365--370 |
Description | The results of baseline and post-injection samples of produced fluids from 45 wells were analysed and compared. |
Author | Hoversten G M, Gritto R, Daley T M, Majer E L and Myer L R |
---|---|
Title | Crosswell Seismic and Electromagnetic Monitoring of CO2 Sequestration |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 371--376 |
Description | Demonstrating a methodology for jointly interpreting crosswell seismic and electromagnetic data, in conjunction with detailed constitutive relations between geophysical and reservoir parameters. |
Author | Myer L R, Hoversten G M and Gasperikova E |
---|---|
Title | Sensitivity and Cost of Monitoring Geologic Sequestration using Geophysics |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 2003 |
Description | Rock physics models were used to calculate anticipated contrasts in seismic velocity and impedance in brine saturated rock when CO2 is introduced. Results are presented from a model based on Texas Gulf coast geology. Results indicate monitoring costs may be only a small percentage of overall geologic sequestration costs. |
Author | Strutt M H, Beaubien S E, Beaubron J C, Brach M, Cardellini C, Granieri R, Jones D G, Lombardi S, Penner L, Quattrocchi F and Voltatorni N |
---|---|
Title | Soil Gas as a Monitoring Tool of Deep Geological Sequestration of Carbon Dioxide: Preliminary Results from the EnCana EOR Project in Weyburn, Saskatchewan (Canada) |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 391--396 |
Description | Natural background levels and concentration distributions have been established for measured soil gases for comparison with future data sets to estimate CO2 storage integrity for the reservoir rocks. |
Author | Islam R, Malik Q, Huang S and Dong M |
---|---|
Title | Potential of Greenhouse Gas Storage and Utilisation through Enhanced Oil Recovery |
Publication | Saskatchewan Research Council Publication Number P-110-468-C-99 |
Date | 1999-09 |
Publisher | Saskatchewan Research Council |
Description | Report conducted under the auspices of the Petroleum Technology Research Centre |
Author | Ennis-King J and Paterson L |
---|---|
Title | Rate of Dissolution due to Convective Mixing in the Underground Storage of Carbon Dioxide |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 507--510 |
Description | Consideration of the increased rate of dissolution due to convective mixing between injected CO2 and underlying brine. |
Author | Sminchak J, Gupta N, Byrer C and Bergman P |
---|---|
Title | Issues Related to Seismic Activity Induced by the Injection of CO2 in Deep Saline Aquifers |
Publication | Journal of Energy and Environmental Research |
Date | 2002-02 |
Publisher | National Energy Technology Laboratory, US Department of Energy |
Volume number | 2 |
Pages | 32--47 |
Description | Case studies, theory, regulation, and special considerations regarding the disposal of carbon dioxide (CO2) into deep saline aquifers are investigated to assess the potential for induced seismic activity. |
URL | http://www.netl.doe.gov/publications/journals/vol2_no1.pdf |
Author | Benson S M and Myer L |
---|---|
Title | Monitoring to ensure safe and effective geologic sequestration of carbon dioxide |
Publication | Intergovernmental Panel on Climate Change (IPCC) Workshop on Carbon Sequestration, November 18-22, 2002, Regina, Saskatchewan, Canada. |
Date | 2002 |
Description | Paper by authors from the Lawrence Berkeley National Laboratory concerning methods for monitoring geological CO2 sequestration. |
URL | ftp://ftp.ecn.nl/pub/www/library/conf/ipcc02/ccs02-10.pdf |
Author | Ohga K, Sasaki K, Deguchi G and Fujioka M |
---|---|
Title | Fundamental Tests on Carbon Dioxide Sequestration into Coal Seams |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 531--537 |
Description | Paper concerning various laboratory adsorption and methane replacement tests. |
Author | Shi J Q and Durucan S |
---|---|
Title | Methane Displacement Desorption in Coal by CO2 Injection: Numerical Modelling of Multi-Component Gas Diffusion in Coal Matrix |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 539--544 |
Description | A numerical model for competitive displacement of adsorbed methane by CO2 injection is presented. |
Author | Reeves S R and Schoeling L |
---|---|
Title | Geological Sequestration of CO2 in Coalseams: Reservoir Mechanisms, Field Performance and Economics |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 5th International Conference on Greenhouse Gas Control Technologies |
Date | 2001 |
Publisher | CSIRO Publishing |
Volume number | 1 |
Pages | 593--598 |
Description | Describes a joint U.S. Department of Energy and industry project to study the reservoir mechanisms, field performance and economics of CO2 sequestration in coalseams. |
URL | http://www.coal-seq.com/Proceedings/GHGT5.pdf |
Author | West J M and Chilton P J |
---|---|
Title | Aquifers as Environments for Microbiological Activity |
Publication | Quarterly Journal of Engineering Geology and Hydrogeology |
Date | 1997 |
Publisher | Geological Society |
Volume number | 30 |
Pages | 174--154 |
Description | Paper concerning the ability of aquifers to support microbial activity. |
Author | Koide H, Nishimura S, Satsumi S, Xue Z and Li X |
---|---|
Title | Carbon Sequestration in Coal Seams in Japan and Biogeochemical Carbon Cycle in Tertiary Sedimentary Basins |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK. |
Volume number | 1 |
Pages | 703--708 |
Description | Paper concerning enhanced methanogenesis in Japanese coal seams through sequestration of CO2. |
Author | Deo M D |
---|---|
Title | Enhancing the Effectiveness of Carbon Dioxide Flooding by managing Asphaltene Precipitation |
Date | 2000 |
Publisher | Petroleum Research Centre, University of Utah |
Description | Description of a project looking into enhancing oil recovery by CO2 injection through managing asphaltene precipitation. |
Author | Johnson J W and Nitao J J |
---|---|
Title | Reactive Transport Modelling of Geologic CO2 Sequestration at Sleipner |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 327--332 |
Description | Paper concerning the reactive transport modelling of prograde and retrograde saline-aquifer CO2 storage at Sleipner. |
Author | Solomon S, Qin D, Manning M, Chen Z, Marquis M, Averyt K B, Tignor M and Miller H L (eds.) |
---|---|
Title | Climate change 2007: The Physical Science Basis |
Publication | Fourth Assessment Report of the Intergovernmental Panel on Climate Change |
Date | 2007 |
Publisher | Cambridge University Press |
Description | Published for the Intergovernmental Panel on Climate Change |
URL | http://www.ipcc.ch/publications_and_data/ar4/wg1/en/contents.html |
Author | Rochelle C A, Czernichowski-Lauriol I and Milodowski A E |
---|---|
Title | The Impact of Chemical Reactions on CO2 Storage in Geologic Formations: A Brief Review |
Publication | Geological Society, London, Special Publications |
Date | 2004 |
Publisher | Geological Society |
Volume number | 233 |
Pages | 87--106 |
Description | Paper highlighting some chemical reactions of interest in considering geological storage of CO2 and their implications. |
Author | Fokker P A and van der Meer L G H |
---|---|
Title | The Injectivity of Coalbed CO2 Injection Wells |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 551--556 |
Description | Paper describing the analysis of data and simulation associated with the injection rate of CO2 into coalbed methane field. |
Author | Watson M and Kirste D |
---|---|
Title | An integrated petrological and geochemical approach to predicting long term CO2-induced diagenesis in geosequestration |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Koide H, Takahashi M, Shindo Y, Tazaki Y, Iijima M, Ito K, Kimura N and Omata K |
---|---|
Title | Hydrate Formation in Sediments in the Sub-Seabed Disposal of CO2 |
Publication | Energy |
Date | 1997 |
Publisher | Pergamon, Oxford, UK |
Volume number | 22 |
Pages | 279--283 |
Description | Paper considering the formation of CO2 hydrate in sediment pores during the sub-seabed disposal of CO2 |
Author | Dendy Sloan E, Jr |
---|---|
Title | Clathrate Hydrates of Natural Gases |
Date | 1998 |
Publisher | Marcel Dekker, Inc |
Description | Contains information concerning CO2 hydrates. |
Author | Whittaker S G and Rostron B |
---|---|
Title | Geologic Storage of CO2 in a Carbonate Reservoir within the Williston Basin, Canada: An Update |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2001 |
Publisher | Pergamon, Oxford UK |
Volume number | 1 |
Pages | 385--390 |
Description | Describes the progress of the geological and deep hydrogeological work aimed at helping assess the geological system for long-term storage of CO2. |
Author | Ehrlich H L |
---|---|
Title | Geomicrobiology, 3rd Edition |
Date | 1996 |
Publisher | Marcel Dekker, Inc., New York |
Author | Oldenburg C M and Benson S M |
---|---|
Title | Carbon Sequestration with Enhanced Gas Recovery: Identifying Candidate Sites for Pilot Study |
Publisher | Earth Sciences Division, Lawrence Berkley National Laboratory, USA |
Description | Paper proposing a field test for carbon dioxide sequestration and enhanced gas recovery. |
URL | http://www.netl.doe.gov/publications/proceedings/01/carbon_seq/2a4.pdf |
Author | Okamoto L, Li X and Ohsumi T |
---|---|
Title | Effects of Supercritical CO2 on the Integrity of Cap Rock |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 483--488 |
Description | Paper concerning an investigation of the effects of supercritical CO2 on the integrity of cap rock by using samples of siltstone cap rock from an injection site in Japan. |
Author | Wittemann Co. |
---|---|
Title | Physical Properties of Carbon Dioxide |
Publisher | Wittemann Co. |
Description | Table of physical properties of carbon dioxide. |
URL | http://www.r744.com/knowledge/papers/files/pdf/pdf_088.pdf |
Author | Pruess K, Tsang C F, Law D and Oldenburg C |
---|---|
Title | Intercomparison of Simulation Models for CO2 Disposal in Underground Storage Reservoirs |
Publisher | GEOSEQ Paper |
Description | Paper proposing an intercomparison study between simulation codes for terrestrial sequestration of CO2. |
URL | http://repositories.cdlib.org/lbnl/LBNL-47353/ |
Author | Alvarez W |
---|---|
Title | T.rex and the Crater of Doom |
Date | 1998-07-28 |
Publisher | Princeton |
Description | Reference concerning the bolide impact at the Cretaceous-Tertiary (K-T) boundary. |
Author | Reeves S |
---|---|
Title | Coal-Seq Project Update: Field Studies of ECBM Recovery/CO2 Sequestration in Coalseams |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 557--562 |
Description | Progress report for the Coal-Seq project presented at GHGCT6. |
Author | Metz B, Davidson O, de Coninck H, Loos M and Meyer L (eds.) |
---|---|
Title | Carbon Dioxide Capture and Storage |
Publication | IPCC Special Report |
Date | 2005 |
Publisher | Cambridge University Press |
Description | Published for the Intergovernmental Panel on Climate Change |
URL | http://www.ipcc.ch/publications_and_data/publications_and_data_reports_carbon_dioxide.htm |
Author | Hildenbrand A, Krooss B M and Schlomer S |
---|---|
Title | Gas Breakthrough Experiments on Fine-Grained Sedimentary Rocks |
Publication | Geofluids |
Date | 2002 |
Publisher | Balckwell Science Ltd. |
Volume number | 2 |
Pages | 3--23 |
Description | Paper investigating the capillary sealing efficiency of fine-grained sedimentary rocks. |
Author | Friedmann S J and Nummedal D |
---|---|
Title | Reassessing the Geological Risks of Seal Failure for Saline Aquifers and EOR Projects |
Date | 2003 |
Publisher | National Energy Technology Laboratory, US Department of Energy |
Description | Paper concerning the risk of seal failure due to fault seal risks and thief zones. |
Author | Arts R J, Zweigel P and Lothe A E |
---|---|
Title | Reservoir Geology of the Utsira Sand in the Southern Viking Graben Area - A Site for Potential CO2 Storage |
Publication | 62nd EAGE Meeting, Glasgow, Paper B-20. |
Date | 2000 |
Publisher | SINTEF Petroleum Research |
Description | Paper describing the geology of the Utsira Sand with reference to the Sleipner CO2 storage project. |
URL | http://cired.no/project/IK23430000%20SACS/Publications/Arts_et_al_EAGE00.pdf |
Author | Enick R M and Klara S M |
---|---|
Title | CO2 Solubility in Water and Brine under Reservoir Conditions |
Publication | Chem. Eng. Comm. |
Date | 1990 |
Publisher | Gordon and Breach Science Publishers S.A. |
Volume number | 90 |
Pages | 23--33 |
Description | Paper describing the determination of the reference Henry's constant from the literature, along with a correlation for the A parameter from the Krichevsky-Ilinskaya equation. |
Author | Pichler T, Veizer J and Hall G E W |
---|---|
Title | The Chemical Composition of Shallow-Water Hydrothermal Fluids in Tutum Bay, Ambitle Island, Papua New Guinea and their effect on Ambient Seawater |
Publication | Marine Chemistry |
Date | 1999 |
Publisher | Elsevier |
Volume number | 64 |
Pages | 229--252 |
Description | Paper recording observations and theories concerning hydrothermal vents in the waters around Papua New Guinea. |
Author | Bromhal G S |
---|---|
Title | Pore-Level Modelling of Carbon Dioxide Sequestration in Oil Fields: A Study of Viscous and Buoyancy Forces |
Publication | NETL online paper |
Date | 2001 |
Publisher | National Energy Technology Laboratory, US Department of Energy |
Description | Paper describing a pore-level numerical model of the miscible injection of CO2 into a porous medium saturated with oil. |
URL | http://www.netl.doe.gov/publications/proceedings/01/carbon_seq/p43.pdf |
Author | Knox P R, Doughty C A and Hovorka S D |
---|---|
Title | Impacts of Buoyancy and Pressure Gradient on Field-Scale Geological Sequestration of CO2 in Saline Formations |
Publication | AAPG Annual Convention, Salt Lake City, Utah, May 11-14, 2003 |
Date | 2003 |
Description | Paper presented at the 2003 Annual AAPG Meeting in Salt Lake City. |
URL | http://www.searchanddiscovery.com/documents/abstracts/annual2003/short/79698.PDF |
Author | Streit J E and Hillis R R |
---|---|
Title | Building Geomechanical Models for the Safe Underground Storage of Carbon Dioxide in Porous Rock |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Volume number | 1 |
Pages | 495--500 |
Description | Description of geomechanical modelling undertaken within the GEODISC project. Paper presented at GHGCT6. |
Author | Gaus I, Azaroual M and Czernichowski-Lauiol I |
---|---|
Title | Reactive Transport Modelling of Dissolved CO2 in the Cap Rock Base during CO2 Sequestration (Sleipner Site, North Sea) |
Publication | Proceedings of the 2nd Annual Conference on Carbon Sequestration, 5-8 May 2003, Alexandria, VA, US |
Date | 2003-05 |
Description | Paper describing reactive transport modelling in the cap rock base of the Sleipner Site. |
URL | http://cired.no/project/IK23430000%20SACS/Publications/Gaus_etal_CarbonSeqIIConf.pdf |
Author | Gunter W D |
---|---|
Title | Geochemical Reactions |
Publication | Online presentation from the 2001 Workshop on Carbon Sequestration Science |
Date | 2001 |
Publisher | National Energy Technology Laboratory, US Department of Energy |
Description | Presentation concerning the geochemistry of CO2 sequestration. |
URL | http://www.netl.doe.gov/publications/proceedings/01/carbon_seq_wksp/2bGeochem.PDF |
Author | Whiting N M and Snyder M B |
---|---|
Title | A Study of the Effectiveness of Portland Cement Concrete: Curing Compounds |
Publication | Transportation Research Record: Journal of the Transportation Research Board |
Date | 2003 |
Publisher | Transportation Research Board of the National Academies |
Volume number | 1834 |
Pages | 59--68 |
Description | Paper describing the effectiveness of curing compounds for portland cement concrete. |
URL | http://trb.metapress.com/content/y1633g81927n5813/ |
Author | Raschi A, Miglietta F, Tognetti R and van Gardingen P R (eds) |
---|---|
Title | Plant Response to Elevated CO2: Evidence from Natural Springs |
Date | 1997 |
Publisher | Cambridge University Press, UK |
Description | Collection of papers concerning evidence for plant responses to elevated CO2 gathered from natural springs |
Author | Jones M H and Curtis P S (eds) |
---|---|
Title | Bibliography on CO2 Effects on Vegetation and Ecosystems: 1990-1999 Literature |
Date | 2000-07 |
Publisher | Oak Ridge National Laboratory and the Carbon Dioxide Information Analysis Centre |
Description | Bibliography of papers between 1990 and 1999 concerning CO2 effects on vegetation and ecosystems |
URL | http://cdiac.ornl.gov/epubs/cdiac/cdiac129/cdiac129.html |
Author | Hovland M and Judd A G |
---|---|
Title | Seabed Pockmarks and Seepages |
Date | 1988 |
Publisher | Graham and Trotman, London |
Author | Humphries S E, Zierenberg R A, Mullineaux L S and Thompson R E (eds) |
---|---|
Title | Seafloor Hydrothermal Systems: Physical, Chemical, Biological and Geological Interactions. |
Date | 1999 |
Publisher | American Geophysical Union |
Description | Collation of papers concerning the physical, chemical, biological and geological interactions of seafloor hydrothermal systems: |
Author | Vesovic V Wakeham W A, Olchowy G A, Sengers J V, Watson J T R and Millat J |
---|---|
Title | The Transport Properties of Carbon Dioxide |
Publication | Journal of Physical Chemistry |
Date | 1990 |
Volume number | 19 |
Pages | 763--808 |
Description | Paper containing representative equations for the viscosity and thermal conductivity of CO2. |
Author | Belonoshko A and Saxena S K |
---|---|
Title | A Molecular Dynamics Study of the Pressure-Volume-Temperature Properties of Supercritical Fluids: II. CO2, CH4, CO, O2 and H2 |
Publication | Geochimica et Cosmochimica Acta |
Date | 1991 |
Publisher | Pergamon Press, USA |
Volume number | 55 |
Pages | 3191--3208 |
Description | Paper concerning the use of molecular dynamics to simulate the pressure-volume-temperature properties of CO2, CH4, CO, O2 and H2. |
Author | Bachu S and Adams J J |
---|---|
Title | Sequestration of CO2 in Geological Media in Response to Climate Change: Capacity of Deep Saline Aquifers to Sequester CO2 in Solution |
Publication | Energy and Conversion Management |
Date | 2003 |
Publisher | Pergamon |
Volume number | 44 |
Pages | 3151--3175 |
Description | Paper concerning the determination of the capacity of deep saline aquifers to sequester CO2 |
Author | Toews K L, Schroll R M and Wai C M |
---|---|
Title | pH-Defining Equilibrium between Water and Supercritical CO2. Influence on SFE of Organics and Metal Chelates |
Publication | Analytical Chemistry |
Date | 1995-11-15 |
Volume number | 67 |
Pages | 4040--4043 |
Description | Paper concerning the pH measurement of water in contact with supercritical CO2. |
Author | Gunter W D, Perkins E H and Hutcheon I |
---|---|
Title | Aquifer Disposal of Acid Gases: Modelling of Water-Rock Reactions for Trapping of Acid Wastes |
Publication | Applied Geochemistry |
Date | 2000 |
Publisher | Pergamon |
Volume number | 15 |
Pages | 1085--1095 |
Description | Modelling the interaction of industrial waste streams with minerals in typical carbonate and sandstone aquifers from the Alberta Basin. |
Author | Law D H S and Bachu S |
---|---|
Title | Hydrogeological and Numerical Analysis of CO2 Disposal in Deep Aquifers in the Alberta Sedimentary Basin |
Publication | Energy Conversion and Management |
Date | 1996 |
Publisher | Pergamon |
Volume number | 37 |
Pages | 1167--1174 |
Description | A paper describing modelling the ability of aquifers to accept and retain CO2. |
Author | Jaffe P R and Wang S |
---|---|
Title | Potential Effect of CO2 Releases from Deep Reservoirs on the Quality of Fresh-Water Aquifers |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 2 |
Pages | 1657--1660 |
Description | A mathematical model of CO2 release from deep reservoirs and its effect on fresh-water aquifers. |
Author | Watanabe Y, Yamaguchi A, Ishida H, Ikeda T and Ishizaka J |
---|---|
Title | Lethal Effect of Elevated CO2 on Planktons Collected from Deep Sea in North Pacific |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 2 |
Pages | 1683--1685 |
Description | Observation of the lethal effects of the high partial pressure of CO2 on pelagic zooplankton. |
Author | Kita J, Ishimatsu A, Kikkawa T and Hayashi M |
---|---|
Title | Effects of CO2 on Marine Fish |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 2 |
Pages | 1695--1698 |
Description | Paper providing basic information on the impacts of CO2 on marine fish. |
Author | Baxter P J and Kapila M |
---|---|
Title | Acute Health Effects of the Gas Release at Lake Nyos, Cameroon, 1986 |
Publication | Journal of Volcanology and Geothermal Research |
Date | 1989-11 |
Volume number | 39 |
Pages | 265--275 |
Description | Results of a survey of medical records for 845 survivors of the Lake Nyos disaster that received hospital treatment. |
Author | Aylmore L A G, Sills I D and Quirk J P |
---|---|
Title | Surface Area of Homoionic Illite and Montmorillonite Clay Minerals as measured by the Sorption of Nitrogen and Carbon Dioxide |
Publication | Clays and Clay Minerals |
Date | 1970 |
Volume number | 18 |
Pages | 91--96 |
Author | Italiano F, Favara R, Etope G and Favali P |
---|---|
Title | Submarine Emissions of Greenhouse Gases from Hydrothermal and Sedimentary Areas |
Publication | Water-Rock Interaction, Cidu R (ed) |
Date | 2001 |
Publisher | A A Balkema |
Volume number | 2 |
Pages | 863--866 |
Description | Paper discussing the release of CO2 and CH4 from submarine sources and the subsequent dissolution of bubbles |
Author | Waltham T |
---|---|
Title | Crystal Geyser - Utah\'s Cold One |
Publication | Geology Today |
Date | 2001 |
Publisher | Blackwell |
Volume number | 17 |
Pages | 22--24 |
Description | A cold geyser appears to be a contradiction in terms. But a combination of carbon dioxide, effervescing groundwater and a fortuitous oil exploration well can create a very spectacular water fountain. |
URL | http://www3.interscience.wiley.com/journal/119021572/abstract |
Author | Baer J L and Rigby J K |
---|---|
Title | Geology of the Crystal Geyser and Environmental Implications of its Effluent |
Publication | Utah Geology |
Date | 1978 |
Volume number | 5 |
Pages | 125--130 |
Author | Nordgard Bolis H M and Ilermanrud I |
---|---|
Title | Rock Stress in Sedimentary Basins - Implications for Trap Integrity |
Publication | Hydrocarbon Seal Quantification, Koestler and Hunsdale (eds) |
Date | 2002 |
Publisher | Elsevier |
Pages | 17--35 |
Description | Norwegian Petroleum Society, Special Publication No.11 |
Author | Nakayama K and Sato D |
---|---|
Title | Prediction of Sealing Capacity by the Equivalent Grain Size Method |
Publication | Hydrocarbon Seal Quantification, Koestler and Hunsdale (eds) |
Date | 2002 |
Publisher | Elsevier |
Pages | 51--60 |
Author | Lewis H, Oldsen P and Couples G D |
---|---|
Title | Geomechanical Simulations of Top Seal Integrity |
Publication | Hydrocarbon Seal Quantification, Koestler and Hunsdale (eds) |
Date | 2002 |
Publisher | Elsevier |
Pages | 75--88 |
Author | Sperrevik S, Gillespie P A, Fisher Q J, Halvorsen T and Knipe R J |
---|---|
Title | Empirical Estimation of Fault Rock Properties |
Publication | Hydrocarbon Seal Quantification, Koestler and Hunsdale (eds) |
Date | 2002 |
Publisher | Elsevier |
Pages | 109--126 |
Author | Bruant R G, Giammar D E, Myneni S C B and Peters C A |
---|---|
Title | Effects of Pressure, Temperature and Aqueous Carbon Dioxide Concentration on Mineral Weathering as applied to Geologic Storage of Carbon Dioxide |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 2 |
Pages | 1609--1612 |
Description | Describes experiments to investigate the effects of pressure, temperature and aqueous solution composition on rates and mechanisms of silicate mineral dissolution and carbonate precipitation |
Author | McGrail B P, Ho A M, Reidel S P and Schaef H T |
---|---|
Title | Use and Features of Basalt Formations for Geologic Sequestration |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 2 |
Pages | 1637--1640 |
Description | Paper describing the use and features of basalt formations for geologic sequestration of CO2 |
Author | Blencoe J G, Cole D R, Horita J and Moline G R |
---|---|
Title | Experimental Geochemical Studies Relevant to Carbon Sequestration |
Publication | Online paper presented at the First National Conference on Carbon Sequestration |
Date | 2001 |
Publisher | National Energy and Technology Laboratory, US Department of Energy |
Description | Describes 3 on-going CO2 sequestration research studies at the Oak Ridge National Laboratory: 1) isotopic and tracer studies in support of the GEO-SEQ project; 2) isotopic partitioning in carbonate-brine systems under subsurface conditions; and 3) volumetric properties and phase relations of CO2-CH4-H20 fluids. |
URL | http://www.netl.doe.gov/publications/proceedings/01/carbon_seq/p31.pdf |
Author | Sibson R H |
---|---|
Title | Fluid Flow Accompanying Faulting: Field Evidence and Models |
Publication | In: Simpson, D.W. & Richards, P.G. (eds.), Earthquake Prediction: An International Review |
Date | 1981 |
Publisher | Am. Geophys. Union, Maurice Erwing Series |
Volume number | 4 |
Pages | 593--603 |
Description | Reference for fault valving |
Author | Sibson R H |
---|---|
Title | Implications of Fault Valve Behaviour for Rupture Nucleation and Recurrence |
Publication | Tectonophysics |
Date | 1992 |
Volume number | 211 |
Pages | 283--298 |
Description | Reference for fault valving |
Author | Bodmer H P |
---|---|
Title | The Use of Seismological Data to Predict Overpressures |
Publication | Bull. Swiss. Assoc. of Petroleum - Geol. and Eng |
Date | 1994 |
Volume number | 61 |
Pages | 69--81 |
Description | Reference for illustration of fault valving |
Author | Chadwick R A, Zweigel P, Gregersen U, Kirby G A, Holloway S and Johannessen P N |
---|---|
Title | Geological Characteristics of CO2 Storage Sites: Lessons from Sleipner, Northern North Sea |
Publication | Presentation from the 6th Greenhouse Gas Control Technologies Conference, Kyoto |
Date | 2002-10 |
Publisher | Saline Aquifer CO2 Store (SACS) |
Description | Paper drawing some generic conclusions on reservoir characterisation based on the Sleipner operation. |
URL | http://cired.no/project/IK23430000%20SACS/Publications/Chadwick_etal_GHGT6_Sleipner_geology.pdf |
Author | Holtz M, Doughty C, Yeh J and Hovorka S |
---|---|
Title | Modeling of CO2 Saline Aquifer Sequestration and Effects of Residual Phase Saturation |
Publication | AAPG Annual Meeting 2004 |
Date | 2004 |
Publisher | American Association of Petroleum Geologists (AAPG) |
Description | Online abstract for the AAPG Annual Meeting 2004. |
Author | Kolak J J and Burruss R C |
---|---|
Title | An Organic Geochemical Assessment of CO2-Coal Interactions during Sequestration |
Publication | Poster presentation from the Second Annual Conference on Carbon Sequestration, Virginia, 5-8 May 2003 |
Date | 2003-05 |
Publisher | USGS |
Description | Paper describing the extraction of polyaromatic hydrocarbons (PAHs) from coal samples with supercritical CO2. |
URL | http://pubs.usgs.gov/of/2003/of03-453/of03-453-tagged.pdf |
Author | Pruess K, Xu T, Apps J and Garcia J |
---|---|
Title | Numerical Modeling of Aquifer Disposal of CO2 |
Publication | Paper SPE-66537, presented at SPE/EPA/DOE Exploration and Production Environmental Conference, San Antonio, Texas |
Date | 2001-02 |
Publisher | GEO-SEQ, a National Energy Technology Laboratory (NETL) sponsored project |
Description | This paper presents scoping studies of the amounts of CO2 that can be trapped into the various phases (gas, aqueous, and solid) for a range of conditions that may be encountered in typical disposal aquifers. |
Author | De Marsily G |
---|---|
Title | Quantitative Hydrogeology: Groundwater Hydrogeology for Engineers |
Date | 1986 |
Publisher | Academic Press, Orlando |
Description | Quantitative hydrogeology textbook by Ghislain de Marsily, Paris School of Mines |
Author | Zweigel P, Arts R, Bidstrup T, Chadwick A, Eiken O, Gregersen U, Homborg M, Johanessen P, Kirby G, Kristensen L and Lindberg E |
---|---|
Title | Results and Experiences from the First Industrial-scale Underground CO2 Sequestration Case (Sleipner Field, North Sea) |
Publication | Extended abstract from the Annual Meeting of the American Association of Petroleum Geologists (AAPG), June 2001, Denver, Colorado |
Date | 2001-06 |
Description | Paper describing results from determining the Sleipner reservoir storage properties, monitoring of storage to date and simulation of storage. |
URL | http://cired.no/project/IK23430000%20SACS/Publications/Zweigeletal_2001_AAPG_extabstr.pdf |
Author | Smelror M, Kelly S R A, Dypvik H, Mork A and Nagy J |
---|---|
Title | Mjølnir (Barents Sea) Meteorite Impact Ejecta offers a Volgian-Ryazanian Boundary Marker |
Publication | Newsletter on Stratigraphy, 46(2/3) |
Date | 2001-05-31 |
Volume number | 38 |
Pages | 129--140 |
URL | http://rogov.zwz.ru/Smelror%20et%20al.,%202001_Mjolnir.pdf |
Author | Stevens S H, Fox C, White T, Melzer S, and Byrer C |
---|---|
Title | Production Operations at Natural CO2 Fields: Technologies for Geologic Sequestration |
Publication | Greenhouse Gas Control Technologies: Proceedings of the 6th International Conference on Greenhouse Gas Control Technologies |
Date | 2003 |
Publisher | Pergamon, Oxford, UK |
Volume number | 1 |
Pages | 429--433 |
Description | Paper reviewing key operational activities at three commercial CO2 fields in the USA |
Author | Mito S, Xue Z and Ohsumi T |
---|---|
Title | Mineral trapping of CO2 at Nagaoka test site |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Giorgis T, Carpita M, Battistelli A and Marzorati D |
---|---|
Title | Modeling brine evaporation and halite precipitation driven by CO2 injection in depleted gas reservoirs |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Haszeldine S, Lu J, Wilkinson M and Macleod G |
---|---|
Title | Long-timescale interaction of CO2 storage with reservoir and seal: Miller and Brae natural analogue fields North Sea |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Raistrick M, Shevalier M, Mayer B, Durocher K, Perez R, Hutcheon I, Perkins E and Gunter B |
---|---|
Title | Using carbon isotope ratios and chemical data to trace the fate of injected CO2 in a hydrocarbon reservoir at the IEA Weyburn Greenhouse Gas Monitoring and Storage Project, Saskatchewan, Canada |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Gibson-Poole C, SvendsenL, Ennis-King J, Watson M, Daniel R and Rigg A |
---|---|
Title | Using stratigraphic heterogeneity to improve containment and capacity in the geological storage of CO2 |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Metcalfe R, Ueda A, Kato K, Ohsumi T, Yajima T, Ito H, Kaieda H, Takase H, Savage D and Benbow S |
---|---|
Title | The feasibility of sequestering CO2 in geothermal systems: a theoretical evaluation |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Chalbaud C, Robin M and Egermann P |
---|---|
Title | Interfacial tension of brine/CO2 systems at reservoir conditions |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Suekane T, Mizumoto A, Nobuso T, Yamazaki M, Tsushima S and Hirai S |
---|---|
Title | Solubility and Residual Gas Trappings of CO2 in Geological Storage |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Kuuskraa V and Koperna G |
---|---|
Title | Assessing and Expanding CO2 Storage Capacity in Depleted and Near-Depleted Oil Reservoirs |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Bradshaw J, Bachu S, Bonijoly D, Burruss R, Holloway S, Christensen N and Mathiassen O |
---|---|
Title | CO2 storage capacity estimation: issues and development of standards |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Dahowski R and Bachu S |
---|---|
Title | Timing of reservoir availability and impacts on CO2 storage in the Alberta Basin, Canada |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Hovorka S |
---|---|
Title | Frio Brine Storage Experiment - Lessons Learned |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | van der Meer L, Kreft E, Geel C, Hoore D and Hartmann J |
---|---|
Title | Enhanced gas recovery testing in the K12-B reservoir by CO2 injection, a reservoir engineering study |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Yamamoto K, Koide H, Tosha T, Aoyagi R, Nakanishi S, Todaka N, Benson S, Rutqvist J and Lewicki J |
---|---|
Title | Natural Analogue Study for Geological Sequestration of CO2 at the Matsushiro Earthquake Fault Zone, Japan: CO2 Seepage Mechanism |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Mignot V, Le Gallo Y, Lecomte J, Euzen T, Vallaure T and Mallo J |
---|---|
Title | Casablanca Field, a depleted karstic oil reservoir for geological storage of CO2 |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Springer N, Lindgren H |
---|---|
Title | Caprock properties of the Nordland Shale recovered from the 15/9-A11 well, the Sleipner area |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Faiz M, Saghafi A, Barclay S, Stalker L, Sherwood N and Whitford D |
---|---|
Title | Distribution of Juvenile CO2 in the Sydney Basin, Australia: A Natural Analogue for CO2 Storage in Bituminous Coals |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | van Bergen F, Pagnier H, Krzystolik P |
---|---|
Title | Field experiment of CO2-ECBM in the Upper Silesian Basin of Poland |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Connell L, Day S, Pan Z, Duffy G, Sakurovs R, Saghafi A and Wright J |
---|---|
Title | CO2 Sequestration in Australian Coal Seams: Feasibility and Plans for Pilot Study |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Shitashima K, Maeda Y, Koike Y and Ohsumi T |
---|---|
Title | Fate of liquid CO2 discharged from the hydrothermal area in the Okinawa Trough |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Kita J and Watanabe Y |
---|---|
Title | Impact assessment of high-CO2 environment on marine organisms |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Ishida H, Fukuhara T, Watanabe Y, Shirayama Y, Golmen L, Kita J, Magi M and Ohsumi T |
---|---|
Title | Assessing the effect of high concentration of CO2 on deep-sea benthic microorganisms using a benthic chamber system |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Pearce J, Chadwick A, Kirby G, Holloway S |
---|---|
Title | The objectives and design of generic monitoring protocols for CO2 storage |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Sakai A |
---|---|
Title | 4D seismic monitoring of the carbon dioxide geologic sequestration onshore in Japan |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Chadwick A, Noy D, Lindeberg E, Arts R, Eiken O and Williams G |
---|---|
Title | Calibrating reservoir performance with time-lapse seismic monitoring and flow simulations of the Sleipner CO2 plume |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Daley T, Myer L, Hoversten G, Peterson J and Korneev V |
---|---|
Title | Borehole Seismic Monitoring of Injected CO2 at the Friio Site |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Dodds K, Sherlock D, Urosevic M, Etheridge D, de Vries D and Sharma S |
---|---|
Title | Developing a Monitoring and Verification Scheme for a Pilot Project, Otway Basin, Australia |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Ebrom D, Buddery D, Watts G, Taylor B |
---|---|
Title | Monitoring activities at In Salah |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Papanikolau N, Lau B, Hobbs W and Gale J |
---|---|
Title | Safe storage of CO2: experience from the natural gas storage industry |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | West J, Pearce J, Bentham M, Rochelle C, Maul P and Lombardi S |
---|---|
Title | Environmental Issues and the Geological Storage of CO2 - a European Perspective |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Benbow S, Metcalfe R and Egan M |
---|---|
Title | Handling uncertainty in safety assessments for long term geological storage of CO2 |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Birkholzer J, Pruess K, Lewicki J, Rutqvist J, Tsang C and Karimjee A |
---|---|
Title | Large releases from CO2 storage reservoirs: analogs, scenarios, and modeling needs |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Bryant S, Lakshminarasimhan S and Pope G |
---|---|
Title | Influence of Buoyancy-Driven Migration on CO2 Storage Capacity and Risk Assessment |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Barlet-Gouédard V, Rimmelé G and Goffé B |
---|---|
Title | Well Technologies for CO2 Geological Storage: Construction, Repair, Plugging Material and Procedures for Long Term Integrity |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Bachu S and Watson T |
---|---|
Title | Possible indicators for CO2 leakage along wells |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Carey J, Wigand M, Chipera S, WoldeGabrial G, Pawar R, Lichtner P, Wehner S, Raines M, Guthrie G |
---|---|
Title | Analysis and Performance of Oil Well Cement with 30 Years of CO2 Exposure from the SACROC Unit, West Texas, USA |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Duguid A, Radonjic M and Scherer G |
---|---|
Title | The effect of carbonated brine on the interface between well cement and geologic formations under diffusion-controlled conditions |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Buanew T and Kvamme B |
---|---|
Title | Two approaches to simulation of hydrate formation |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Camps A, Rochelle C, Mildowski T, Long D, Lovell M, Bateman K, Gunn D, Jackson P and Rees J |
---|---|
Title | The underground storage of CO2 at low temperatures and its trapping in solid phases |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Dafaud F, Martinez I, Shilobreeva S, Goffe B and Fiquet G |
---|---|
Title | An experimental study on mineral storage of CO2 in basic and ultrabasic rocks |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Casareto B, Suzuki Y, Niraula M, Magi M and Yamada K |
---|---|
Title | International standard for CO2 sequestration using marine biological system: effect and influence of fertilization |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Casareto B, Magi M, Kurosawa K, Niraula M, Takagi N and Suzuki Y |
---|---|
Title | Role of marine ecosystem for increasing CO2 sinks |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Kishi Y, Watanabe Y, Ishida H and Nakata K |
---|---|
Title | Ecosystem model for assessment of CO2 effects on deep-sea planktonic communities |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Ito T, Kawamura Y, Sekine K and Hayashi K |
---|---|
Title | Laboratory Study of Trapping Enhancement by the In-situ Reaction Method for Geological Storage of CO2 |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Carey J, Duan R, Kaszuba J and Chipera S |
---|---|
Title | Crystal Chemistry and Reactivity of Dawsonite |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Assayag N, Matter J, Ader M and Agrinier P |
---|---|
Title | Water chemistry and isotopic characteristics to monitor fluid-rock interactions during a small scale CO2 injection |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Rochelle C, Bateman K, Pearce J, Turner G, Upton S and Wallis H |
---|---|
Title | Study of water-rock-CO2 reactions using rocking autoclaves and a novel titanium reaction cell |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Bateman K, Turner G, Pearce J, Birchall D and Rochelle C |
---|---|
Title | A large-scale column experiment to study CO2-porewater-rock reactions |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Sterpenich J, Renard S and Pironon J |
---|---|
Title | Reactivity of French Triassic sandstones submitted to CO2 under deep geological storage conditions |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Jacquemet N, Pironon J, Lagneau V, Fraboulet B and Brossolet P |
---|---|
Title | Well materials ageing in H2S-CO2 environment at high pressure and high temperature - experiments and modelling |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Sass B, Gupta N, Jagucki P, Meggyesy D, Massey-Norton J and Spane F |
---|---|
Title | Implications for Geologic Sequestration of CO2 Based on Geochemistry of a Deep Sedimentary Basin in the Midwestern USA |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Kopp A, Bielinski A, Ebigbo A, Class H and Helmig R |
---|---|
Title | Numerical Investigation of Temperature Effects During the Injection of Carbon Dioxide into Brine Aquifers |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | van der Meer L, van Wes J and Nepveu M |
---|---|
Title | An Enhanced Method to Predict the CO2 Solubility Effects in Water at the Reservoir Scale over a very long Time |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Bekri S, Egermann P and Vizika O |
---|---|
Title | A pore network based approach to model permeability evolution due to rock/fluid alterations |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Pironon J, Jacquemet N, Perfetti E, Lhomme T, Debessy J and Teinturier S |
---|---|
Title | Supercritical acid gas storage: what does it mean in terms of fluid density? |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | O'Connor W, Rush G and Gerdemann S |
---|---|
Title | Geological Carbon Sequestration: The Physical and Chemical Impact of CO2 on Saline Aquifer Host Rock |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Hesse M, Tchelepi H and Orr Jr F |
---|---|
Title | Natural convection during aquifer CO2 storage |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Benson S, Tomutsa L, Silin D, Kneafsey T |
---|---|
Title | Core Scale and Pre Scale Studies of Carbon Dioxide Migration in Saline Formations |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Georgescu S, Lindeberg E and Holt T |
---|---|
Title | Co-injection of CO2 and water into non-sealed saline aquifers |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Nindre Y, Pauwels H, Rubert Y, Shepherd T and Pearce J |
---|---|
Title | CO2 trapping at geological time scale: Geohistory of a natural analogue for long term storage |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | May F, Henke C, Berg C, Pusch G, Reinicke K, Meyn R, Rebscher D, Oldenburg C |
---|---|
Title | Storage of CO2, a future option for the mature Altmark gas field? |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Little K, Payenberg T and Lang S |
---|---|
Title | Onshore injection offshore storage - a CO2 storage concept based on sequence stratigraphy in the western Otway Basin, Australia |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Gibson-Poole C, Svensden L, Underschultz J, Watson M, Ennis-King J, van Ruth P, Nelson E, Daniel R and Cinar Y |
---|---|
Title | Meeting the challenge of reducing large-scale CO2 emissions: an example of potential geological CO2 storage from the Gippsland Basin, Australia |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Lucier A, Zoback M, Gupta N and Ramakrishnan T |
---|---|
Title | Geomechanical aspects of CO2 sequestration near coal burning power plants in the Midwestern United States |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Chiaramonte L, Zoback M, Friedmann J and Vicki Stamp |
---|---|
Title | CO2 sequestration, fault stability and seal integrity at Teapot Dome, Wyoming |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Polak S, Zweigel J, Pannetier-Lescoffit S, Lindeberg E, Zweigel P, Kunaver D, Krooss B, Alles S, Schulz H, Faber E, Teschner M, Poggenburg J and May F |
---|---|
Title | The Atzbach-Schwanenstadt gas field - a potential site for onshore CO2-storage and EGR |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Hooper B, Koppe B and Murray L |
---|---|
Title | Clean brown coal utilisation in the Latrobe Valley |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Deflandre J, Andonof L, Fabriol H and White D |
---|---|
Title | Induced microseismicity and CO2 injection at the Weyburn oil field: improvement in source locations |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Chalaturnyk R, Zambrano G, Soderberg H, Lang P, Lawton D and Wichert G |
---|---|
Title | Integrated Instrumental System in an Observation Well for Monitoring CO2 Storage at the Penn West Pilot, Alberta, Canada |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Ide S, Friedmann S and Herzog H |
---|---|
Title | CO2 leakage through existing wells: current technology and regulations |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Shidahara T, Gupta N, Iwasaki S, Suenaga H, Ito Y |
---|---|
Title | A case study on the environmental impact assessment on groundwater in Ohio River Valley region for CO2 geological sequestration |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Yamamoto K and Koide H |
---|---|
Title | Earthquake related fluid migrations: Mechanism, historical records and lessons learnt |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Hawkes C and Bachu S |
---|---|
Title | Regional analysis of geomechanical parameters affecting the safety of CO2 geological storage in the Alberta Basin, Canada |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Lakemann B, Gunter W and Brown K |
---|---|
Title | Establishing and Implementing a Management Framework for CO2 Capture and Geological Storage Activities: CANiCAP and CANiSTORE -- A Canadian Case Study |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Monea M and Preston C |
---|---|
Title | Overview and new directions of the IEA GHG Weyburn-Midale CO2 Monitoring and Storage Project |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Torvanger A, Fuglestvedt J, Grimstad A, Georgescu S, Lindeberg E, Olevier M, Rive N, Rypdal K and Skeie R |
---|---|
Title | Climate impacts of leakage from geological CO2 storage |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Mace M, Hendriks C and Coenraads R |
---|---|
Title | Impacts of EU and international law on the implementation of carbon capture and geological storage in the European Union |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Zakkour P and Haines M |
---|---|
Title | Permitting issues for CO2 capture, transport and geological storage: A review of Europe, USA, Canada, and Australia |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Figueiredo M, Reiner D, Herzog H and Oye K |
---|---|
Title | The Liability of Carbon Dioxide Storage |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Sharma S, Cook P, Robinson S and Anderson C |
---|---|
Title | Regulatory Challenges and Managing Public Perception in Planning a Geological Storage Pilot Project in Australia |
Publication | 8th International Conference on Greenhouse Gas Control Technologies |
Date | 2006-06-22 |
Publisher | Elsevier |
Description | Proceedings from GHGT6 Trondheim, Norway, 19-22 June 2006 |
Author | Maul P, Metcalfe R, Pearce J, Savage D and West J |
---|---|
Title | Performance Assessments for the Geological Storage of Carbon Dioxide: Learning from the Radioactive Waste Disposal Experience |
Publication | International Journal of Greenhouse Gas Control |
Date | 2007 |
Publisher | Elsevier |
Volume number | 1 |
Pages | 444--455 |
Description | doi: 10.1016/S1750-5836(07)00074-6 |
Author | Metz B, Davidson O, Bosch P, Dave R and Meyer L (eds.) |
---|---|
Title | Climate Change 2007: Mitigation |
Publication | IPCC 4th Assessment Report |
Date | 2007 |
Publisher | Cambridge University Press |
Author | Ueda A, Kato K, Ohsumi T, Yajima T, Ito H, Kaieda H, Metcalfe R and Takase H |
---|---|
Title | Experimental studies of CO2-rock interaction at elevated temperatures under hydrothermal conditions |
Publication | Geochemical Journal |
Date | 2005 |
Publisher | The Geochemical Society of Japan |
Volume number | 39 |
Pages | 417--425 |
Author | Jansson P, Naslund J-O and Rodhe L |
---|---|
Title | Ice sheet hydrology - a review |
Publication | SKB Technical Report TR-06-34 |
Date | 2007-03 |
Publisher | SKB |
URL | http://www.skb.se/ |
Author | Degnan P, A Bath, A Cortes, J Delgado, S Haszeldine, A Milodowski, I Puigdomenech, F Recreo, J Silar, T Torres and E-L Tullborg |
---|---|
Title | PADAMOT: Project Overview |
Publication | PADAMOT Project Technical Report |
Date | 2005 |
Publisher | UK Nirex Limited |
URL | http://www.bgs.ac.uk/padamot/home.html |
Author | Lowry T S, James S C, Jensen R M, Lee M Y, Lapping A R, Arnold B W, Gettemy G L, and Meier D K |
---|---|
Title | Preliminary study on hydrogeology in tectonically active areas |
Publication | Sandia National Laboratories Report SAND2006-3570 |
Date | 2006 |
Publisher | Sandia National Laboratories |
Author | Metcalfe R, Hooker P J, Darling W G and Milodowski A E |
---|---|
Title | Dating Quaternary groundwater flow events: a review of available methods and their application |
Publication | Parnell, J. (ed.) 1998. Dating and Duration of Fluid Flow and Fluid-Rock Interaction |
Publisher | Geological Society, London, Special Publications |
Volume number | 144 |
Pages | 233--260 |
Author | Montgomery D R and Manga M |
---|---|
Title | Streamflow and well responses to earthquakes |
Publication | Science |
Date | 2003 |
Volume number | 300 |
Pages | 2047--2049 |
Author | Moore G F et al. |
---|---|
Title | New insights into deformation and fluid flow processes in the Nankai Trough accretionary prism: Results of Ocean Drilling Program Leg 190 |
Publication | Geochemistry, Geophysics, Geosystems |
Date | 2001 |
Volume number | 2 |
Author | Ruddiman, W.F.(ed) |
---|---|
Title | Tectonic uplift and climate change |
Date | 1997 |
Publisher | Springer-Verlag, Berlin |
Author | Tokunaga |
---|---|
Title | Modeling of earthquake-induced hydrological changes and possible permeability enhancement due to the 17 January 1995 Kobe Earthquake, Japan |
Date | 1999 |
Publisher | Journal of Hydrology |
Volume number | 223 |
Pages | 221--229 |
Author | Vomvoris S, Scholtis A, Waber H N, Pearson F J, Voborny O, Schindler M and Vinard P |
---|---|
Title | Lessons learned from the use of hydrochemical data for the evaluation of the groundwater flow models developed within the Swiss L/ILW programme |
Publication | Use of hydrogeochemical information in testing groundwater flow models - technical summary and proceedings of a workshop organized by the NEA Coordinating Group on Site Evaluation and Design of Experiments for Radioactive Waste Disposal (SEDE), Sweden |
Date | 1999 |
Publisher | NEA/OECD |
Pages | 107--115 |
Author | Beaubien  S E, Citoli G and Lombardi S |
---|---|
Title | Carbon dioxide and radon gas hazard in the Alban Hills area (central Italy) |
Publication | Journal of Volcanology and Geothermal Research |
Date | 2003-04-15 |
Publisher | Elsevier |
Volume number | 123 |
Pages | 63--80 |
Description | The link below takes you to the journal website from which you can navigate to Volume 123, Issues 1-2, where the article is located. |
URL | http://www.sciencedirect.com/science/journal/03770273 |
Author | Beaubien S E, Ciotoli G, Coombs P, Dictor M C, Krüger M, Lombardi S, Pearce J M and West J M |
---|---|
Title | The impact of a naturally occurring CO2 gas vent on the shallow ecosystem and soil chemistry of a Mediterranean pasture (Latera, Italy) |
Publication | International Journal of Greenhouse Gas Control |
Date | 2008-07 |
Publisher | Elsevier |
Volume number | 2 |
Pages | 373--387 |
Description | The link below will take you to the International Journal for Greenhouse Gas Control website, from where you can navigate to Volume 2, Issue 3, which is where this article is located. |
URL | http://www.sciencedirect.com/science/journal/17505836 |
Author | Blackford J, Jones N, Proctor R, Holt J, Widdicombe S, Lowe D and Rees A |
---|---|
Title | An initial assessment of the potential environmental impact of CO2 escape from marine carbon capture and storage systems |
Publication | Proceedings of the Institution of Mechanical Engineers, Part A: Journal of Power and Energy |
Date | 2009 |
Publisher | Professional Engineering Publishing |
Volume number | 223 |
Pages | 269--280 |
URL | http://journals.pepublishing.com/content/q7458769481n/?p=1181709f9169441d83ae3dd6977861ad&pi=5 |
Author | Brownman H I et al. |
---|---|
Title | Effects of ocean acidification on marine ecosystems |
Publication | Marine Ecology Progress Series |
Date | 2008-12-23 |
Publisher | Inter-Research |
Volume number | 373 |
Pages | 199--309 |
URL | http://www.int-res.com/articles/theme/m373_ThemeSection.pdf |
Author | Doney S C , Fabry V J, Feely R A and Kleypas J A |
---|---|
Title | Ocean acidification: the other CO2 problem |
Publication | Annual Review of Marine Science |
Date | 2009-01 |
Publisher | Annual Reviews |
Volume number | 1 |
Pages | 169--192 |
URL | http://arjournals.annualreviews.org/doi/abs/10.1146/annurev.marine.010908.163834?cookieSet=1&journalCode=marine |
Author | Hall-Spencer J M, Rodolfo-Metalpa R, Martin S, Ransome E, Fine M, Tuner S M, Rowley S J, Tedesco D and Buia M-C |
---|---|
Title | Volcanic carbon dioxide vents show ecosystem effects of ocean acidification |
Publication | Nature |
Date | 2008-07-03 |
Publisher | Nature Publishing Group |
Volume number | 454 |
Pages | 96--99 |
URL | http://www.nature.com/nature/journal/v454/n7200/index.html |
Author | Hofman M and Schnellhuber H-J |
---|---|
Title | Oceanic acidification affects marine carbon pump and triggers extended marine oxygen holes |
Publication | PNAS |
Date | 2009-03-03 |
Publisher | National Academy of Sciences |
Volume number | 106 |
Pages | 3017--3022 |
URL | http://www.pnas.org/content/106/9.toc |
Author | Iglesias -Rodriguez M D, Halloran P R, Rickaby R E M, Hall I R, Colmenero-Hidalgo E, Gittins J R, Green D R H, Tyrrell T, Gibbs S J, von Dassow P, Rehm E, Armbrust E V and Boessenkool K P |
---|---|
Title | Phytoplankton Calcification in a High-CO2 World |
Publication | Science |
Date | 2008-04-18 |
Publisher | AAAS |
Volume number | 320 |
Pages | 336--340 |
URL | http://www.sciencemag.org/content/vol320/issue5874/index.dtl |
Author | Ishida H, Watanabe Y, Fukuhara T, Kaneko S, Furusawa K, and Shirayama Y |
---|---|
Title | In situ enclosure experiment using a benthic chamber system to assess the effect of high concentration CO2 on deep-sea benthic communities |
Publication | Journal of Oceanography |
Date | 2005 |
Publisher | TERRAPUB |
Volume number | 61 |
Pages | 835--843 |
URL | http://www.terrapub.co.jp/journals/JO/frame/61.html |
Author | Kling G W, Clark M A and Compton H R |
---|---|
Title | The 1986 Lake Nyos Gas Disaster in Cameroon, West Africa |
Publication | Science |
Date | 1987-04-10 |
Publisher | AAAS |
Volume number | 236 |
Pages | 169--175 |
URL | http://www.sciencemag.org/content/vol236/issue4798/index.dtl |
Author | Lambeck K, Esat T M and Potter E K |
---|---|
Title | Links between climate and sea levels for the past three million years |
Publication | Nature |
Date | 2002-09-12 |
Publisher | Nature Publishing Group |
Volume number | 419 |
Pages | 199--206 |
URL | http://www.nature.com/nature/journal/v419/n6903/index.html |
Author | Manabe S and Stouffer R J |
---|---|
Title | Century-scale effects of increased atmospheric CO2 on the ocean-atmosphere system |
Publication | Nature |
Date | 1993-07-15 |
Publisher | Nature Publishing Group |
Volume number | 364 |
Pages | 215--218 |
URL | http://www.nature.com/nature/journal/v364/n6434/index.html |
Author | Mitchell A C, Phillips A J, Hamilton M A, Gerlach R, Hollis W K, Kaszuba J P and Cunningham A B |
---|---|
Title | Resilience of planktonic and biofilm cultures to supercritical CO2 |
Publication | The Journal of Supercritical Fluids |
Date | 2008-12 |
Publisher | Elsevier |
Volume number | 47 |
Pages | 318--325 |
Description | The link below takes you to The Journal of Supercritical Fluids website, from where you can navigate to Volume 47, Issue 2, where this article is located. |
URL | http://www.sciencedirect.com/science/journal/08968446 |
Author | Mitchell A C, Phillips A J, Hiebert R, Gerlach R, Spangler L H and Cunningham A B |
---|---|
Title | Biofilm enhanced geologic sequestration of supercritical CO2 |
Publication | International Journal of Greenhouse Gas Control |
Date | 2009-01 |
Publisher | Elsevier |
Volume number | 3 |
Pages | 90--99 |
Description | The link below will take you to the International Journal of Greenhouse Gas Control website, from where you can navigate to Volume 3, Issue 1, where this article is located. |
URL | http://www.sciencedirect.com/science/journal/17505836 |
Author | Munday P L, Dixson D L, Donelson J M, Jones G P, Pratchett M S, Devitsina G V and Døving K B |
---|---|
Title | Ocean acidification impairs olfactory discrimination and homing ability of a marine fish |
Publication | PNAS |
Date | 2009-02-10 |
Publisher | National Academy of Sciences |
Volume number | 106 |
Pages | 1848--1852 |
URL | http://www.pnas.org/content/106/6.toc |
Author | Riebesell U, Zondervan I, Rost B, Tortell P D, Zeebe R E and Morel F M M |
---|---|
Title | Reduced calcification of marine plankton in response to increased atmospheric CO2 |
Publication | Nature |
Date | 2000-09-21 |
Publisher | Nature Publishing Group |
Volume number | 407 |
Pages | 364--367 |
URL | http://www.nature.com/nature/journal/v407/n6802/index.html |
Author | Shitashima K, Meada Y, Koike Y and Oshumi T |
---|---|
Title | Natural analogue of the rise and dissolution of liquid CO2 in the ocean |
Publication | International Journal of Greenhouse Gas Control |
Date | 2008-01 |
Publisher | Elsevier |
Volume number | 2 |
Pages | 95--104 |
Description | The link below will take you to International Journal of Greenhouse Gas Control website, from which you can navigate to Volume 2, Issue 1, which is where this article is located. |
URL | http://www.sciencedirect.com/science/journal/17505836 |
Author | Siddall M, Rohling E J, Almogi-Labin A, Hemleben Ch, Meischner D, Schmelzer I and Smeed D A |
---|---|
Title | Sea-level fluctuations during the last glacial cycle |
Publication | Nature |
Date | 2003-06-19 |
Publisher | Nature Publishing Group |
Volume number | 423 |
Pages | 853--858 |
URL | http://www.nature.com/nature/journal/v423/n6942/index.html |
Author | Smith Jr K L, Baldwin R J, Ruhl H A, Kahru M, Mitchell B G and Kaufmann R S |
---|---|
Title | Climate effect on food supply to depths greater than 4,000 meters in the northeast Pacific |
Publication | Limnology and Oceanography |
Date | 2006-01 |
Publisher | American Society of Limnology and Oceanography |
Volume number | 51 |
Pages | 166--176 |
URL | http://www.aslo.org/lo/toc/vol_51/issue_1/index.html |
Author | Sunda W and Guillar R R L |
---|---|
Title | The relationship between cupric ion activity and the toxicity of copper to phytoplankton |
Publication | Journal of Marine Research |
Date | 1976 |
Publisher | Yale University |
Volume number | 34 |
Pages | 511--529 |
Author | Tamburri M N, Peltzer E T, Friederich G E, Aya I, Yamane and Brewer P |
---|---|
Title | A field study of the effects of CO2 ocean disposal on mobile deep-sea animals |
Publication | Marine Chemistry |
Date | 2000-12 |
Publisher | Elsevier |
Volume number | 72 |
Pages | 95--101 |
URL | http://dx.doi.org/10.1016/S0304-4203(00)00075-X |
Author | Teske A |
---|---|
Title | Deep-Sea Hydrothermal Vents |
Publication | Encyclopedia of Microbiology (Third Edition) |
Date | 2009 |
Publisher | Elsevier |
Pages | 80--90 |
Description | The article of interest can be found in the \"Environmental Microbiology and Ecology\" subject classification. |
URL | http://www.sciencedirect.com/science/referenceworks/9780123739445 |
Author | Tomczak M and Godfrey J S |
---|---|
Title | Regional oceanography: an introduction |
Date | 1994 |
Publisher | Daya Publishing House, Dehli |
Author | Turley C, Blackford J C, Widdicombe S, Lowe D, Nightingale P D and Rees A P |
---|---|
Title | Reviewing the Impact of Increases Atmospheric CO2 on Oceanic pH and the Marine Ecosystem |
Publication | Avoiding Dangerous Climate Change |
Date | 2005 |
Publisher | Cambridge University Press |
Author | Watanabe Y, Yamaguchi A, Ishida H, Harimoto T, Suzuki S, Sekido Y, Ikeda T, Shirayama Y, Mac Takahashi M, Ohsumi T and Ishizaka J |
---|---|
Title | Lethality of increasing CO2 levels on deep-sea copepods in the western North Pacific |
Publication | Journal of Oceanography |
Date | 2006 |
Publisher | TERRAPUB |
Volume number | 62 |
Pages | 185--196 |
URL | http://www.terrapub.co.jp/journals/JO/frame/62.html |
Author | West J M, Pearce J M, Coombs P, Ford J R, Scheib C, Colls J J, Smith K L and Steven M D |
---|---|
Title | The impact of controlled injection of CO2 on the soil ecosystem and chemistry of an English lowland Pasture |
Publication | Energy Procedia |
Date | 2009-02 |
Publisher | Elsevier |
Volume number | 1 |
Pages | 1863--1870 |
URL | http://www.sciencedirect.com/science/journal/18766102 |
Author | Widdicombe S, Dashfield S L, McNeill C L, Needham H R, Beesley A, McEvoy A, Ãxnevad S , Clarke K R and Berge J A |
---|---|
Title | Effects of CO2 induced seawater acidification on infaunal diversity and sediment nutrient fluxes |
Publication | Marine Ecology Progress Series |
Date | 2009-03-30 |
Publisher | Inter-Research |
Volume number | 379 |
Pages | 59--75 |
URL | http://www.int-res.com/abstracts/meps/v379/ |
Author | Widdicombe S and Spicer J I |
---|---|
Title | Predicting the impact of ocean acidification on benthic biodiversity: What can animal physiology tell us? |
Publication | Journal of Experimental Marine Biology and Ecology |
Date | 2008-11-15 |
Publisher | Elsevier |
Volume number | 366 |
Pages | 187--197 |
URL | http://dx.doi.org/10.1016/j.jembe.2008.07.024 |
Author | Wood H L, Spicer J I and Widdicombe S |
---|---|
Title | Ocean acidification may increase calcification rates, but at a cost |
Publication | Proceeding of the Royal Society B: Biological Sciences |
Date | 2008-08-07 |
Publisher | Royal Society Publishing |
Volume number | 275 |
Pages | 1767--1773 |
URL | http://rspb.royalsocietypublishing.org/content/275/1644.toc |
Author | Royal Society |
---|---|
Title | Ocean acidification due to increasing atmospheric carbon dioxide |
Date | 2005 |
Publisher | Royal Society Publishing |
Description | Policy document 12/05, ISBN 0 85403 617 2 |
URL | http://www.co2storage.org.uk/Technical/Ocean/Ocean_acidificatiion_Jun_05_Roy_Soc.pdf |
Links
Summary | USGS Bolide Page |
---|---|
Description | USGS page describing bolides |
URL | http://woodshole.er.usgs.gov/epubs/bolide/introduction.html#what_is_a_bolide |
Summary | Intergovernmental Panel on Climate Change (IPCC) |
---|---|
Description | The IPCC has been established by WMO and UNEP to assess scientific, technical and socio- economic information relevant for the understanding of climate change, its potential impacts and options for adaptation and mitigation. |
URL | http://www.ipcc.ch |
Summary | The Hadley Centre |
---|---|
Description | The Hadley Centre for climate prediction and research, which is part of the Met Office, provides a focus in the United Kingdom for the scientific issues associated with climate change. |
URL | http://www.metoffice.gov.uk/climatechange/science/hadleycentre/ |
Summary | Graph of global temperature change, 1861-2000 and 1000-2000 |
---|---|
Description | Graph of global temperature change, 1861-2000 and 1000-2000 (JPEG Image - IPCC) |
URL | http://www.ipcc.ch/ipccreports/tar/slides/large/05.16.jpg |
Summary | BIOCLIM website |
---|---|
Description | An EU 5th Euratom Framework Programme considering how to represent long-term climate and environmental change within assessments of deep geological radioactive waste disposal |
URL | http://www.andra.fr/bioclim/ |
Summary | Climate.org |
---|---|
Description | Homepage for the Climate Institute |
URL | http://www.climate.org/ |
Summary | Coal-Seq website |
---|---|
Description | The Coal-Seq project has the objective of demonstrating CO2 sequestration in coal seams using enhanced coalbed methane (ECBM) recovery technology |
URL | http://www.coal-seq.com/ |
Summary | Saline Aquifer CO2 Storage (SACS) |
---|---|
Description | An offshore demonstration of saline aquifer CO2 storage at the Sleipner field |
URL | http://www.co2captureandstorage.info/project_specific.php?project_id=88 |
Summary | Toxicity of Hydrogen Sulphide Gas |
---|---|
Description | Table of human health effects at different concentrations |
URL | http://www.alken-murray.com/H2SREM9.HTM |
Summary | Material safety data sheets |
---|---|
Description | Material safety data sheets contained on the Physical and Theoretical Chemistry Laboratory website of the University of Oxford |
URL | http://physchem.ox.ac.uk/MSDS/ |
Summary | GEO-SEQ Monitoring Page |
---|---|
Description | GEO-SEQ page associated with identifying and demonstrating reliable and cost-effective systems for monitoring CO2 migration in the subsurface. |
URL | http://www-esd.lbl.gov/co2geostorage/research/geoseq/geoseq.html |
Summary | Quest Consulting Thermodynamics |
---|---|
Description | Allows browsers to use the Peng-Robinson equation of state to calculate the thermodynamic properties of fluids online. |
URL | http://www.questconsult.com/thermo_intro.html |
Summary | Chemistry Comes Alive |
---|---|
Description | CO2 phase behaviour page |
URL | http://jchemed.chem.wisc.edu/JCESoft/CCA/CCA2/MAIN/LIQUIFA/CD2R1.HTM |
Summary | Chematur Engineering |
---|---|
Description | Supercritical CO2 page from Chematur Engineering page. |
URL | http://www.chematur.se/ |
Summary | Solubility of CO2 and Volumetrics |
---|---|
Description | MIDCARB calculator for CO2 solubility and volumetrics in aquifer sequestration. |
URL | http://www.kgs.ku.edu/Magellan/Midcarb/aquifer.html |
Summary | Sequestration volume calculator |
---|---|
Description | MIDCARB sequestration volume calculator |
URL | http://www.kgs.ku.edu/Magellan/Midcarb/vol_prop.html |
Summary | USGS Earthquakes |
---|---|
Description | USGS earthquake pages |
URL | http://earthquake.usgs.gov/ |
Summary | CO2 page from Science is Fun |
---|---|
Description | CO2 page from Science is Fun |
URL | http://scifun.chem.wisc.edu/ |
Summary | USGS Gas Hydrate Studies Page |
---|---|
Description | USGS Gas Hydrate Studies Page |
URL | http://woodshole.er.usgs.gov/project-pages/hydrates/index.html |
Summary | Schlumberger Oilfield Glossary |
---|---|
Description | Glossary of oilfield terminology |
URL | http://www.glossary.oilfield.slb.com/default.cfm |
Summary | Geological structures page of Georgia Perimeter College website |
---|---|
Description | Fault image from the Geological structures page of Georgia Perimeter College website (text associated with the lecture can be found at: http://facstaff.gpc.edu/~janderso/physical/struct.htm) |
URL | http://facstaff.gpc.edu/~janderso/images/faults.jpg |
Summary | RECOPOL website |
---|---|
Description | The RECOPOL project is an EU funded combined research and demonstration project to investigate the possibility of permanent subsurface storage of CO2 in coal. |
URL | http://recopol.nitg.tno.nl/ |
Summary | PTRC Weyburn-Midale CO2 Project website |
---|---|
Description | The Petroleum Technology Research Centres Weyburn-Midale CO2 Project website. |
URL | http://www.ptrc.ca/weyburn_overview.php |
Summary | IEA Greenhouse Gas R&D Programme website |
---|---|
Description | IEA Greenhouse Gas R&D Programme website |
URL | http://www.ieaghg.org/ |
Summary | Lake Nyos website |
---|---|
Description | Website about the limnic eruption events at Lake Nyos. |
URL | http://perso.wanadoo.fr/mhalb/nyos/ |
Summary | USGS Mammoth Mountain website |
---|---|
Description | USGS Mammoth Mountain website |
URL | http://lvo.wr.usgs.gov/CO2.html |
Summary | US EPA IRIS website |
---|---|
Description | US EPA Integrated Risk Information System (IRIS) on human health effects that may result from exposure to chemicals in the environment |
URL | http://www.epa.gov/iris/index.html |
Summary | PhysicalGeography.net |
---|---|
Description | Physical geography website including an online textbook concerning the 'Fundamentals of Physical Geography' from Okanagan University College, Canada |
URL | http://www.physicalgeography.net/home.html |
Summary | USGS volcano glossary |
---|---|
Description | USGS glossary on volcano and hydrologic hazards, features and terminology |
URL | http://vulcan.wr.usgs.gov/Glossary/framework.html |
Summary | USGS Yellowstone Observatory website |
---|---|
Description | Website for the USGS Yellowstone Volcano Observatory |
URL | http://volcanoes.usgs.gov/yvo/ |
Summary | Bristol University dam image |
---|---|
Description | Earthquake engineering and research unit at the University of Bristol |
URL | http://www.ideers.bris.ac.uk/research/dams.html |
Summary | Radio Netherlands article on recycling CO2 |
---|---|
Description | Radio Netherlands article on increasing plant growth in greenhouses by using industrial CO2 |
URL | http://www.radionetherlands.nl/features/science/051107rf |
Summary | PML Marine Ecosystems Modelling |
---|---|
Description | Plymouth Marine Laboratory website concerning marine ecosystems modelling |
URL | http://www.pml.ac.uk/Default.aspx?RecordId=5560 |
Summary | USGS CO2 Sequestration website |
---|---|
Description | US Geological Survey CO2 sequestration website |
URL | http://energy.er.usgs.gov/health_environment/co2_sequestration/ |
Summary | USGS Petrophysics Bibliography |
---|---|
Description | US Geological Survey petrophysics bibliography website |
URL | http://wwwbrr.cr.usgs.gov/projects/GW_borehole/bibliography/petrophysics.html |
Summary | Mining Technology website |
---|---|
Description | Images of the Cordero Rojo Coal Mine, WY, USA |
URL |